Update on EMIS 12-13 PDV, ESWG April 2013 Sources used: EMIS 12-13, Commune Database 2011, Jim Shoobridge report.

Slides:



Advertisements
Similar presentations
REGIONAL EDUCATION INDICATORS PROJECT Progress towards the achievement of the Summit of the Americas Goals November 14, 2007.
Advertisements

An Evaluation of Early Childhood Care and Education Programmes in Cambodia Nirmala Rao The University of Hong Kong Emma Pearson Macquarie University Mark.
November 2012 Promoting Rural Poor Community Self Help & Unity through Model Credit Union Development Program in Cambodia.
Cambodia Innovation Plan 31 October 2012
Capacity Development Technical Assistance on Mainstreaming Climate Resilience into Development Planning Ancha Srinivasan, Ph.D. Principal Climate Change.
Commune and Sangkat Election 3 June 2012 Kem Ley, 30 May 2012.
NATIONAL POWER and HYDROPOWER DEVELOPMENT PLANS IN CAMBODIA
AME Education Sector Profile
Cambodia’s Profile in Power Sector The First Mekong Energy and Ecology Training May 11-30, 2009, Thailand TONN KUNTHEL, BY HOUR & PHALLUY.
Cambodia Tourism Session 2 Cambodia Tourism.
ECE Study in Cambodia: evidence based advocacy for policy formulation and development of innovations with the focus on equity Natalia Mufel with Arianna.
PISA for Development Three issues with target populations 1.Low level of lower secondary school completion rates 2.High percentage of over-age students.
SEMINAR PRESENTATIONS Cambodia DHS and Measure DHS+ Survey Objectives and Methodology Housing and Characteristics of the Population Fertility and its Determinants.
AME Education Sector Profile
Prepared by:FNN April 22, The case of rice marketing arrangement CEDAC Enterprise and farmers living in Sdok Development Community located in.
Cambodia Country Profile Continent AsiaAsia Region Southeast AsiaSoutheast Asia Total Area: 181,035 km 2 - land 176,520 km² (97.50% ) - water 4,520 km².
Current AH1N1status and MoH Response Measure Sovann Ly, MD, DTMH, MCTM Deputy Director of CDC Department.
SESSION 1: Sharing of Experience in GAFSP Processes in Cambodia, Nepal, Mongolia and Bangladesh (15 minutes to share, 15 minutes for open forum) Lessons.
Irrigation Service Centre Project Part III: Results [July 2009 to June 2010] Coordination meeting 24 August 2010 A. Deligne, L. Piseth, S. Sophak.
1 Value Chain Analysis of Free Range Chicken Presented by Sim Kong, General Director of CEDAC Agri based Enterprise Support Program June 2008.
Impact of the Alternative Dispute Resolution Program Implemented by Buddhism for Development Cambodia Upon Law on Administrative Management of the Capital,
 Enrolment in primary education in developing regions reached 90 per cent in 2010, up from 82 per cent in 1999, which means more kids than ever are attending.
Child Health 2010 Cambodia Demographic and Health Survey.
CRC Cooperation and Partnership 8/27/ CRC strategy and core areas CRC cooperation in DM networks CRC cooperation in Health networks.
SEMINAR PRESENTATIONS Cambodia DHS and Measure DHS+ Survey Objectives and Methodology Housing and Characteristics of the Population Fertility and its Determinants.
Multiple Indicator Cluster Surveys Data Interpretation, Further Analysis and Dissemination Workshop Literacy and Education.
Business Review to Dumex Malaysia
Recent CLC Practice & Challenges in Cambodia
FLOOD EARLY WARNING SYSTEM C a m b o d i a’s E x p e r i e n c e A Project Implemented by: American Red Cross Action Contre la Faim Cambodian Red Cross.
MDG Data at Sub-national Level: The Experiences of Cambodia Bangkok, Thailand, January 2009 MDG Monitoring Workshop Lay Chhan National Institute.
Ministry of Land Management, Urban Planning and Construction
Policy and Regulatory Framework in Power Sector in Cambodia
SEMINAR PRESENTATIONS Cambodia DHS and Measure DHS+ Survey Objectives and Methodology Housing and Characteristics of the Population Fertility and its Determinants.
New Product Launch 2010 (SC meeting) 29 th October 2009.
SEMINAR PRESENTATIONS Cambodia DHS and Measure DHS+ Survey Objectives and Methodology Housing and Characteristics of the Population Fertility and its Determinants.
Kick off meeting 1 Innovation Energie Développement CAP REDEO February 07 CAP REDEO GIS TOOL FOR RURAL ELECTRIFICATION PLANNING VIENTIANE APRIL 2007.
Impact of Migration on Older Age Parents Presented by HOUN Kalyan and KHUON Chandore at CDRF National Symposium September 9-10, 2010, Phnom Penh CCC/ADI.
SEMINAR PRESENTATIONS Cambodia DHS and Measure DHS+ Survey Objectives and Methodology Housing and Characteristics of the Population Fertility and its Determinants.
Working Towards an Access to Information Law in Cambodia: Bridging the Government and Citizens for Participatory Law-Making
1 National Flood Management and Mitigation Prepared by Mr. MAO Hak, MOWRAM and Members of Cambodian Delegation With assistance from Mr. SOK Saing Im, National.
Cambodia Situation on Patient Safety
KEM LEY | Principal investigator NHIM DALEN |Consultant BORAY BORALIN | Data Analyst UMAKANT SINGH | Advisor CAMBODIA PEOPLE TRIBUNAL CPT-AFW 5 Feb 2011.
Flood Early Warning System Project Mekong River Commission with funding from OFDA, Cambodian Red Cross,American Red Cross, and the International Federation.
1 Computer Science in Cambodia Seminar : Special Topic Computer Graphic with Relevant in the Society Ms. Sophea CHAN 02.May.2011.
1 Caritas Takeo Eye Hospital Tel: (+855) / Website: Present by: Te Serey Bonn,
Mapping Accountability Processes in Cambodia Adam McBeth Monash University – Oxfam Partnership.
Emerging Markets Consulting GSF CRSHIP II Baseline and Feasibility Study October 6, 2015.
A POVERTY PROFILE FOR SIERRA LEONE Kristen Himelein World Bank June 26, 2013.
Pharmacies: Partners in the Fight Against TB PATH Hara Mihalea CHE, MPH Tuberculosis and Public Health Consultant
Alcohol consumption situation, its impacts and control measures in other countries.
Maternal Health 2010 Cambodia Demographic and Health Survey.
HIV and AIDS Data Hub for Asia-Pacific Review in slides Cambodia Last Update: November 2014.
Adult and Child Mortality 2010 Cambodia Demographic and Health Survey.
Community Based DOT(S) Kong Kimsan MD, PUHP JICA TB Control Project, Cambodia 11 th -July-02.
COSOP IFAD Country Strategic Opportunities Programme Final Review Supreme National Economic Council.
1 The Other China – Left-behind – Struggling Out Presentation CIES 2008 Mar 21 in NY NY.
Annual Review 2011 Julian Abrams PART 2: PROJECT DELIVERY COSOP IFAD Country Strategic Opportunities Programme.
KHALID EL HARIZI, IFAD COUNTRY PROGRAMME MANAGER CAMBODIA THE COSOP AS AN INSTRUMENT FOR PERFORMANCE MANAGEMENT Annual COSOP Review Workshop – Phnom Penh.
Animal Health Situation in Cambodia
Male population aged 15-49⃰ Ratio MSM per 1000 male population
© The Author(s) Published by Science and Education Publishing.
PEN Cambodia: Overview of Poverty-Environment Context
2010 Cambodia Demographic and Health Survey
2016 JAG Secretariat: DCA/CA & PIN Paul Conrad, PIN DM PM
Claude Fauquet GCP21 Cambodia; Sept 18, 2018
2010 Cambodia Demographic and Health Survey
WS on Surveillance & Epidemiology
FAWCO & Water Changing the flow…
HIV/AIDS-Related Knowledge, Attitudes, and Behavior
2010 Cambodia Demographic and Health Survey
Presentation transcript:

