Presentation is loading. Please wait.

Presentation is loading. Please wait.

CW Energy Recovery Linac for Next Generation of XFELs

Similar presentations


Presentation on theme: "CW Energy Recovery Linac for Next Generation of XFELs"— Presentation transcript:

1 CW Energy Recovery Linac for Next Generation of XFELs
General Thoughts based on TESLA XFEL-TDR TJNAF: A. Bogacz INFN: M. Ferrario, L. Serafini DESY: D. Proch, J. Sekutowicz, S. Simrock BNL: I. Ben-Zvi LANL: P. Colestock UCLA: J. B. Rosenzweig TESLA_TTF Meeting Frascati, May 26-28, 2003 TTF Meeting , May 26-28, 2003

2 Motivation XFEL pulsed linac, present layout: Emax = 20 GeV L = 1.4 km
78 Cryomodules each housing 12 sc cavities 936 cavities at Eacc = 23.5 MV/m Cryoplant kW at 2 K (safety margin ~50%) capital cost: 336 M€ includes m of active length ~ 0.34 M€/m TTF Meeting , May 26-28, 2003

3 What do we buy for this money ?
up to 1 nC bunches /s at 20 GeV up to 1 nC bunches /s at 10 GeV (add. costs) The questions are: can we buy much more in the future after pulsed XFEL ? and is there a major change in the technology needed ? TTF Meeting , May 26-28, 2003

4 An alternative possible future layout of the linac driving XFEL
Technical assumptions, towards cw operation : I cavities @ Qo ~ 2E10 @ Eacc  15 MV/m II. 46 2K cryoplant III. energy recovery Are these assumptions very challenging ? TTF Meeting , May 26-28, 2003

5 • cavities : • cryoplant = ~45÷55 M€ • energy recovery 95 %:
we have good chance after experiment at CEBAF : 1 GeV 20 MeV (98 %) with sc cavities TTF Meeting , May 26-28, 2003

6 Possible layout can be very similar to the present pulsed linac
1.8 km ~3 km Dump (0.5 MW) 3xSASE 2xUndulators RF-Gun ? BC I : 0.14 GeV BC II : 0.50 GeV En = 10÷20 GeV R~150 m BC III : 2.50 GeV TTF Meeting , May 26-28, 2003

7 A very preliminary and not optimized list of parameters
TTF Meeting , May 26-28, 2003

8 Example: 1 mA= 1 nC @ spacing 1 µs
Any combination of the bunch charge and the spacing of bunches giving nominal current is OK Example: mA= 1 nC @ spacing 1 µs TTF Meeting , May 26-28, 2003

9 Length of the pulse and power/FPC vs. En
bunches/s But this requires additional RF TTF Meeting , May 26-28, 2003

10 How much does the RF cost ?
We have here practically 2 solutions: Solid state amplifiers ~ 5 kW/FPC  6 M€ (Simrock) 16 kW klystrons (CEBAF 12 GeV upgrade)  16 M€ TTF Meeting , May 26-28, 2003

11 • suppression of microphonics
Conclusion Needed R&D : • cw RF gun • suppression of microphonics • more experience with the energy recovery Total cost without experiments should be < 400 M€ Total AC power for Cryoplant + RF < 10 MW But we will have : 6 x more bunches /s very flexible time structure of the beam. TTF Meeting , May 26-28, 2003


Download ppt "CW Energy Recovery Linac for Next Generation of XFELs"

Similar presentations


Ads by Google