IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Software Quality Assurance Plan
Presented by Heorot.net.  Understand the need for a PenTest Methodology  Identify the most-used methodologies  Understand Advantages and Limitations.
<<replace with Customer Logo>>
13 th Command & Control Research & Technology Symposium Bellevue WA June, 2008 Briefing Managing the Life Cycle of Net- Centric Architectures This document.
GAI Proprietary Information
Project Change Management
Knowledge, Skills, and Abilities Working Group Hua Min Jahangheer Shaik Natasha Sefcovic Kahn Aleksey.
TechMIS LLC Proprietary Tracking Requirements And Compliance Engineering (TRACE ) Steve Collier/B. Squires/TechMIS LLC An affordable and user friendly.
SE 555 Software Requirements & Specification Requirements Management.
CASE Tools CIS 376 Bruce R. Maxim UM-Dearborn. Prerequisites to Software Tool Use Collection of useful tools that help in every step of building a product.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
SwE 313 Introduction to Rational Unified Process (RUP)
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
IV&V Facility Model-based Design Verification IVV Annual Workshop September, 2009 Tom Hempler.
Change Request Management
© 2006, Cognizant Technology Solutions. All Rights Reserved. The information contained herein is subject to change without notice. Automation – How to.
Introductions Jim Enzinna, Chief, Licensing Division Mark DiNapoli, Assistant Chief, Licensing Division Tracie Coleman, Head, Information Section Vince.
Technical Integrity Assurance For Product Development W. Henson Graves Lockheed Martin Aeronautics Company Russ Campbell.
Release & Deployment ITIL Version 3
Effective Methods for Software and Systems Integration
Complete and Integrated Lifecycle Management. Challenges 1.
BRUE Behavioral Reverse Engineering in UML as Eclipse Plugin MSE Presentation 1 Sri Raguraman.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
SAS_08_AADL_Exec_Gluch MAC-T IVV Model-Based Software Assurance with the SAE Architecture Analysis & Design Language (AADL) California Institute.
RUP Fundamentals - Instructor Notes
Michael Dermody September 2010  Capability Maturity Model Integration ◦ Is a Trademark owned by the Software Engineering Institute (SEI) of Carnegie.
Software System Engineering: A tutorial
NIST Special Publication Revision 1
What is a life cycle model? Framework under which a software product is going to be developed. – Defines the phases that the product under development.
T. Dawson, TASC 9/11/13 Use of a Technical Reference in NASA IV&V.
Roles and Responsibilities
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
SacProNet An Overview of Project Management Techniques.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Software Product Line Material based on slides and chapter by Linda M. Northrop, SEI.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
IV&V Facility 26SEP071 Validation Workshop Dr. Butch Caffall Director, NASA IV&V Facility 26SEP07.
Reusing Modeling Elements in IV&V Thomas Otani Naval Postgraduate School 2009 NASA Independent Verification and Validation (IVV) Annual Workshop John Ryan.
Software Maintenance Speaker: Jerry Gao Ph.D. San Jose State University URL: Sept., 2001.
1 Technology Infusion of the Software Developer’s Assistant (SDA) into the MOD Software Development Process NASA/JSC/MOD/Brian O’Hagan 2008 Software Assurance.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Creating and Maintaining Coalitions and Partnerships Community Tool Box Curriculum Module 1 Part 1.
State of Georgia Release Management Training
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Ganga/Dirac Data Management meeting October 2003 Gennady Kuznetsov Production Manager Tools and Ganga (New Architecture)
Developing Action Plans Module 5 Level 2 Evaluating an Individual Identification and Recruitment Action Plan.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Identity & Access Management Services
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Software and Systems Integration
1.Introduction to Rational Unified Process (RUP)
Description of Revision
The Open Group Architecture Framework (TOGAF)
Matrix Template and Example
Tax Rate Redux Sue Anne Athens, CIO August 2016.
Matthew Christian Dave Maddox Tim Toennies
Outbrief MBSE Workshop Breakout Session 31 January 2011
New Mexico Environment Department The E-Enterprise Integrated Identity Solution Project– Closeout Presented to the NM DoIT Project Certification Committee.
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

IV&V Program Supporting Project Management with AMF Jeremy Fienhold Don Kranz

IV&V Program Introductions Don Kranz – Lead Architect for AMF & AWB Jeremy Fienhold – Lead Analyst on a project using AWB 2

IV&V Program Analysis & Management Framework Provides a high level assurance based ontology that allows information to be shared between IV&V tools. Too much decomposition reduces flexibility, modularity and portability of design. At the simplest level we deal with: – Projects – Participants 3 – Artifacts – Assessments – Actions

IV&V Program IVV 09-1 Manage Responsibilities “A continual review of the IV&V effort Revision of the IPEP as necessary based upon updated Mission Project schedules and development status Coordination of the IV&V results with the developer and other appropriate management groups Promotion of technical exchange between IV&V and the developer (to improve technical knowledge transfer and increase IV&V effectiveness) Identification of process improvement opportunities in the conduct of IV&V” 4

IV&V Program Project Organization 5

IV&V Program Superior Tracing Any ArtifactAny Action Any Assessment 6

IV&V Program Scoping 7 Behaviors Scoping Modules

IV&V Program Scoping 8

IV&V Program Coverage 9

IV&V Program Assessing Completion 10

IV&V Program Change Impact 11 Modified Artifact(s) Previous Assessment(s)

IV&V Program Tasking ground work 12

IV&V Program Future of Architecture 13

IV&V Program Future Functionality Improve ORBIT integration Add reporting capabilities Add Admin UI for project configuration Improve support of EBA & TR Integration with COMPASS 14

IV&V Program 15

IV&V Program References IVV 09-1 Version O: Independent Verification and Validation Technical Framework, June 06, 2012 IVV 09-4 Version AF: Project Management, May 2, 2013 T2103 Version D: Project Execution Plan (IPEP) Template, May 15, 2013 S3106 Version D: PBRA and RBA Process, October 4, 2012 AWB User’s Guide AMF Architecture & Design document 16