Update on EMIS PDV, ESWG April 2013 Sources used: EMIS 12-13, Commune Database 2011, Jim Shoobridge report

Grade Specific Enrolments Grade 6Grade 7Grade 9Grade 10G10/6G7/6G10/ , ,385 60,098 27, , ,700 86,237 40, , , ,908 52, , , ,219 66, , , ,420 67, , , ,023 89, , , ,878 90, , , , , , , , , , , , , , , , , , , , , , , , , Note: absolute numbers …. But no improvement in proxy effeciency

Enrolment by Grade Source: EMIS 12-13

Pop Province Aged 6-11 Change Total Banteay Meanchey 88,88990, % Battambang 135,643138, % Kampong Cham 220,914220, % Kampong Chhnang 65,99666, % Kampong Speu 103,071104, % Kampong Thom 91,38191, % Kampot 80,58580, % Kandal 127,086128, % Kep 5,3835, % Koh Kong 16,90817, % Kratie 48,87049, % Mondul Kiri 10,46410, % Otdar Meanchey 30,12031, % Pailin 9,69810, % Phnom Penh 120,717125, % Preah Sihanouk 26,74527, % Preah Vihear 27,49927, % Prey Veng 128,831128, % Pursat 53,92754, % Ratanak Kiri 25,60626, % Siemreap 128,146131, % Stung Treng 17,30217, % Svay Rieng 60,74260, % Takeo 113,599113, % Whole Kingdom1,738,1221,761, % - Urban Area 322,191330, % - Rural Area 1,415,9301,431, % Increase in Urban Pop Increase Remote provinces Interesting: Kg Cham Prey Veng Svay Rieng Takeo  Populated provinces

