Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.

Slides:



Advertisements
Similar presentations
Electricity Merit Badge
Advertisements

HVAC Equipment Efficiency Overview Building Performance Matters.
Chapter 3. HVAC Delivery Systems
Inspected in port Shanghai from 26th to 28th Sept by NCL
B757 Review Questions.
Montgomery County Fire Rescue Medical Ambulance Bus 20 Patient Capacity.
Solar Controller (port berth cabinet) DC System Switch BS #9006 (sb aft bunk) Switch BS#9006 (sb aft bunk) Auto Charge Relay BS #7610 (sb aft bunk) Start.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Air Conditioning and Refrigeration Basics Don Gulliver February 9, 2013.
Lesson 38 Shipboard Power
HVAC Heating, Ventilation and Air Conditioning -something that you never think about until it doesn’t work properly.
Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
BSA Electricity Merit Badge Electricity Merit Badge AC Alternating Current.
1 October 21, 2014 The Safe Use of Taps. 2 October 21, 2014 What are RPTs?  A Re-locatable Power Tap (RTP) or power strip, is used to provide multiple.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Car Air condition cycle Presentation Car Air condition cycle Presentation Present to / Pro. Dr. Saad Abd El hamid.
HVACR116 – Trade Skills Mechanical Drawings.
PLATFORM UTILITIES PAB 2073 Reference: PCSB/PMO document.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Electrical Power J. Mitchell for AE-210. What Does Electrical Power Do? Provides Energy for Buildings Provides Energy for Buildings Usually all except.
EXAMPLE ELECTRICAL DESIGN OF A SMALL OFFICE
Air Handler Terminology
Organizing Wiring with Load Groups Load Groups may be needed for safety or functional reasons. The concept applies to both AC and DC systems. Load shedding.
exhaust regulator valve
Air Handler Terminology
N O R T H A M E R I C A C O M M E R C I A L TDP
Home Electrical Systems. Behavior Objectives  Define the basics of Electrical Systems  Explain the basic principles of Electricity.  Describe the different.
Keeps heat indoors in winter and outdoors in summer – means lower heating and cooling bills Rated by it’s R-value. The greater the R- value the better.
STBD. BOAT DECK MONITOR HEAVY CORROSION FOUND INSIDE ELECTRICAL MOTORS RENDERING THE MONITOR NON-OPERATIONAL.
Diesel Fuel - Fill Place all spill safety equipment where needed
Consumer’s Main Switchroom & Main L.V. Switchboard
NOVEC Fire Suppression System
D/C Power Systems General Locations. There are two types of D/C Power sources on the new fireboat: 24 Volt 12 Volt These are further subdivided into three.
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
Potable Water System General Locations and Operations.
BOAT Regulatory Gross Tonnage – 199 Registered Length – 96’7” Registered Breadth – 29’ Registered Depth - 13’3” Draft – 14’ 6” Air Draft – 46’
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord.
A/C Power Systems General Locations. This module will cover the General Locations of the A/C Power Systems through out the vessel. The A/C Power Systems.
Internal Communications Systems
Fire/General Service/Ballast Pumping Systems
Bilge Pumping Systems General Locations.
Machinery Cooling Water System Locations and Operations.
Forward & Aft Searchlight Operate Forward & Aft Searchlight.
the compact air control solution
Getting Underway – Engine room
Shore Power System General Location. Shore Power Power comes on to the vessel in the form of 480 Volt, Three Phase, 60 Hz Alternating Current (A/C) electricity.
Fire Detection System General Locations and Operation.
E4 HVACR Electrical Installation
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
Types of Fire Apparatus Equipped with a Fire Pump Sugar Land Fire Department Driver/Operator—Pumper Academy Spring 2003.
Air Line Pilots Association, International EMB 145 Oral Questions Overhead “A” Select “Slide Show” Use the space bar on your computer to advance the presentation.
Planning The Electrical System  Safe means for the entrance of electrical supply into a building  Means of disconnecting all electrical power in a building.
UH-60 IPC/MOI CW2 JAMES THOMAS.
6/13/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts.
 Is the room or platform from which the ship can be commanded. When a ship is underway the bridge is manned by an OWO (officer of the watch) aided usually.
T-6B Electrical System Created:24 Aug 2015 Updated:30 Aug 2015 T6BDriver.com.
Machinery Auxiliary Systems
Air Distribution Control
Lighting Branch Circuit and Small-Appliance Circuits for Kitchen
Air Distribution Control
Electrical Gas Plumbing Heating & Cooling
Booster Hose Reel Location/Operations.
Firefighting equipment
Objectives Finish with Practice circuits problems for
(or external generator)
Presentation transcript:

