Presentation is loading. Please wait.

Presentation is loading. Please wait.

[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)

Similar presentations


Presentation on theme: "[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)"— Presentation transcript:

1 [Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
Replace [bracketed text] with your information. Throughout: Delete all red / blue / green boxes. 1 1 1

2 [Area Name] Meeting Demographics
Plenary WG 1 WG 2 WG 3 WG 4 WG 5 ASI CNES CNSA CSA DLR ESA INPE JAXA NASA RFSA UKSA Other TOTAL Meeting Duration Agency Diversity JAXA is interested, resources being identified. Possible issues getting resources allocated / schedule.

3 [Area Name] Executive Summary
[Name] Working Group: Achievements [Brief text] Problems / Issues [Name] SIG Group (if any) [Name] BOF Group (if any) This chart is a “must”, because the CESG members uses it for high level presentations (i.e. IOAG, internal Agency meetings, etc.) showing only the Area’s executive summary Shown in 1 page but extendable maximum to 2 pages JAXA is interested, resources being identified. Possible issues getting resources allocated / schedule.

4 [Area Name] [WG Name] Executive Summary
Shown in 1 page but extendable maximum to 2 pages Goals for this meeting cycle: [Brief statement] Working Group Status: [Progress Summary, Major accomplishments (maximum 2 or 3 lines of text per bullet)] Problems and Issues: [Bullets as needed (maximum 1 or 2 lines of text per bullet)] Planning: Interaction with other WGs [Bullets as needed (1 or 2 lines of text per bullets)] Resolutions [Resolution 1 Brief text, because AD will have a resolution summary at the end of his report to CESG] [Resolution 2] JAXA is interested, resources being identified. Possible issues getting resources allocated / schedule. AD shall include these 1 or 2 VGs and include them in the Area report

5 [Area Name] Approved Project Status cutting / pasting the related
Full List of Area approved Projects (including all WGs) cutting / pasting the related To be produced by tables of the WG report JAXA is interested, resources being identified. Possible issues getting resources allocated / schedule.

6 [Area Name] Resource Issues for Approved Projects
Only addressing approved Projects Mainly for missing proto 2 resources No resource issue  No chart WGs affected are MOIMS NAV MOIMS SM&C SIS DTN

7 [Area Name]Upcoming New Work Items
WGs to state which new Projects (and being currently draft Projects) will Be submitted for CMC Approval in the next 6 months SEA SA Layer architecture MB draft projects lacking resources have to be adressed in this chart SLS C&S Prox 1 If no new Project in next 6 months  No chart 1 chart at Area level 7 7 7

8 [Area Name] Planned Resolution Summary
[Name] Working Group: Resolution 1: [Brief Text] Resolution 2: [Brief Text] [Name] SIG: (if any) [Name] BOF Name (if any) Maximum 1 page JAXA is interested, resources being identified. Possible issues getting resources allocated / schedule.

9 [Area Name] Issues for CESG / CMC
[Brief Text] Issue 2: Issue 3: Maximum 1 page JAXA is interested, resources being identified. Possible issues getting resources allocated / schedule.


Download ppt "[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)"

Similar presentations


Ads by Google