S TANDARD P ROTOCOL FOR M EASUREMENT OF F AN AND C OOLING S AVINGS FROM C OMMERCIAL -S ECTOR P ACKAGED R OOFTOP HVAC U NITS Regional Technical Forum March.

Slides:



Advertisements
Similar presentations
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
Advertisements

D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Advanced Rooftop-Unit Control – Retrofit Savings Analysis Overview 1 February 13, 2015 RTF Commercial Rooftop-Unit Working Group Mira Vowles, BPA.
Draft Standard Protocol for Cooling and Fan Savings from RTUs RTF March 1, 2011.
RTF 2012 Workplan Statements of Work January,
Heat Pump Water Heaters Provisional UES Proposal Regional Technical Forum October 4 th, 2011.
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
Premium Rooftop Unit (RTU) Retrofit Overview August 20, 2012 RTF RTU Working Group Mira Vowles, BPA 1.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee November 16, 2011 Mira Vowles, P.E., CEM.
Advanced Power Strips (APS) Planning UES Measure Proposal Regional Technical Forum August 20, 2013.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Heat Pump Water Heaters: Tier 2 – Ducted Interior Installations Provisional UES Proposal Regional Technical Forum February 14 th, 2012.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum February 14, 2012.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Development of RTF Research Plans (and Research Strategies): RTF Role DHP for FAF Research Plan CC&S Research Plan Adam Hadley Regional Technical Forum.
RTF Staff, Subcommittee and Work Updates October 23, 2012.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
GUIDELINES FOR RTF MEASURE LIFE Briefing to the Regional Technical Forum May 15, 2012 Lisa A. Skumatz, Ph.D. Skumatz Economic Research Associates Mark.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
BPA RTU Winter Operation Presented to: RTUG August 2010 Presented by: Kathryn Hile, The Cadmus Group Howard Reichmuth, New Buildings Institute.
Forecasting and Verifying the Energy Savings for Web-Enabled Thermostats in Portable Classrooms: William E. Koran, P.E. Quantum Energy Services and Technologies.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
RTU Measure Preparation for Review as Standard Protocol Staff Request for Authorization of RFP Funding from the Regional Technical Forum 28 June 2011.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee February 22, 2012 Mira Vowles, P.E., CEM.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
SEEM Calibration: Phase II Single Family Heating Energy Regional Technical Forum August 20, 2013 Presented By: Josh Rushton and Adam Hadley Subcommittee.
Staff Updates Regional Technical Forum November 19, 2013.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Evaluation of the RTF Standard Protocol Fan and Cooling Savings from Commercial-Sector Heat Pump Units Rooftop Unit Working Group (RTUG) August 20, 2012.
RTU Savings Research Project RTU Savings Research Project: Findings and Recommendations Regional Technical Forum February 3, 2009 Mark Cherniack Howard.
California Integrated Waste Management Board Consideration Of Scope Of Work, Contractor, And Augmentation Of Contract Allocation For The At-Store Recycling.
Proposed 2013 RTF Work Plan October 23, compared to 2012.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Proposed 2015 RTF Work Plan September 16, Work Plan Development Process RTF 2015 work plan ProcessDate Develop draft work plan and present to Operations.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
Proposal to Allocate Remaining 2010 Funding RTF November 2, 2010.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Variable Capacity Heat Pump RTF Sub-Committee August 28, 2013 Mira Vowles, P.E., CEM.
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum December 13, 2011.
RTUG Jan 2010 PNW RoofTop Unit Working Group - RTUG – Regional RTU Savings Research presentation to PNW Regional Technical Forum January 5, 2010 RTUG Jan.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
RTF Staff, Subcommittee and Work Updates January 23, 2013.
PNW RoofTop Unit Working Group - RTUG – RTU Savings Research Project Phase 3 December 15, 2009.
RTF Administrative Measure Decisions November 14, 2012.
A Reliable but Simplified Method for Measuring the Savings from Advanced RTU Control Retrofits February 13, 2013 Presentation to: RTF Commercial Rooftop.
Proposed 2015 Work Plan and 3 Year Look Back September 18, 2014.
Regional Technical Forum Recommissioning commercial retail facilities: A whole building approach to energy savings April 7th, 2009 Presented by: Jeremy.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Scientific Irrigation Scheduling provisional analysis and research plan BPA December 2014.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
UES MEASURE REVIEW PROJECT Final Report March 14, 2012 Regional Technical Forum Presented by: Jeff Romberger.
A Calculator for Reliably Measuring the Savings from Advanced RTU Control Retrofits August 27, 2015 Presentation to: RTF Commercial Rooftop Unit Working.
1 RTUG Project Management Contract Expansion And RTF 2010 Work Plan Budget Adjustments RTF March 2, 2010.
Presentation transcript:

