Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.

Slides:



Advertisements
Similar presentations
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC 18 & 19 April 2015 At 450 GeV with bumps, no increased MUFO activity. Beam screen 15R8 warming up to 80 K, ongoing for the day 09:00: Orbit studies.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
SECTOR TEST PREPARATION W. Bartmann, C. Bracco, J. Uythoven LIBD Meeting, 10-Feb-2015.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Injection test? Mike Lamont For initial discussion.
Failure mode impact studies and LV system commissioning tests
Injection systems W. Bartmann, M. J.Barnes, C. Bracco, E. Carlier, B. Dehning, L. Drosdal, R. Folch, B. Goddard, V. Kain, A. Lechner, F. Loprete, R. Losito,
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Evian LHC BC workshop January LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all.
Daniela Macina (CERN) Workshop on Experimental Conditions and Beam Induced Detector Backgrounds, CERN 3-4 April 2008 Experiments protection from beam failures.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
R.Giachino / M.Albert Be/op 12 th March 2012 LHC Machine check out 1v1.
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
LHC Beam Operation Comitte24. April INJECTION AND TRANSFER LINE STABILITY L.Drøsdal For the injection team.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
3 rd March Extended LTC Injection and Beam Dump Brief overview of system components and dependencies Breakdown of tests foreseen in preparation.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
Schedule IT General Schedule 9 th, September 09 Today.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
18 July Reminder Dilution kicker system MKB is staged (2H, 2V) –Limits extracted intensity at 7 TeV to 50% of nominal –For 25ns spacing, this is.
LHC OP Tools - Applications (1) o2 new timing users, new dynamic destination oPower converters – settings (for base optics):  Parameters, optics, beam.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
LHC Commissioning Phases Phase A GeV, Increasing the Beam Intensity presented by Jan Uythoven on behalf of the LHCCWG Particular thanks to Laurette.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
LBOCM. ZerlauthMarch 06 th 2012 Acknowledgements : B.Todd, C.Martin, I.Romera, E.Carlier, J.Wenninger, C.Zamantzas, S.Redaelli et al. 1v0 MPS Commissioning.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
R. Alemany & V. Kain, 21 st of April ‘09 LHC Dry Run- Week 14 oGoal: run injection and TL BI (fixed displays, logging, applications) plus injection BI,
Aperture measurements during LHC commissioning 2017
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
SPS extraction, transfer lines, injection
Chamonix 2009 – LHC Performance Workshop
Jan Uythoven For discussion
LHC Risk Review: Kicker Magnet Reliability
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Safe Injection into the LHC V.Kain AB/CO
Safe Injection into the LHC V.Kain AB/CO
Thursday morning – optics correction
LHC Injection and Dump Protection
Beam Dumping System and Abort Gap
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Week 35 – Technical Stop and Restart
Chamonix 2006 – LHC Project Workshop
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
New page for summary of test status
Presentation transcript:

Status of ABT beam tests preparation 9-Oct-14

Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check BETSsim input, SMP energy transmitted – Check MKI waveform logging in OASIS, IQC Magnet systems: – Heat run – Pulsing full line – Switch powering BI systems: – Movements, acquisition, logging, fixed displays – Screens, BPM, BCT, BLM – SPS extraction region, TL and LHC injection (Francesco, Jose) – LHC extraction region (Matthew, Jose) Needed for TL test, 22-Nov Might have issue with TI 8 BLMs for TL test

Preparation of sector test without beam II Optics – Prepare list of settings for SPS extraction: Kicker nom/max voltage, Septum current/girder pos, bumper currents (Francesco, Jose) TL and LHC injection: MKI nom/max voltage, MSI current (Matthew, Jose) LHC extraction: MKD max/nom (6.5 TeV), MSE current (Matthew, Jose) – Beam position on injection/dump region screens SPS extraction and TL screens (Francesco) Injection screens (Jose) Extraction screens (Matthew) – TCDI and MKI validation knobs, 14/15 MKD extraction knob Prepare TL phase oscillation knobs every 30 deg (Francesco) MKI knob (Francesco, Jose) MKD knob (Matthew) – Aperture bumps at MSI, TCDIM, MKI, Q5, D2, TCDQ Prepare screenshots of aperture bumps in YASP – Screens matching application

Protection devices TCDI, TDI, TCLI, TCDQ, TCS – Movement, function/range – Prepare list of gap opening in sigma, beam size at each collimator (different energies at TCDQ/TCS) – TCDI (Francesco) – TDI, TCLI (Jose) – TCDQ, TCDS (Matthew) Interlocking – Downstream TED master BIC, injection permit TT40 – Inhibit of MKE in case of MKI erratics Need ‘dummy’ TCDI settings for automatic setup check at TL test

Preparation of sector test without beam III Radiation monitoring – Radmons, Ramses in injection/extraction region – Check variable in the logging Quality checks: IQC, IPOC – Data reception and logging – Element strengths and limits (thresholds to be updated later) Discuss limits with Verena and Lene – Element updates, new BLMs in injection regions Get updated drawings from BLM team – New BETS interlock on MSI, TDI To be discussed in detail Maskable BIS input Access to UA while MSI powered to check HW limits?

Preparation of sector test without beam IV Beam dump – Arming sequence with global BIS – LBDS settings and MCS (changes of generators) – BETSsim (Q4, MSD input) – XPOC Waveforms, VAC, BTVDD, BPMD  need beam dumped event BLMs – new BLMs and filters BETS interlock TCDQ

Preparation of sector test with BIS loop closed New TSU link to BIS Prepare inject&dump

Preparation of sector test with beam SPS extraction to upstream TED (Jose, Francesco, Matthew) – Setup pilot cycle, copy/generate settings,… - Verena/OP early next week – Setup extraction bump without extensive aperture scan – Steer through extraction channel – Check beam on screens – Kicker (MKE) timing on OASIS  need BCT+MKE Mid-next week

TL test Nov Planning will be updated Main measurements relevant for ABT – Threading/steering – MKE waveform and TL stability – Aperture scans of lines – BPM/Corr polarities – Rough linear optics – Automatic TCDI setup – MSI/MKI pulsing – LBDS/MKI synch