Presentation is loading. Please wait.

Presentation is loading. Please wait.

IPR WG REPORT November 20041 Information Packaging and Registries WG REPORT November 2004.

Similar presentations


Presentation on theme: "IPR WG REPORT November 20041 Information Packaging and Registries WG REPORT November 2004."— Presentation transcript:

1 IPR WG REPORT November 20041 Information Packaging and Registries WG REPORT November 2004

2 IPR WG REPORT November 20042 CONTENTS A.SUMMARY TECHNICAL STATUS OF THE WG B.CROSS-AREA TECHNICAL ISSUES C.OTHER ISSUES AND CONCERNS D.PROPOSED WG RESOLUTIONS/ACTION ITEMS

3 IPR WG REPORT November 20043 B.SUMMARY TECHNICAL STATUS The purpose of this Working Group is to: 1.Collect use cases from the space operations community and develop requirements for XML data packaging 2.Develop a set of recommendations that specify an extensible framework for packaging data and metadata, that can contain an object physically, by Universal Resource Locator(URL) or by Universal Resource Identifier(URI) or by Universal Resource Name(URN), includes the ability to express appropriate relationships, using XML and related techniques, and the implementation of the packaging format in an appropriate set of network and file protocol 3.Oversee the implementation of at least two implementations of the packaging framework, associated with usability and interoperability tests in many areas of space data systems 4.Based on testing develop a second version of the recommendations Based on testing experience and requirements from various Space Data and Operations Groups, establish a registry/repository standard that is extensible, addressing data structures and information modeling, that leverages the more widely based registry work such as ebXML and that also supports the data packaging registry/repository requirements.

4 IPR WG REPORT November 20044 B.SUMMARY TECHNICAL STATUS (cont) Working Group Status: Active Working Group Summary Situation: OK Working Group Summary progress: November 16 - Frozen XFDU Schema and Interoperability Profile for testing by agency November 23- Release Version 1 of XFDU toolkit updated for November 16 Schema and Functionality December 1 - Summary of test use cases, goals and high level schedules distributed to working group December 8, January 12, January 26, February 9, February 23, March 9 1 - 2 Hours Telecon 7 PST, 10 EST, 4CST April 4 - Interim testing report April 11-15 Implementer WS, draft Redbook, draft best practices/tutorial May 15 - Additional testing / updates August 15 - Release for review Two prototypes scheduled : one NASA (XFDU Toolkit), one CNES

5 IPR WG REPORT November 20045 B.SUMMARY TECHNICAL STATUS (cont) Problems and Issues: Some minor XFDU schema issues to be solved during prototyping : Enumerated list creation Namespace issues (schema registry)...

6 IPR WG REPORT November 20046 A.Issue 1 : Updated SANA charter not approved by the WG. Low level work to be done by other areas. C.CROSS-AREA TECHNICAL ISSUES

7 IPR WG REPORT November 20047 D.OTHER ISSUES AND CONCERNS A.Issue 1 NASA resources for IPR WG to be confirmed (other agencies ??) A.Issue 2 CCSDS meetings to be scheduled a year ahead.

8 IPR WG REPORT November 20048 E.PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL None


Download ppt "IPR WG REPORT November 20041 Information Packaging and Registries WG REPORT November 2004."

Similar presentations


Ads by Google