UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
S A Griffiths CM42 June 2015 Electrical & Control.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
MICE CM31 Schedule summary
Spectrometer Solenoid Fabrication Status and Schedule
Presentation transcript:

UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014

Progress and Work Magnetic Mitigation –West mezzanine installation will be in 2 weeks time and should be completed before the end February –Rack room 2 power will be installed 30 th January –PRY design a little behind Base for the North side South side delivery in May North side delivery July –Opus are looking into the changes for the south side mezzanine –Discussions of construction method for trench room to be carried out –Drawings are with Andy and they will be reviewed – PRR process being handled by Andy –Drawing pack has been sent out to vendors for quotations, feeding into the PRR. Focus Coil –FC 2 Has been shipped back to Tesla The bore tube weld and flange weld will be worked on Wednesday Initial investigation and Focus coil team will have a meeting with Tesla Leak from Helium volume to vacuum Sensor on the bore had some issues during cooling Thermal efficiency not good – something touching warm bore –FC 1 back into position Insulation around coolers inserted Straps tensioned Cold by the end February Testing

Progress and Work RF –Maximum of 500kW Maximum that the absorbers can handle –TIARA project deliverable complete – report being constructed –Some further tests to be carried out – Current measurements in the triodes –Once complete the power supply will be shipped back to DL –Single cavity test in the hall at RAL? Liquid Hydrogen System –Many of the changes that were through to be need will now not be needed due to the installation of the PRY –Another Hazop needs to be carried out before Step IV operation –Fit check of the absorber will be carried out on FC1 while it is being cooled. Tracker –Full installation projected to be completed early April Date includes slack Interaction with the FC team to stop installation during testing periods –Hall probes are available for installation Unknown how many Placement needs to be confirmed –Bore is 1 – 2 mm out from required according to the survey data taken Need to understand the implications A model of the data taken is being constructed to visualise

Progress and Work Vacuum –Manifold system will be installed. –Full automatic control. –Systems shipped for the solenoids will be used along with new items purchased. –Envelope has been integrated into the integration model. Electrical –Decay Solenoid power supply installation schedule for end February After the DS fix has been competed Test of the DS with the old power supply has been completed –All 7 racks are now nearing completion Some instrumentation still required – Lakeshores, AMI –Vacuum / Compressor rack under construction –Quench detection systems for the CC and SS What is required for the UK SG and PH will be meeting to discuss

Progress and Work Spectrometer Solenoids –2 weeks of pumping has been started –Cooldown will commence after that taking around 5 days –Powering tests will start after stable thermally and all checks o the system have been completed Coupling Coil Magnet –After the new ribs have been installed and wrapped with the new blankets there should be just a 3W load to the cold mass –The process of rib installation is 90% completed –Myer tool will attend Fermi Lab to assist in the installation of the first blankets to the cold mass –Installation starting early next week and will take around 1 week –Cooldown Mid February –Powering test Late February –Some high pot problems with a screw puncturing the Kapton layer – this has been addressed and is no longer an issue Coupling Coil Cryostate –The final stages of the build are not possible at LBNL, finish weld and tight tolerance bore machining –An external vendor has been found that will be able to complete –The welding and machining will be finished in 2-3 weeks –Once signed off after acceptance checks the cryostate will be shipped to Fermi Lab

Progress and Work RF Cavities –Single cavity test stand construction is nearing completion –Waiting for the final work on the couplers –All 6 tuners are on the cavity –All actuators are installed With the current state of the construction project the projected completion date for STEP IV installation is late January Meetings of the UK Package Managers and US MAP package managers have started –Schedule information from each meeting will feed into the larger schedule –Dashboard updates will be made shortly after the meetings

Progress and Work