WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, Y. Bessler (FZJ), M. Klaus (TUD), H. Quack (TUD) TAC12 Presenters:

Slides:



Advertisements
Similar presentations
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Advertisements

ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Progress and Plans: Target John Haines Head of Target Division Nov 5, 2014.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Target Project Progress and Plans Eric Pitcher TAC-10 November 5, 2014.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang June 2015.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Mitglied der Helmholtz-Gemeinschaft TIK 3.1 Moderator & Reflector System TAC Meeting 15. October 2015 | Yannick Beßler (FZJ), Daniel Lyngh (ESSS)
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
TIK 3.1 Moderator & Reflector System
Mitglied der Helmholtz-Gemeinschaft Twister 15. Januar Shaft Moderators & Reflectors Radial Bearing Axial Bearing Target Rotation and lifting device.
Kick-off Objectives according to TIK The main objective of the kick-off meeting is to confirm the mutual understanding of the Scope of Work specified herein,
Monolith design update – Emphasis on Neutron beam extraction design
Mitglied der Helmholtz-Gemeinschaft ESS cold and thermal Moderators Moderator & Reflector System Project Introduction Meeting | Yannick Beßler,
October, 2009 Cost of SRF Components Gary McIntyre October, 2009 Internal Review.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
20 July 2004 LAL/IN2P3 – CERN meeting on CNGS horns Presentation by K. Elsener 1 OUTLINE 1.Status 2.Preliminary conclusions of the CNGS Review Board (30.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
WP7 Plan – Pilot TSS Cost – Risks Linda R. Coney Group Leader – Target Safety and Controls 15 – 16 February 2016.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
Status and Plans for the Target Safety System Linda R. Coney Group Leader – Target Safety and Controls April 1-2, 2015.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Overview of the ESS Linac Cryogenic Distribution System
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Responses to Recommendations from tTAC-10 John Haines Head of Target Division April 1, 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, M. Andersson, M. Pucilowski, T. Hedlund, A. Olsson TAC11 Lund, 1 st.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
CBM magnet overview of the BINP work
Cryomodule test stand at ESS site
Making Difficult Decisions in a Transparent Way –
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
The report on the IBR-2 modernization
News and brief overview of Beamline plans for the next few months
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
ESS Target Cryogenic System European Cryogenic Days CERN
4th BrightnESS Best Practice Workshop VAT exposure related to ESS Installations in Sweden Carlo J. Bocchetta.
Target collaboratin Board Meeting
RF systems introduction
The Bunker Project Overview Zvonko Lazic
Target Helium Cooling System Design Code 10th Target Technical Board Meeting Ulf Odén WP2 Manager 19 April, 2019.
General Assembly Meeting
Czech in kind contribution – target technologies
High Level Readiness Reviews
Operation of Target Safety System (TSS)
Feedback from IKON 14 Spectroscopy.
Test Beamline System Requirements and Charge to PDR Committee
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
TSS Management: Procurement & Installation Planning
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Overview of the TARGET Monolith Rough Vacuum
TIK-4.3 Irradiation Module
Presentation transcript:

WP 12.3 Moderator & Reflector Systems D. Lyngh, M. Kickulies, J. Ringnér, J. Jurns, Y. Bessler (FZJ), M. Klaus (TUD), H. Quack (TUD) TAC12 Presenters: Daniel Lyngh, Work Package Lead Engineer ESS Jesper Ringnér, Work Unit Lead Engineer ESS Yannick Bessler, IKC Project Manager FZJ

Outline Project Highlights – Recent Progress – Schedule (PDR & CDR) – TAC recommendations TIK 3.1 Moderator & Reflector Components – Introduction of In-Kind Partner Forschungszentrum Juelich – Cold & Thermal Moderator Design & Manufacturing – Beryllium alternative Concept – Twister Design Developments TIK 3.2 & 3.3 Cryogenics Systems – Systems Overview 2

Recent Progress In-Kind Contribution from Forschungszentrum Juelich – Agreement coming into place – IKC work initiated Moderator & Reflector Plugs (MR Plugs) – Preliminary Design Reviews Performed June -15 Cryogenic Cooling System – Preliminary Design Reviews Performed June -15 – Helium Cryoplant RFQ issued in Sept-15, due Dec-15 3

Schedule MR Plugs Cold Moderators Thermal Moderators Reflectors Handling System Structure & Shielding Liquid Hydrogen System Concept Phase Final DesignMake Phase PDRPDR PDRPDR PDRPDR PDRPDR 2019 Q1 Q Q1 Q2 Q3 Q Q1 Q2 Q3 Q Q1 Q2 Q3 Q Q1 Q2 Q3 Q4 PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR SAT PDRPDR PDRPDR Cryogenic Cooling System He Cryoplant PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR PDRPDR DeliveryCDR PDRPDR PDRPDR PDR PDRPDR PDRPDR PDRPDR PDRPDR Site Inst. & Testing Site Work 2014 Q3 Q4

TAC 11 Recommendations Twister Bearings 5 Recommendation: A simple version of the Twister concept is a reasonable approach. Failure-mode studies for the bearings should be continued (beam losses at the proton beam feed-through need to be carefully studied) Response: Failure mode analysis has been initiated and will be completed in the next few months. Several design improvements have been made to reduce the risk and consequence for a rotation problem. An analysis comparing the force needed to break a cold-welded roller bearing versus a cold-welded sliding bearing has been uploaded to the TAC-12 Indico site. Further studies needed that will be part of detail design: Complete analysis of all identified failure modes, some should be done in cooperation with remote handling group. For example: -Rotation tool failures -Issues lifting the target wheel -Issues lifting the plugs -Issues due to failures of surrounding shielding blocks Collecting further information and experience to make judgment of material combinations and designs that could reduce the risk and effect of the issue.

TAC 11 Recommendations Twister Bearings Number of bearings reduced (4- >2)(due to reduced number of shafts) Increased distance from bearings to hot spot and proton beam aperture Split plug as redundancy (top/bottom) remains so far Bearings of coated metal or ceramic hybrid with respect to radiation, cold welding, no lubricant and static load Calculation of forces to break a stuck roller bearing 6 Bearing 1 Bearing 2 Hot Spot TAC11 TAC12

TAC11 Recommendations Cryogenic System Recommendation: The TAC would like to see a presentation on the design of the cryogenic system at the next meeting. Response: Information on the design of the liquid hydrogen and helium cryoplant systems will be provided in the TAC- 12 meeting as part of the Moderator and Reflector Systems presentation. 7