S TANDARD P ROTOCOL FOR M EASUREMENT OF F AN AND C OOLING S AVINGS FROM C OMMERCIAL -S ECTOR P ACKAGED R OOFTOP HVAC U NITS Regional Technical Forum March 13, 2012

Vast Contributions to Get to This Point  Started Five Phases of RTF work  Significant “Products” and “By-Products”  Much simplified measurement approach (standard protocol)  Better understanding of RTU systems & opportunities  Better understanding of measurement and sampling error  RTU power measurement data library  New Honeywell controller  Dozens of dedicated individuals

Issue: Highly Variable Savings by Site and by Program From BPA 2009

4 Recent Steps to Get to Savings Methodology  Complete collecting & storing the 12-month data  Set up a functioning data repository with open access  Determine confidence in annual savings methodology  Savings too variable for a UES – Need Protocol  Understand the persistence of fan schedules  Examine rooftop metered temperatures vs NOAA site  Initial Calculator developed  Reliability of savings method analyzed & tested  Data block analysis 10, 15, 21, 28 days  Refined seasonal windows for pre & post measurements  Calculator improved, streamlined, user-friendly & dependable  Standard Protocol conformed to guidelines  CT versus True Power tested and rejected (for now)  Scope of applicability refined Research Funded by BPA via Cadmus. Gets RTUG review & technical guidance Development by Coordinated RTF

RTU Subcommittee Involvement  RTUG Meetings –2011: January, August, December –2012: January, February, March  Protocol/Calculator Development Discussions (Contractors, RTF staff, subcommittee members) –December 7, 2011 –December 19 –January 31, 2012 –February 9 –February 16

RTU Subcommittee Members 67 Members (Bold members participated in two or more protocol deliberations): Alan Budman, Alan Mountjoy-Venning, Amy Patenaude, Anthony Hernandez, Bjorn Jensen, Bob Davis, Bruan Van Buskirk, Buck Taylor, Chris Helmers, Dale Gustavson, Dan Gaherty, Daniel Wilkinson, Danny Miller, Dave Baylon, Dave Robison, David Davis, Fred Gordon, Glenn Hensen, Graham Parker, Greta Zink, Jack Callahan, Jack Zeiger, Janice Peterson, Jeff Cole, Joe Schmutzler, John Palmer-Williams, Jon Linn, Jon Powell, Jonathan Wooley, Justin Sipe, Karen Des, Srinivas Katipamula, KC Spivey, Ken Keating, Kristin Heinmeier, Lauren Gage, Levi Westra, Marie McMahon, Mark Jerome, Marshall Hunt, Mike Kennedy, Mike Little, Mike Lubliner, Mira Vowles, Nick O'Neill, Paul Kyllo, Paul Needham, Peter Meyer, Jay Pilliod, Mark Rehley, Rob Penney, Erin Rowe, Sean Gouw, Shea Dibble, Sherry Hu, Stan Price, Judith Stasack, Danny Taasevigen, Tom Foley, Tom Leinhard, Will Miller, Will Price, Travis Reeder, Alan Fraser Contractors: (NBI, NorthWrite, Cadmus, PECI, SBW) Mark Cherniack, Howdy Reichmuth, Bill Koran, Josh Rushton, Reid Hart, Mike Baker RTF Staff: Charles Grist, Mark Kendall