Power Distribution System General Location

Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties into the 480 Volt Bus in the Main Switchboard. Some devices and sub-panels are directly connected to the bus through breakers. Other sub-panels are connected to the main bus through step-down transformers that divide the power to 220 volt systems or 120 volt systems. Keep in mind, the main bus is divided into a port and starboard side; linked by the bus tie breaker (normally closed). Shore power and the Port Generator feed the starboard side of the bus, and the Starboard Generator feeds the port side of the bus. Also, off-ship power comes of the port side of the bus. Yeah, it’s a little backwards, but that’s what we got. Take a look at the next slide for clarification… Main Switchboard

Power Distribution Starboard Genset (#2) Port Genset (#1) Off-Ship Power 50 amp breaker Shore Power In 100 amp breaker Buss Tie Breaker Normally Closed

Power Distribution Breakers off the Main Bus (Starboard side of bus) Deck Crane HPU 120 Volt Transformer T Volt Transformer T Volt FiFi Panel #1 Spares Port Motor Controller (MCC) Breaker (Connects Port Motor control panel to port side of 480 volt bus.)

Power Distribution Breakers off the Main Bus (Port side of bus) Spare Fwd Capstan HPU Aft Capstan HPU Spare Off Ship Power (Export) 460 Volt FiFi Panel #2 120 Volt Transformer T Volt Transformer T-2 Starboard Motor Controller (MCC) Breaker (Connects Starboard Motor control panel to starboard side of 460 volt bus.)

Power Distribution E/R 480 Volt Panels #1 and #2 MCC P401P and P403S Items controlled from these panels: Fire/GS/Ballast pump Auxiliary Sea Water Cooling pumps (VSP and gearbox cooling) Tempered Water Cooling pumps (for A/C system) F.O. Transfer Pumps Black Water Transfer Pumps Grey Water Transfer Pumps Bilge Pump Rescue Platform HPU

Power Distribution E/R 480 Volt Panels #1 and #2 MCC P401P and P403S Open this panel up, and you will find the breakers for: Breathing Air Compressor Service Air Compressor #1 E/R Supply Fan #1 E/R Supply Fan #2 Service Air Compressor #2 HVAC/CBRN Electric Duct Pre-Heater VSP # 1 Main Control Power VSP #2 Main Control Power HVAC/CBRN Supply Fan #1 HVAC/CBRN Supply Fan #2

Power Distribution FiFi Panel #1 P402P 460 Volt Centerline of Aft Hold Breakers for: Foam Pumps 1 and 2 FiFi System Cabinet B FiFi System Cabinet H Port Main Engine Jacket Water Heater FiFi System Cabinet D FiFi System Cabinet I Stbd Main Engine Jacket Water Heater VSP Room Fan Aft Hold Fan

Power Distribution FiFi Panel #2 P404S 460 Volt In front of you as you enter Aft Hold Breakers for: Foam Pumps 3 and 4 FiFi System Cabint G Pump Engine #1 Jacket Water Heater Reverse Cycle Heat Pump Unit #2 Pump Engine #2 Jacket Water Heater Reverse Cycle Heat Pump Unit #1 Electric Duct Heater (Make up air handler)

Power Distribution Step Down Transformers Power is stepped down form 480 Volt A/C from the main bus to 220 and 120 Volt A/C via transformers. There are two (2) transformers for the 220 Volt A/C system and two for the 120 Volt A/C system. The system is configured this way for redundancy. Should the primary transformer for either system fail, the transformer may be switched to the secondary at the incoming breaker boxes seen here. 120 Volt transformer switching on the top. 220 Volt transformer switching on the bottom.

Step Down Transformers Power Distribution Close-up of 220 Volt Transformer Incoming Breaker Box. Ground Fault Detection Mechanical Switch Plate

Power Distribution Step Down Transformers 120 Volt Transformers #4 #3 220 Volt Transformers #2 #1

Power Distribution 220 Volt Panels P200S and P200P Aft Hold, Fwd Bulkhead, near Centerline P200P P200S

Power Distribution 220 Volt Panels P200S and P200P Aft Hold, Fwd Bulkhead, near Centerline P200S Contains Breakers for: Wheelhouse Fan Coil Unit #2 Cook Top (Galley) Sea Chest Impressed Current System Potable Water Pump #2 Water Heater 55 Amp Machinery Room Welder Receptacle #1 55 Amp Machinery Room Welder Receptacle #2 Deck Light Circuit #2 Wheelhouse Split System FCU #2

