PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.

Slides:



Advertisements
Similar presentations
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
Advertisements

04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
PS/SPD VFE Electronics Boxes Repairs Philippe Jacquet, Pascal Perret, Guy Reinmuth LPC Clermont 23 October 2007.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
1 Preshower Front-End Electronics Status LHCb group, LPC Clermont OUTLINE PRODUCTION TESTS PRESERIE I PGA ISSUES: ~SOLVED PRESERIE II (…) CALORIMETER MEETING.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Preparation for TS3 Mariana Rihl. Known issues Implications on light leaks on all modules – Visible on current feedback of bias – Confirmed by study performed.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
TC meeting P2 planning wks 3&4 A.Tauro
CALO News Pascal Perret LPC Clermont 22 January 2012.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
DAQ Requirements M. Villa 21/02/2011.
LKr status R. Fantechi.
DCS: Temperature Probes
DCS: Temperature Probes
RICH Status from last RICH meeting
Presentation transcript:

PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont

2 PRS C Side Dommages  PS cables damaged in detector movement (pulse generator): Cut cables: 1 RJ45 signal (SM4T-01) 1 LED trigger cable (SM3) + other cables suspected damaged ( LV PRS VFE, RJ45 signal, LED trigger ? ) PRS TOP boxes oppened last week & fully checked:  LV connectors pulled out of VFE (by pulse generator?): re-connected  No other PRS hard damage / RJ45 cut cable / spare used & cable repaired All C side VFE and their connections tested functionnal last week 4 VFE were seen KO in SM4 Top

3 PRS VFE Powering & Cooling  VFE Marathons ‘patched’ on both sides. PRS voltages ±4 V, following J. Lecoq ‘expert’ recommendation.  All VFE LV power channels fused and connected on patch pannel: A + C side.  VFE Cooling installed on A side (thanks Philippe!). Restored yesterday, both sides, after some confusion …  Temperature is Monitored:  varies from, All OFF: ºC to All ON: º C ( I confirm … )  Issue on PRS SM7 Bottom box. Not cooled. Air buble in the pipe? Under investigation.

4 DAQ: FEB / CROC Exchange PRS2/PRS3 BEFORE AFTER PRS3 PRS2

5 DAQ: FEB / CROC Synchronisation C Side (8 FEBs)

6 DAQ: FEB / CROC Synchronisation A Side (8 FEBs)

7 Outlook C side operational:  CROC sync. Issue (PRS2 now)  Calibration measurements ongoing for VFE synchronization A side close to operational:  CROC sync. Issues (PRS4 & ~PRS7)  Cooling issue on SM7 Bottom  Calibration measurements required for VFE synchronization