Standard Protocol Sections  P URPOSE  D EFINITION OF K EY T ERMS  E LIGIBLE S YSTEMS AND M EASURES –Rooftop package systems with constant speed supply fan + constant or variable speed compressors –Split systems –Heat pumps in cooling/ventilation modes only –heating must be turned off  R EQUIRED C OMMISSIONING  S AMPLING P ROCEDURE -NA  S UNSET C RITERIA  R EQUIRED K NOWLEDGE AND S KILLS OF P RACTITIONER

Standard Protocol Sections-2  D ATA C OLLECTION R EQUIREMENTS  P ROVISIONAL D ATA C OLLECTION R EQUIREMENTS - NA  S AVINGS E STIMATION S TEPS  E STIMATE OF T YPICAL M EASUREMENT C OST  R ELATIONSHIP TO O THER P ROTOCOLS /G UIDELINES  U SER ’ S G UIDE T O T HE S AVINGS C ALCULATOR

Final RTU Protocol Issues Raised & Addressed-1  Test on multiple sites to better understand confidence interval –Annual use estimates typically plus/minus 5% –Savings estimates plus/minus 20% WHEN savings >25% of annual use  Confidence intervals are wide at the individual unit level  Unit precision levels are low, but can have confidence in program wide savings  Limits of the protocol are stated with eligible measures identified and in field measurement timing  Calculator metrics for measurement error: –R-squared and data range checks

RTU Protocol Confidence Limits Limited Sites Confidence limits are normalized relative to annual energy Confidence limits highest for metering periods starting in late June to mid-July Confidence limits of +- 5% are achieved with metering periods starting in late May and early August

RTU Measure Savings Confidence RTF Policy Considerations  Guidelines call for 80% of cases to be +- 20%  RTU confidence in pre- and post- are 5% of the annual use  The effect of the 5% error on the savings is greater than 5% example: 5% error applied to savings of 50% of annual = 10% error relative to the savings  When savings between pre and post are small Guidelines standard may not be met  Need consideration for small savings measures

Final RTU Protocol Issues Raised & Addressed-2  Pre & Post measurement scheduling: –Can we do Pre- in August and Post- in May? o Yes, but additional effort required ~50% cost--need to fully document set points/schedules and either leave monitoring on all winter or take off/put on –Can we do week-on/week-off testing? o Yes, better way to test only for measures that can be turned on/off. Few measures: controls-related/economizer; added labor costs  Eligible system/measures included, but not specifically tested –split system –variable speed compressor –Demand Control Ventilation (depends on fan cycling/VSD)

Final RTU Protocol Issues Raised & Addressed-3  System & Measure Exclusions—potential for ‘Provisional’ Protocol –VSD supply fan, variable refrigerant flow –Heat pump heating is in development, not yet ready for Provisional Protocol, Savings Calculator cannot yet handle  Hone & specify Protocol measurements: See Protocol Section 8  Develop Savings Calculator steps: See Protocol Section 10  Cost to implement the protocol revised: See Protocol Section 11

Annualized Energy Use / Savings Calculator  Working toward 3 rd -party review of Protocol and Calculator by PNNL  Statistics package is of value—needs funding –Regression stats development –Annualization stats development –Stats in Calculator output –Charts of residuals/confidence intervals –Chart for annualization uncertainty

Other Issues of Note  Costs to implement the measurement protocol are not fixed, cost estimates based on mature program and lessons learned  Savings Calculator is for a single unit verification; not for program evaluation  When are savings too small to detect? –Depends on measures applied to the RTU –Alternate (lower cost) calculation options: changing fan schedule during non-cooling hours--don’t need the Savings Calculator to estimate savings, just multiply fan watts x time  Protocols and calculators need ongoing, variable RTF support –Need to add to 2013 work plan & budget –Savings Calculator statistics package development

Program Evaluation Metering Sample Size Sample sizes to achieve an 80% confidence > 20% precision measurement for evaluating energy savings from similar programs on similar sites Sample sizes are not directly related to the per unit savings protocol and Savings Calculator

RTUG Committee Recommendation  RTUG is being polled for support and any final comments on the proposed Standard Protocol  Will report results to RTF

Proposed RTF Motion  The RTF approves the Rooftop Unit Standard Protocol for active status  Provisional Protocol to be developed for future RTF consideration