PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.

Slides:



Advertisements
Similar presentations
12/02/2013 Gerrit Jan Focker, BE/BI/PM 1 WireGrid electronics in the Linac 4 tunnel.
Advertisements

Mircea BogdanJuly 11, Crosstalk Test on CsI Front-End Cable Rev.B The University of Chicago.
PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
[ 1 ] LVDS links Servizio Elettronico Laboratori Frascati INFN - Laboratori Nazionali di Frascati G. Felici LVDS links.
PACS IBDR 27/28 Feb 2002 PACS Cryo Harness1 U.Grözinger, D.Lemke, R.Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL,
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Max-Planck-Institut für Astronomie Heidelberg PACS SVR 22./23. June 2006 MPE Garching J. Stegmaier, U. Grözinger, D. Lemke, O. Krause, H. Dannerbauer,
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
The 741 opAmp DC and Small Signal Analysis Jeremy Andrus For Engineering 332 May 15, 2002 Prof. Ribeiro.
Connector Board Meets customer need 6. Accept data from auxiliary external cameras and INS units Power Input Regulation Monitoring.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
AMY Meeting. 24 Mar 2011 status Auger Lecce Meeting,
Flow sensor circuitry Eduard Stikvoort 00/1A The work was done in Philips Reaearch Eindhoven.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
PACS IIDR 01/02 Mar 2001 On-Board Data Compression1 On-Board Data Compression Concept A. N. Belbachir Vienna University of Technology.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
By: Uriel Barron Matan Schlanger Supervisor: Mony Orbach Final Review March 2015.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
HF-Protection of Electronic Circuits Thomas Losert.
Laser Drive Needs Total laser current –I TOT = I BIAS + I MOD BIAS Current –Keeps I TOT > I TH (laser “on”) –I BIAS – I TH related to speed Modulation.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Autonomous Wheelchair Tyler Morton & Ben Hoerst Senior Design Advisor: Dr. Stanislaw Legowski Project Advisor: Dr. Steven Barrett ECE Senior Design.
Simulation of a DEPFET Pixel Detector IMPRS Young Scientist Workshop July, 26 – 30, 2010 Christian Koffmane 1,2 1 Max-Planck-Institut für Physik, München.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
PADME Front-End Electronics
EE496 Design Review: Philip Robbins
Obstacle avoiding robot { pixel }
PID meeting SNATS to SCATS New front end design
Calorimeter Mu2e Development electronics Front-end Review
ECAL Front-end development
Automatic human detector garbage can.
ABB i-bus® EIB Electronic Switch Actuator, 4-fold
5.3. Noise characteristics
The Relay based Multiplexer
Activities so far Meeting at Imperial, Paul and Matt
Σ-D Analog to Digital Converter for CMOS Image Sensors Nonu Singh (RIT, MicroE Co-Op) Background After fabricating an imaging sensor it needs to be characterized.
Instructor Resources.
FeMaidens Programming
GLAST Large Area Telescope:
BESIII EMC electronics
Grounding, Power Distribution
5.3. Noise characteristics
Instructor Resources.
We are working on developing “cheap” RTD monitoring channels for the CMS Phase-2 requirements. The channels will provide the complete readout for 4-wire.
Presentation transcript:

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL, CEA, IMEC, KT, MPE

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness2 Requirements Provide signal integrity for  14 useful bits of science data for 800 Ge:Ga-detectors and 2560 Bolometer pixels Provide stable and low noise supplies for detector bias, readout circuits, high resolution position sensors Independent supply groups for detectors to minimize risk Low resistance for actuator drive lines to minimize heat dissipation and allow accurate controlling Low heat conduction Goal: Use of ISO-type cables as far as possible

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness3 Triaxial cables for Ge-detector output signals to reduce heat load at 4K-level Shielded twisted pair cables for BOL-detector output signals Low resistance cables for high current lines Special Needs

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness4 PACS Cryo Harness Overview

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness5 PACS Bolometer Harness Overview

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness6 PACS Cryo Mechanics

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness7 PACS Ge-Detector Subsystem

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness8 PACS Ge-Detectors / Distribution Boards

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness9 Examples for connector pin allocations / cable IDs

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness10 Wiring Distribution Boards (example sheet)

PACS IIDR 01/02 Mar 2001 PACS Cryo Harness11 Conclusions PACS cryo harness consists of 1156 lines and 200 shields (overshields additional) Cable types for all signals and supplies are defined => Decision on special types needed (triaxial cables, twisted pairs…) 51 MDM-connectors at outside of FPU. Identification codes and types (size) for all connectors are defined Connector pin allocations are defined Cryo harness document is available