Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Does the short pulse mode need energy recovery? Rep. rateBeam 5GeV 100MHz 500MWAbsolutely 10MHz 50MW Maybe 1MHz 5MW 100kHz.
1 9 mA study at FLASH on Sep., 2012 Shin MICHIZONO (KEK) LCWS12(Sep.24) Shin MICHIZONO Outline I.Achievement before Sep.2012 II.Study items for ILC III.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Low Emittance RF Gun Developments for PAL-XFEL
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
Ned Arnold 13 July, 2009 Convenience Tools … July 13, 2009.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
K.Honkavaara, LCLS ICW06 LCLS Injector Commissioning Workshop, SLAC, October 9-11, 2006 Linac Experience at FLASH Katja Honkavaara University of Hamburg.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
ART DOE/NSF Review April 2009: Beam Tests at FLASH (Carwardine) Americas Beam Tests at FLASH John Carwardine (Argonne) April 29, 2009 Slide 1.
John Carwardine 29 October, mA meeting 1. Agenda 9mA workshop Data analysis DAQ refresher / online database 2.
John Carwardine 13 th April, 2011 Report on the 9mA program.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
John Carwardine (Argonne) First Baseline Allocation Workshop at KEK September 2010 Experience from FLASH ‘9mA’ experiments Gradient and RF Power Overhead.
LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
John Carwardine January 16, 2009 Some results and data from January studies.
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
HINS Linac Simulations : Benchmarking, Jitter and Stripping. Jean-Paul Carneiro FNAL Accelerator Physics Center Accelerator Physics and Technology Workshop.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
N.Solyak (on behalf of PrX team) Fermilab Project X Collaboration Meeting, FNAL, Oct.25-27, 2011 N.Solyak, Pulsed Linac1 PrX Collab. Meeting, FNAL, Oct.25-27,
ALBA RF Systems Francis Perez.
RF control and beam acceleration under XFEL conditions Studies of XFEL-type Beam Acceleration at FLASH Julien Branlard, Valeri Ayvazyan, Wojciech Cichalewski,
John Carwardine TDR Writing: FLASH 9mA Experiment.
1 NGLS Outline and Needs in Superconducting RF Materials Development John Corlett SRFMW, July 16, 2012 Office of Science.
ILC Power and Cooling VM Workshop
TTF/FLASH 9mA Experiment Recent Machine Studies Overview
E-XFEL Status and First Beam Results
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
WG3 Summary High current and CW accelerators
LLRF systems status update
Status of the CLIC main beam injectors
Planning the Experiment
Joint Accelerator Research JGU & HZB
BriXS – MariX WG 8,9 LASA December 13, 2017.
Notkestrasse 85, Hamburg, Germany
Measurements, ideas, curiosities
Accelerator Layout and Parameters
XFEL Project (accelerator) Overview and recent developments
TTF/FLASH 9mA Experiment Recent Machine Studies and Results
LCLS Commissioning Parameters
“Workshop on Linac Operation with Long Bunch Trains” Summary
CW Energy Recovery Linac for Next Generation of XFELs
LCLS Commissioning Parameters
Barry Barish Paris ICHEP 24-July-10
LCLS Commissioning Parameters
ERL Director’s Review Main Linac
CEPC SRF Parameters (100 km Main Ring)
Parameters Changed in New MEIC Design
Used PEP-II 476 MHz Cavities for MEIC Collider Rings
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment

Long-pulse high beam-loading (9mA) demonstration –800  s pulse with 2400 bunches (3MHz) –3nC per bunch –Beam energy 700 MeV ≤ E beam ≤ 1 GeV Primary goals –Demonstration of beam energy stability Over extended period –Characterisation of energy stability limitations Operations close to gradient limits –Quantification of control overhead Minimum required klystron overhead for LLRF control –HOM absorber studies (cryo-load) –… Major operational challenge for FLASH ! –Pushes many current operational limits Primary objectives of 9mA program Primarily a LLRF experiment 2 Goals partially achieved in September 09 run

Achieving the goals… 3 Dealing with high beam-power not trivial (losses!) ‘New’ hardware and ‘shutdown recovery’ syndrome

N. Walker - Long Bunch Train Workshop Last week of studies (not quite how we’d planned!) Bunch charge was consistently between ~2.7nC and ~3nC Rapid progress increasing number of bunches during the last 3 days (but very unstable) 15hr run (800 bunches) Almost 2400 bunches Number of bunches Bunch charge

Energy deviation along bunch train (examples) 800us 80 bunches,100kHz, ~3nC/bunch (0.3mA) Along pulse: 0.035% p-p Along pulse: 0.5% p-p Pulse-pulse: 0.13% RMS 2100 bunches, 3MHz, ~2.5nC/bunch (7.5mA) 700us 30 MeV 1.8 MeV

FLASH Upgrade 2009/10

FLASH accelerator layout (then) John Carwardine Global Design Effort 7 Comparison of machine parameters ACC456 is main focus of 9mA RF studies XFELILCFLAS H design 9mA studies Bunch charge nC # bunches * 2400 Pulse length ss CurrentmAmA 5999

FLASH Gradient limits (Then)

Ecav / Emax (then) (All Qexts set equal, nominal power ratios) If cavities are filled to point where first cavity quenches, –Average gradient ACC4/5/6~24MV/m –Average gradient ACC6 C1-C4 ~30.8MV/m –Klystron power 6.4MW –ACC6 C2 forward power360kW Ecav / Emax (no beam) Cavity forward power Limit: 5-7MW Limit: 390kW

FLASH layout (now) K K K K

K K K K 20.9 MV/m23.7 MV/m24.8 MV/m27.5 MV/m 3.8 MW 5.1 MW Nominal foreseen for 1.3 GeV beam energy

FLASH layout (now) 23.0 MV/m26.1 MV/m 26.9 MV/m29.8 MV/m Max. operation

FLASH layout (now) 23.0 MV/m26.1 MV/m 26.9 MV/m29.8 MV/m Max. operation

Other considerations LLRF systems updated and standardised –All will use ‘standard’ Simcon-DSP system –Bunch patter feed-forward –Better exception handling (toroid based) –…. New 3.9 GHz system ‘unknown territory’ –Special considerations for 9mA operation General very new machine –Will take time to re-commission

Future for long-bunch train ops Commissioning now ~ 19 July 6 months of alternating –FEL studies –Photon user runs Next Accelerator Physics period early January –Expect to have dedicated 9mA experimental time Concept to use some of the FEL/user blocks to develop long bunch trains for SASE –Typically 1 mA 800 bunches –Many (LLRF) issues are identical –Stable systems available before dedicated 9mA experiments