Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.

Slides:



Advertisements
Similar presentations
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
SGIA-BOF-kickoff.ppt - CCSDS SGIA - Space to Ground Interoperability Architecture (SGIA) Birds of a Feather (BOF) Out Brief September 16, 2005 Clayton.
CCSDS XML Telemetric and Command Exchange (XTCE)
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
1 CCSDS Information Architecture Working Group SEA Plenary Daniel J. Crichton, Chair NASA/JPL 12 September 2005.
1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.
Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
MOIMS Reportp. 1 Digital Repository Audit and Certification BOF Goal  Obtain CCSDS / ISO approval of a standard that establishes the criteria that a repository.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
1 Information Architecture Working Group October 24, 2015 Information Architecture WG.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
26 October2005 Reston, VA, USA 1 MOIMS AREA: STATUS REPORT, End of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC 26 October
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
Cesg-1 CSS Area Report -- Super BOF Background From A. Hooke to CESG: (CSS AD emphasis ) Date: Fri 02 Oct 2009 To: CESG cc: CMC Subject: Proposed.
CCSDS Meeting CNES Report, 2/11/2004 CNES 1 CCSDS - MOIMS Area Data Archive ingestion WG Information Packaging and Registry WG CNES Report on activity.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
1 CCSDS Information Architecture Working Group Daniel J. Crichton, Chair NASA/JPL 14 September 2005.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
PS 1 26 October 2005 SEA Area Report Reston, VA, USA, 26 October 2005.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
NASA/NSSDC Report to MOIMS DAI/IPR Plenary 16 January 2007 Colorado Springs, USA.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
PS 1 24 Jan 2007 SEA CMC/CESG REPORT Colorado Springs, CO, USA, 24 January 2007.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
May MOIMS PLENARY –Be careful when connecting your laptop in the meeting rooms Responsibility of WG Chair Cost to be covered by WG chair Cost not.
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
Data Archive Ingest WG Report to MOIMS Plenary May 14, 2004.
NASA MSFC Engineering Directorate Mission Operations Laboratory Page 1 Bob SANA End of Meeting Summary.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
PS 1 19 September 2005 SEA Area Report Atlanta, Georgia, USA, 19 September 2005.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan May 2010 Portsmouth, Virginia, USA Takahiro Yamada, JAXA/ISAS.
National Aeronautics and Space Administration 1 CCSDS Information Architecture Working Group Daniel J. Crichton NASA/JPL 24 March 2005.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
SEA AREA MID-TERM REPORT May 2004PS 1 System Engineering (SEA) AREA REPORT (with CESG Updates) 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
SEA Area Report Reston, VA, USA, 26 October October 2005.
Digital Repository Audit and Certification BOF
Security WG: Report of the Fall 2013 Meeting
Delta-DOR WG: Report of the Fall 2010 Meeting
Joint IPR/DAI Workshop
Presentation transcript:

Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL

Executive Summary Six people attended the IA meeting from JPL, GSFC, Marshall and CSA. The draft Information Architecture Green Book was discussed including the updates from the NASA TIM that occurred in August. There continues to be more convergence between GSFC and JPL with respect to the relationship between IA and OAIS. Chapter 2, the information model, requires more substantial updates than chapter 3, the functional information management components. The afternoon session was canceled in lieu of a discussion on XML best practices

Progress Achieved Significant progress has been achieved since July and we have received quite a few comments. Participants seems willing to continue their involvement and to see the green book get published. Some discussion occurred on the need to develop more examples. Some discussion occurred on the need for a TIM on registries, at least at the NASA level.

Schedule (from March 2005 charter)

Open Issues While there exists more CCSDS participation, it is still minimal across the agencies. Similarities exist between “Reference Architecture for Space Information Management” and the OAIS, but differences are: –OAIS is a reference model and process focusing on preservation and archive. Data model is specific to archiving. –IA focusing on a cross-cutting information management reference architecture applicable across mission lifecycle Modeling notations and disagreement on how to best render an architecture still continues to be problematic –Using UML class diagrams for components, interfaces and data models Individuals with solid experience architecting data-driven systems IA-related occurring in multiple places (Atlanta and Toulouse). Prevents adequate cross-group interactions.

Action Items Send meeting notes, presentations and comments to IAWG –To: Info Arch WG Members –Due: Due September 30, 2005 Add participants to mailing list and send document to SEA Exec –To: SEA Exec –Due: Due September 2005 Send an updated version of the green book by Oct 10, 2005 –To: IAWG Members –Due: Due October 2005 Send to the IA Greenbook to the CESG –To: CESG –Due: November 2005

Resource Problems There may not be enough resource commitments from member agencies to achieve deliverables. ESA and CNES considered important stakeholders.

Cross Area WG / BOF Issues Need on-going coordination with MOIMS Information Packaging and Registries (IPR). –Much more partnering is occurring with a focus on how to define an information infrastructure (interfaces, specifications, architecture, components and best practices) –Recommend that BoF be created for cross-cutting information infrastructure specification (registries, repositories) that gets participation from agency specialists as well as stakeholders IA becoming more important to other groups –SLE (data dictionaries, XML schemas, …) –XML standards and guidelines –SANA

Resolutions to be Sent to CESG and Then to CMC None

New Working Items, New BOFs, etc. Critical that a combined registries effort be initiated across groups