Power Distribution 220 Volt Panels P200S and P200P Aft Hold, Fwd Bulkhead, near Centerline P200P Contains Breakers For: Wheelhouse Split System FCU#1 Potable Water Pump #1 Wheelhouse Fan Coil Unit #1 Pump #3/Engine #7 Jacket Water Heater (C-12) 55 Amp Equipment Room Welder Receptacle Deck Light Circuit #1 Wheelhouse Split System Condensing Unit #2 Wheelhouse Demisting Fans Intercom/P.A. System

Power Distribution 110 Volt Panels P100 Aft E/R, Starboard Side P100 Contains Breakers for: 120 Volt Boat Deck Panel P101 and Whistle 120 Volt Hold Deck Panel P Volt Emergency Batt. Charger#1 120 Volt Main Deck Panel P Volt Main Deck Panel P104 Navigation Lighting Main Supply Central Machinery Alarm & Monitoring Main Supply CCTV System General Alarm System Main Supply Fire Alarm and Detection Main Supply 12 Volt Emergency Services Batt. Charger #1

Power Distribution 110 Volt Panels P103 (Sub-Panel) Aft E/R, Port Side By Main Switch Board P103 Contains Breakers For: Main Deck Lighting Circuit #2 24 Volt E/R Service Battery Charger #1 24 Volt E/R Service Battery Charger #2 Hold Accommodation Lighting Circuit #2 Hold Accommodation Lighting Circuit #1 Machinery Space Receptacles Circuit #1 VSP #1 Auxiliary Power VSP #2 Auxiliary Power Machinery Space Lighting Circuit #1 FiFi System Cabinet C 110 VAC 32A for remote valves FiFi System Cabinet E 110 VAC 10A for remote valves FiFi System Cabinet F 110 VAC 32 A for remote valves Machinery Receptacles Circuit #2 Machinery Receptacles Circuit #3 24V Fire Monitor Battery Charger #2 Generator #2 Anti-Condensation Heater Generator #2 Jacket Water Heater U.V. Sterilizer 24V Fire Monitor Battery Charger #1 Generator #1 Anti-Condensation Heater Generator #1 Jacket Water Heater Equipment Room Cord Reel (30A)

Power Distribution 110 Volt Panels P102 (Sub-Panel) Main Deck, Multipurpose Room Starboard Side Aft P102 Contains Breakers for: Equipment Room Door Boat Deck and Wheelhouse lighting Circuit #2 Refrigerator Microwave Coffee Maker Hold Accommodation Lighting Circuit #1 Boat Deck and Main Deck Receptacle Circuit #1 Machinery Space Lighting Circuit #2 Boat Deck and Main Deck Receptacle Circuit #2 Pantry Receptacles Circuit Main Deck Receptacles Circuit #1 Main Deck Receptacles Circuit #2 CIC Receptacles Circuit Hold Accommodation Receptacles Circuit #2 Boat Deck WC Fan and Damper CBRN Fan #2 Damper Main Deck Lighting Circuit #1 ROV Outlet on Workbench (38 Amp) CBRN Detection Fan Main Deck Shower and WC Fan & Damper

Power Distribution 110 Volt Panels P104 (Sub-Panel) Boatdeck, HVAC Space Behind CIC Starboard Side Aft P104 Contains Breakers for: Equipment Room Fan CIC Fan Coil Unit #2 Multi-Purpose Room Fan Coil Unit #2 Recovery Area Fan Coil Unit Galley Range Hood Damper System (Via Alarm System CIC Fan Coil Unit #1 Multi-Purpose Room Fan Coil Unit #1 General Stores Fan Coil Unit EMS Area Fan Coil Unit Interior Fire Dampers

Power Distribution 110 Volt Panels P101 (Sub-Panel) Wheelhouse – Port Stack Bulkhead P101 Contains Breakers for: 24V Emergency Battery Charger #2 12V Wheelhouse Service Battery Charger #1 12V Wheelhouse Service Battery Charger #2 12V Emergency Service Battery Charger #2 Window Wipers Mast Floodlight Law Enforcement Light #1 Law Enforcement Light #2 Boat Deck and Wheelhouse Lighting Circuit #1 Boat Deck and Wheelhouse Receptacles Circuit #1 Boat Deck and Wheelhouse Receptacles Circuit #2 Wheelhouse Top Receptacle Wheelhouse Top Rail FWD & STBD Floodlights Crane Basket Floodlights Circuit Search Light #1 Searchlight #2 Ice Maker (Galley) Portable Radio Chargers (Wheelhouse, CIC, Multipurpose Room) Wheelhouse Top Rail AFT & Port Floodlights CIC Communications Computer Boat Deck Floodlights Circuit Crane Basket Receptacles Satellite Telephone/Internet CBRN Fan #1 Damper