CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.

Slides:



Advertisements
Similar presentations
Die folgenden slides werden zur Zeit noch überarbeitet 1 slide pro aktivität Wichtig ist die Information: 1. Motivation: worum geht es? Was sind die Ziele?
Advertisements

– Calice Collaboration Meeting
Introduction This project used cosmic rays to test a prototype Minimum Bias Trigger Scintillator (MBTS) that will be used in the ATLAS experiment at CERN.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Fiberless Coupled Tiles for a High Granularity Scintillator-SiPM Calorimeter Rick Salcido Northern Illinois University November 14, 2009 Prairie Section.
1 Overview of DAQ system DAQ PC LDA ODR Detector Unit DIF CCC Detector Unit DIF Detector Unit DIF Detector Unit DIF Storage Control PC (DOOCS) DAQ PC ODR.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
Status of CCC CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
CALICE: status of a data acquisition system for the ILC calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
AHCAL optimisation challenges towards a TDR Felix Sefkow ILD workshop Cracow, September 2013.
Status report on MURAY telescope R&D
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
1 On- and near-detector DAQ work for the EUDET calorimeters Valeria Bartsch, on behalf of CALICE-UK Collaboration.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
AHCAL LDA CALICE electronics and DAQ Meeting DESY Hamburg, Dec. 10, 2012 André Welker Bruno Bauss, Volker Büscher, Reinhold Degele, Sascha Krause, Yong.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Progress of Megatile Studies
Megatile Studies Yong Liu Johannes Gutenberg Universität Mainz
AHCAL Beam Interface (BIF)
CALICE meeting 2007 – Prague
HCAL task status report
Testbeam Timing Issues.
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Vishnu V. Zutshi For the NICADD team.
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
The CMS Tracking Readout and Front End Driver Testing
Scintillator HCal Prototype
Readout electronics system for Laser TPC prototype
Presentation transcript:

CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB sandwich P. Chau Data aggregator and timing unit for CALICE / AHCAL A. Welker, R. Spreckels, J. Caudron Optimization of scintillator tile geometries for surface mount (digital) SiPMs Y. Liu Generic Silicon PM R&D S. Krause Technical Support : B. Bauss, R. Degele, K.-H. Geib Supervision: V. Büscher, L. Masetti, U. Schäfer, S. Tapprogge, R. Wanke 1

Mass Assembly of AHCAL Motivation: About tile scintillators have to be placed on boards  Automatic assembly is needed Status: Procedure for fast mass assembly has been defined  Mass assembly requires numerous design modifications Tests of modified tile design (optical properties) are running with cosmic rays  First results: Better/similar properties than with current design Camera tests (for tile detection) are successful HBU board design changes for automatic soldering process are defined Outlook: Temperature tests, optimization of modified tile design Functionality tests for assembled boards Trigger scintillator Amplifier Tile Tile glued on reflector foil Amplifier SiPM

3 Study of scintillator tiles geometry using Surface Mounted SiPM Motivation: Surface mounted SiPM are easier to solder on HBU board automatically SiPM can be placed at the centre of the tile  Better uniformity Status: Exploration of a large quantity of scenarios: Geometry, optical surface, reflectivity of the wrapping, … Based on simulation (Geant4) with consistent modelling (PDE, Scintillator Emission Spectra, …) Computing power required Comparison with Data recorded in Aug 2013 by MPI Physik, Munich Outlook: Few scenarios have been ruled out Some parameters seem promising Comparison with Data on-going Development of more realistic modelling >>

AHCAL wing LDA and CCC Development of a data aggregator for the “Analogue” HCAL of CALICE Consolidation of data received from the HBU active detector units (~ millions of channels) FPGA and Xilinx Zynq based Data transmission into DAQ via Ethernet PCB geometries adapted to final detector geometry  1.1m long structure consisting of central body and two wings Status Initial prototype successfully built Firmware work, software integration and tests on-going Development of a timing unit for CALICE Distribution of central clock Synchronous commands to all sub-detectors Busy handling, asynchronous trigger (for beam tests) Status Successful operation in ECAL beam tests Initial version made available to AHCAL collaboration + Development of various test and support modules (FPGA/Zynq based) >>> ongoing development throughout 2013/14 <<< 4

Characterisation of SiPMs Explore properties of analogue SiPMs Signal shapes After pulses Cross talk Dark rates Absolute gain calibration Uniformity in sensitivity, gain and cross talk Thermal properties Require Readout chain for charge measurement Pre-Amp (provided by KPH) Pulse shape determination with FADC Pulsed laser diodes Optical table, positioning stage / stepper control Absolute charge measurements via pico-amp current readout (Xe-Lamp / monochromator, calibrated reference diode) Status First simple readout chain working Simulating signal response Working on fast calibration pulser design Components procurement on-going >> 5