Successful Re-entry ??? Unlikely. Change in Enrolment by Grade compared to previous year Province Grade 4Grade 5Grade 6 Banteay Meanchey 101%111%95% Battambang 98%105%97% Kampong Cham 121%156%97% Kampong Chhnang 104%112%99% Kampong Speu 96%100% Kampong Thom 98%105%95% Kampot 98%105%98% Kandal 102%164%99% Kep 80%124%97% Koh Kong 95%119%98% Kratie 96%111%97% Mondul Kiri 108%143%81% Otdar Meanchey 104%108%102% Pailin 126%130%110% Phnom Penh 103%115%90% Preah Sihanouk 102%121%94% Preah Vihear 102%108%86% Prey Veng 102%129%97% Pursat 93%128%99% Ratanak Kiri 116%124%106% Siemreap 109%138%99% Stung Treng 106%100%99% Svay Rieng 94%119%98% Takeo 95%108%98% Whole Kingdom 103%124%97% - Urban Area 103%114%94% - Rural Area 103%126%98% Unrealistic changes in Grade 5 Enrolment Almost throughout the country EMIS error? Feedback from Kg Cham: POE/DOE/schools: All: EMIS not correct, even at school level big differences, and even by gender This makes it unlikely that it is a processing error (e.g. SPSS script) Impact on PNER can be PP

Comparing EMIS G 5 enrolment with POE Kg Cham Grade 5 Enrolment Perc EMIS POEEMIS higher District Batheay 2,890 4,283 2, % Chamkar Leu 2,583 3,520 2, % Cheung Prey 2,331 3,722 2, % Dambe 1,992 3,854 2, % Kampong Cham % Kampong Siem 2,439 4,108 2, % Kang Meas 2,329 3,550 2, % Koh Sotin 1,589 2,008 1, % Krauch Chhmar 1,907 2,771 2, % Memot 3,717 6,927 4, % O Raing Euv 2,222 3,481 2, % Ponhea Krek 3,192 4,566 3, % Prey Chhor 3,038 4,827 3, % Srey Santhor 2,281 3,312 2, % Steung Trang 2,721 4,971 2, % Suong % Tbaung Khmum 3,613 5,145 3, % Whole Province 40,341 62,986 41, %

% Over-age Enrolment Change in Province % Over-age Enrollment (Total) Percentage Points PrimaryL.Sec.PrimaryL.Sec. Kampong Cham Kampong Speu Kep Koh Kong Otdar Meanchey Phnom Penh Preah Vihear Stung Treng Svay Rieng Kingdom Urban Area Rural Area Some big changes Kg Cham ?? Impact on NER! PNER: provinces with considerably smaller % over-age: NER goes up Note: Big change for LS

71 districts NER >= < 80 For both: In some Surprising areas Primary NER (EMIS)

the regional gap has narrowed substantially 12 1: Education

119 districts < 80 = below target But: Private school data impacts for urban areas Need further analysis Primary Completion (EMIS)

Percent Enrolment in Private Primary Schools in Top 12 Districts 14 Source: CDB 2011 Commune Database: About 48,000 students in Private Primary Schools About 2% of 2.2 Million But about 15% of urban enrolment of 325,020. CDB: Annual, collected in December from communes and village chiefs National coverage M o Planning Wealth of data 1: Education PCRs Phnom Penh: -PPM: 50.7% -CHKM: 56.5% -DPH: 96.0% -TK: 84.5% -MCH: 79.6 %

Cambodia is on track to achieve Primary NER Targets by EMIS2012/13 TOTAL URBAN RURAL EMIS2012/13 TOTAL 94.3 URBAN 76.7 RURAL 98.6 EMIS2012/13 TOTAL 97.0 URBAN 83.2 RURAL U RBAN NUMBERS ARE LOWER IN EMIS: N O CAPTURING OF PRIVATE SCHOOLS 1: Education Primary Net Enrolment Primary Gender Parity

1) C ONSIDERABLE G AP EMIS E NROLMENT ( EXCL PRIVATE ) AND A TTENDANCE DATA FROM CDB, DHS, C ENSUS, CSES, AND 2) T REND IS LESS POSITIVE THAN EMIS 16 1: Education

Repetition by Level

No more Survival Rates …. But..

LSS NER has doubled in the last 10 years, but it is much below even the reduced MDG target … … ALTHOUGH IT SEEMS TO BE PICKING UP RECENTLY AFTER SOME STAGNATION 19 1: Education

there is recent progress with repetition rates, B UT DROP OUT RATES HAVE REMAINED STAGNANT … M O EYS T ARGET WAS TO HALF R EPETITION AND D ROP O UT RATES BETWEEN 2007/08 AND 2014/ : Education

The transition rate to LSS is less than projected and stagnating … A ND THE DROP OUT RATE IN LSS REMAINS HIGH 21 T HESE REPRESENT A 40% L OSS TO THE HUMAN RESOURCE DEVELOPMENT PROCESS 1: Education

That’s It For now … Next: - a bit more analysis - come up with main issues to be improved - check with DoP