Activities Status and Plan for the week D. Giugni Monday Meeting 2012-10-15 1.

Slides:



Advertisements
Similar presentations
Scribe, Watch act 4 scenes, Begin reading act 5 HW: make-up work, redo work Monday: Scribe, Watch act 4 scenes, Begin reading act 5 Tuesday: Scribe, PLN.
Advertisements

Jeopardy Counting Skip Counting Even and Odd Find the pattern Mix Review Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
Lab 09: Performance Test 1 Advanced Energy Vehicle.
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No July 2011 Oxford technical drawings by.
Numbers
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
APD Connector and PC-Board Update NICADD Weekly Status Report Monday July 1, 2003 (Happy Canada Day!) Ian Harnarine.
ER Bundle “final” design D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Victaulic Solutions for “YM Mercury” Chemical & oil carrier - IMO No Owner: Chemfleet – Class: BV Built: 2010 Marmara Tersanesi, Turkey.
If you rolled a die lots of times and recorded the results, what would you estimate the average of these results to be? What averages would be impossible?
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
COURSE 3 LESSON 5-4 Solving Proportions
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Pixel Heaters Refurbishment A.Bitadze.
SSD Status Before and After Dessica Installation Massimo Venaruzzo 04/10/2012 SSD – EN/CV Meeting.
O. Siegmund Brazed body Leak Checking The latest anode on the brazed body assembly seems to have only one leaky pin, others are better than ~10 -9 so the.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Start Typical student project Advanced student project Level of final response.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
First Grade WebQuest. The Caldecott Award is given each year to the best illustrated book for children.
WEEK 1 You have 10 seconds to name…
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
How to Balance a Chemical Equation. H 2 SO 4 + Fe Fe 2 (SO 4 ) 3 + H 2 This equation needs to be balanced!! Follow these steps for a perfectly balanced.
Scrumm meeting. Mechanical Done. Worked on final type What to do? Finish the assembly of the bottom part.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Name of the week: Author and Finisher of our Faith.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Week 16 BIO Finals. No First Five Learning Target: Everything!! Today’s Activities: ● Review on your own...Tomorrow Questions! Notecard: ● Front side.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
NSQP’s + design implications D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
ACC 220 Week 9 Final Project Business Plan Check this A+ tutorial guideline at 220/ACC-220-Week-9-Final-Project-Business-
Status of straw production straw module assembling
Activities Status and Plan for the week
Activities Status and Plan for the week
Beam Pipe and Service Support Structure Production Progress
Yahoo Mail Customer Support Number
Title 1  Our experience drives us forward 2.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
ENV 310 Education on your terms/snaptutorial.com.
Build your own sensing device
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Time Lines.
Essay Brackets Day 1 Objectives:
THANK YOU!.
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
10:00.
Project 3: Development of wireless gas detectors REU Student: Jillian Chandler Graduate mentors: Chris Hughes, Xiaochen Wang, and Alireza Baba Faculty.
Thank you.
Thank you.
Monday, May 14th Letter of Appreciation (Rough Draft); Final Draft Weds Your task– Today, you will draft a letter of appreciation for someone in your.
I will post everyone’s supervisor on the VLE
Remember you can revise at home!
The Interpretation for Body Language 99
Thank You For Purchasing Coeur Designs 11” Shower Extension
Section 15.
Presentation transcript:

Activities Status and Plan for the week D. Giugni Monday Meeting

Plan of the week 2D. GiugniMonday Meeting

Plan of the week 3 Hex’s Production Completed! Week Plan Some marginal leak checking on the pipes extensions Finish up the spares

Plan of the week 4 Final assembly completed !!! Plan of the week Some PP1 wrapping Survey D. GiugniMonday Meeting

EoB Main assemblies activities are COMPLETED: 8 nSQP’s are in hands. Survey requires some wrapping re-do and fixes that will take place before the E- boards installation Env. Sensors production is well advanced. Sensor installation will take place as a side activity. I would skip this meeting next Monday and reconvene in two weeks. Now it’s time to congratulate with all the people that have been working at the project. Looks like the ‘Mission Impossible” has been accomplished. THANKS EVERY BODY … Let us cross the fingers and look forward to the E-Board Loading. D. GiugniMonday Meeting