1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
1 Proposal for a Multi-Optical Transition Radiation System in ATF2 A. Faus-Golfe, D. McCormick IFIC – SLAC 11 June th TB/SGC Meeting.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Design and Fabrication of a Q-BPM Calibration Tone Generator for the ATF2 Ian Bullock August 14, 2008.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF2 Mover Software 19 June 2008 Janice Nelson, Doug McCormick (SLAC) Glen White (LAL/SLAC) Justin May (no longer at SLAC)
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
1 Multi-Optical Transition Radiation System for ATF2 A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White,
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
Status of the ATF Damping Ring BPM Upgrade Project Manfred Wendt for the ATF DR BPM collaboration.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Prototype Sensor Status and Measurements u Sensor Response Measurements u Mechanical Response u Noise Expectations u DAQ Status.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Fan Assembly Driven by Magnetic Fields
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
ATF/ATF2 Control System
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
The ELENA BPM System. Status and Plans.
ATF2 Mover Software 15 December 2008
WP02 PRR: Master Oscillator and RF Reference Distribution
March Trip Plan Mikey Davis 01 March /7.
LLRF and Beam-based Longitudinal Feedback Readiness
ERL BPM System Mike Billing, Mark Palmer
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
LO BOX and LO/CLK DISTRIBUTION Arash Kaftoosian ESS Bilbao, May 2018.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Undulator Cavity BPM System Status
SuperB Linac VME Beam Position Monitor
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
Beam Position & Charge Monitors LCLS Lehman Review July 11, 2007
Presentation transcript:

1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1

29 October Projects Overview ATF DR BPM ATF2 Magnet Movers and BPMs OTR IP Wire Scanner 2

29 October Proposed BPM installation Calibration tones produced locally from LO tone, one tone per button, coupled into BPM from Downmix electronics module. BPM Buttons Analog Downmix Electronics VME Echotek Module VME Crate Controller (IOC) Control System Database via EPICS TBT data available via EPICS/MATLAB SLAC FNAL ATF Calibration /con trol module DAQ mode control moved to ATF control system Add diagnostic displays

29 October Current installation Ten BPMs in each arc One per FOBO cell, typically final prototype test (12/07) on BPM BPMs available for beam studies this December

29 October Spring ‘08: 63 BPMs (10 BPMs) (15 BPMs) One BPM per FOBO cell -choose closest to sextupoles every BPM in straight sections Full 96 BPM installation would provide a second monitor per FOBO cell

29 October BPMs: the Installation (10 BPMs) (15 BPMs) VME crates LO distributed from each crate DC fused distribution from each hut

29 October Installation Four VME crates, one in each RF hut – 1 IOC, 1 timing module, 8 Echoteks in each 12 Echoteks each for full 96 BPMs ADC, DIO, serial communication in one crate LO and DC distribution –each VME crate (4) to provide an LO source high-power amplifier in each RF hut, split in tunnel between two 8-way splitters (straight and arc) DC source with fused distribution panel in each RF hut, individual supply to each BPM New electronics housings –calibration/control module isolated from analog receiver –smaller boards, smaller enclosure (for downmix) –two 2-channel boards (one BPM) per box adequate isolation has been demonstrated with boards back-to-back high power LO amps are of the same model which currently supplies the whole 20-BPM installation throughout the whole ring. Should provide adequate overhead for the additional 3dBm needed for the cal system.

29 October Analog electronics Analog downmix electronics have been upgraded with additions: –digital step attenuator (0-28 dB, 4 dB steps) at input –on-board temperature sensor, current and voltage monitor –on-board directional coupler for calibration tone –improved match into LO power meter and subtractions: –manual switch for RF amplifier gain setting (remote only) –on-board Cal amplifier (not used, cross-talk too great) and changes: –smaller board –several components upgraded to newer models –additional filtering on analog diagnostic read backs 8 DSA added to address saturation issues, already on the edge at one bunch 1e10. Additional attenuation added to help alleviate ringing between button and filter (mismatch- based)

