5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,

Slides:



Advertisements
Similar presentations
UK CALICE plans Birmingham, Cambridge, Imperial, Manchester,RAL,RHUL,UCL.
Advertisements

24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
2 October 2003Paul Dauncey1 Paris Summary Part 2 and Status of UK Electronics/DAQ Paul Dauncey Imperial College London, UK.
RAL, 25-Jan-2005Nigel Watson / CCLRC-RAL PPD CALICE Calorimetry for LC  Physics motivation  Calorimetry  Design Considerations  CALICE  Status  Future.
7 Sept 2007Paul Dauncey - Calorimetry1 UK Opportunities in SiD Calorimetry Paul Dauncey Imperial College London.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
30 th June 2004Daniel Bowerman1 Dan Bowerman Imperial College LCUK Meeting - Lancaster 30 th June 2004 Calice Status For the CALICE-UK groups: Birmingham,
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
Mark ThomsonLCUK Meeting, Oxford CALICE STATUS Mark Thomson University of Cambridge  Overview  UK Hardware  UK Simulation  UK Reconstruction  Conclusions.
Calice ECAL Readout Hardware Status report Adam Baird ECAL Meeting 26 Sept 2003 LLR-Ecole Polytechnique.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
1/9/2003 UTA-GEM Simulation Report Venkatesh Kaushik 1 Simulation Study of Digital Hadron Calorimeter Using GEM Venkatesh Kaushik* University of Texas.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
31 October 01Plans for ECAL Involvement Plans for UK involvement in ECAL (CALICE) Paul Dauncey Imperial College z Status of (non-UK) ECAL work z What is.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 3 Paul Dauncey, Imperial College London.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Final CALICE OsC meeting: Status and summary of project
CALICE Oversight Committee
CEPC 数字强子量能器读出电子学预研进展
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
SiD Calorimeter R&D Collaboration
CALICE News The 2007 beam tests have started!
(My personal) CALICE Report
CDR Project Summary and Issues
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
Vishnu V. Zutshi For the NICADD team.
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
UK ECAL Hardware Status
ECAL electronics schedule
Proposal for UK involvement in CALICE
CALICE “A perfect calorimeter” Why How Who/When Nigel Watson
Proposal for UK involvement in CALICE
Trigger issues for the CALICE beam test
CALICE: Major Items Since September
Michele Faucci Giannelli
The CMS Tracking Readout and Front End Driver Testing
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial, Manchester, RAL, UCL

5 February 2003Paul Dauncey - Calice Status2 Study calorimetry for a future linear collider Both electromagnetic (ECAL) and hadronic (HCAL) ECAL studies are for Si-W tracking calorimeter HCAL studies are for analogue scintillating tile or digital (small cell) made with RPC’s, scintillating tiles or GEM’s Big collaboration already… 150 people, 24 institutes, 8 countries (including Europe, US and Asia) DESY is a member (CALICE grew out of TESLA TDR studies) …and still expanding 6 institutes have joined since the last LCUK meeting FNAL have also approached the collaboration Informal agreement on collaboration with SLAC/Oregon Recent summary of status written for DESY PRC in October Can find from CALICE-UK page The CALICE collaboration

5 February 2003Paul Dauncey - Calice Status3 Major aim is beam test ECAL 20  20  20cm 3 30 layers of tungsten 9720 Si diode pads with analogue readout HCAL 1  1  1m 3 38 layers of iron  5cm 2 scintillator pads with analogue readout, OR  1cm 2 RPC, scintillator or GEM pads with digital readout Timescale is short mid 2004 – mid 2005 CALICE beam test

5 February 2003Paul Dauncey - Calice Status4 UK project (finally!) approved in Dec 2002 Funding only for two full FY’s, not the three requested Funds up to March 2005; cannot complete beam test or do analysis! Can reapply to extend in ~18 months Equipment fund sufficient to build ECAL electronics We will design and build VME boards and DAQ system for beam test Hope to use same boards for HCAL readout (analogue and digital) Full effort request granted for engineering from Rutherford Laboratory New engineer (Adam Baird, RAL) has now joined the project One RA post for two years at Cambridge For simulation work, the other part of the UK involvement Travel money for the two FY’s CALICE-UK approval

5 February 2003Paul Dauncey - Calice Status5 Two sets of studies going on Jet resolution is major driver for fine-grained calorimetry Simulation indicates required 30%/  E is achievable using energy flow… …but simulation needs to be verified Hadronic interactions known to be difficult to model Compare Geant3/Geant4/Fluka predictions Birmingham and Cambridge groups Beam energy spread will be significant Luminosity will need to be known as a function of  s Bhabha rate is high and (obviously) depends directly on luminosity Measure  s for each event from acollinearity angle of e + and e – Could use tracker only but need very high efficiency at low angles UCL group CALICE-UK simulation studies

5 February 2003Paul Dauncey - Calice Status6 Expect EM response to be modelled well Use beam test configuration for studies Direct comparison to data when available Agreement is reasonable after tuning Low energy cut-offs Production of  -rays Geant3/Geant4 electron comparisons

5 February 2003Paul Dauncey - Calice Status7 Did not expect hadronic response to be as good Pion beam agreement also pretty reasonable after same tuning Comparable to (better than?) electrons Geant3/Geant4 pion comparisons

5 February 2003Paul Dauncey - Calice Status8 Protons show much worse agreement Small nucleon component in all jets Causes almost all of small discrepancy in pion jets Importance of using proton test beam Not previously recognised Data may be different from both models! Geant3/Geant4 proton comparisons

5 February 2003Paul Dauncey - Calice Status9 Effort from several groups in ECAL readout electronics Imperial, Manchester, UCL Following approval, RAL TD became involved; brought experience of CMS tracker Significant knowledge of design of Front End Driver (FED) Readout board for CMS silicon tracker Around 500 boards needed for whole tracking system FED architecture close to proposed CALICE board Data gathering and control almost identical Actual data input technology very different; CMS use fibre FED design is quite advanced Physical board layout complete, firmware designs in progress Two “final-specification” prototypes received two weeks ago and currently undergoing tests Will now use FED as a starting point for CALICE CALICE-UK electronics work

5 February 2003Paul Dauncey - Calice Status10 Original proposed system 15 readout boards Each handles digitisation of 2 layers 1 trigger board Holds off further triggers until readout complete 1 test board (not shown) For testing cable connections of readout board Readout board most complex part Each cable handled by slave FPGA Whole board controlled by master FPGA

5 February 2003Paul Dauncey - Calice Status11 FED board compared to readout board Master  BE +VME; very similar Slave  FE; need to rewrite firmware ADCs, etc; totally different

5 February 2003Paul Dauncey - Calice Status12 Ideally Keep everything to the right Redo everything to the left FED is bigger More £ per board More channels per board also Total cost approximately the same Saving is on schedule and effort FED layout

5 February 2003Paul Dauncey - Calice Status13 ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production 9 boards Redesign Layout Fabrication and assembly Testing

5 February 2003Paul Dauncey - Calice Status14 CALICE as a whole is still growing Dominating the LC calorimetry community CALICE-UK is finally approved Not everything we wanted (yet) Will keep us going for the next two years Simulation studies producing useful results Indicating the importance of proton beams Ensures beam test will be sensitive to most critical issues Electronics getting close to producing hardware Now based on CMS FED board; cost neutral but less effort needed Should have prototypes this summer, final boards early in 2004 CALICE summary