29 October Analog Downmix + Cal/Control module Text added a pad (10dB) between cal coupler and filter, on input. LO split between Front End and Cal boards happens before input. LO power meter -20dB taken before split tot he two channels. added a pad (10dB) between cal coupler and filter, on input. LO split between Front End and Cal boards happens before input. LO power meter -20dB taken before split tot he two channels. SLAC FNAL

29 October In Progress Prototype PCB layout and manufacture complete. Assembly in progress –Five boards due back from loaders 10/30 –Some hand-finishing in house, eleventh hour components Bench tests at SLAC –characterize RF performance, digital response –tune analog signal ranges Bench tests at FNAL –Deliver two boards Nov –Interface SLAC electronics with FNAL cal/control module –Leave boards with FNAL team for further testing & development 10

29 October The Plan: December ‘07 FNAL team to bring complete prototype set to ATF late Nov ‘07 for commissioning and testing -Complete setup: two 2-channel boards in new enclosure with 4 (2x2) calibration tones and control interface -Successful tests are the final step before upgrading 63 BPMs. 19 original ET BPMs available for beam studies -Several new participants from FNAL and SLAC eager to make use of TBT and high resolution capabilities. Test septum area BPM with SLAC downconverter + Echotek (proposed) Study septum aperture vs. EXT emittance

29 October Bigger Plan –Produce enough downmix boards for 63 ATF BPMs -(plus spares!) have begun ordering parts for those elements of design and installation which are unlikely to change –Install and test system in late Spring -Beam physics studies as soon as system is available: BBA, ORM 12

29 October ATF2 Magnet Mover

29 October ATF2 Magnet Movers Initial software developed for testing and commissioning runs outside of EPICS/VSystem Ongoing work to fix minor issues and develop an EPICS version –Mover calibration algorithms require more testing December ’07 –Test new version of libraries (written for both EPICS and the standalone system) –Provide interim GUI interface to CAMAC/Mover for ATF personnel –If available, test EPICS mover system Plan to have full system ready for test in Spring ‘08 14

29 October ATF2 QBPMs Purchasing on-going to load out remaining boards Purchasing cables for LO, CAL, and DC distribution Single pulse calibration –Still waiting on alignment measurement of BPM to verify sign of single pulse calibration scheme –Amplitude calibration good to ~100 µm December ’07 –Re-check phasing of LO cables –Repeat sign (phase) calibration tests 15

29 October Late Spring ‘08 –Test BPM and Mover interface and operation –Develop EPICS/VSystem single pulse calibration interface Fall ’08 –Commission –system with –beam ATF2 QBPM Plans 16

29 October Wire scanner Combine two FFTB scanners into single IP carbon wire scanner for ATF2 Fabrication and re-work on-going Should ship in Spring ’08 –Work required to interface SLAC scanner with ATF software 17

29 October IP Wire Scanners Install two wire scanners in a very small space to allow measurement of both large and small beam sizes. Required parts are in hand except for new vac chamber. Construction to be finished by Feb ‘08 For installation in ATF2 in June ‘08

29 October OTR Purpose: –Examine beam spot after Septum to look for emittance blow-up (DR to EXT) Work needed: –Change camera optics to fit in required space Parts ordered –December ’07 Retrofit optics at ATF with possible installation 19

29 October Proposed OTR Modifications Due to space limitations, a small modification to the existing OTR monitor will allow it to be used right after the extraction septum.

29 October Summary DR BPMs –Test redesigned analog downmix electronics, calibration, and system control interface in Dec ‘07 –Plans for 63 instrumented BPMs in Spring ‘08 ATF2 –Magnet mover control tests ongoing, with plans for testing Dec ‘07, completed system by Spring ‘08 –QBPM tests in Dec ‘07, installation complete by Summer ‘08 for beam operation Fall ‘08 IP Wire Scanner –Modifications ongoing, ship to ATF in Spring ‘08 OTR –Purchasing and re-work for installation in Dec ‘07 21