Avoided Cost Calculator Workshop Day 2 October 4, 2005 Energy and Environmental Economics, Inc.

Slides:



Advertisements
Similar presentations
Canada Committed to a Nuclear Future Presented to the 15 th Pacific Basin Nuclear Conference by Milton Caplan President, MZConsulting Inc October.
Advertisements

Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
A Comparison of Measure Avoided Cost Calculations using Utility TOU Load Shapes and DEER Hourly Measure Savings 14 March 2006.
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
Technical Conference Avoided Cost Modeling January 6, 2015.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Energy and Environmental Economics 1 Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 3, 2005.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
Copyrighted © 2000 PG&E All Rights Reserved CASE Initiative Project TDV Economic Update Brian Horii and Snuller Price Energy & Environmental Economics,
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
Renewable Net Short.
Water Energy Nexus CPUC Cost Allocation Workshop Jarred Ross, Water Energy Nexus Program Manager May 4, 2015.
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 3, 2005.
Overview – Non-coincident Peak Demand
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
2 Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application EE Potential Summary Study Overview CALMAC Meeting.
1 Quality Control Review of E3 Calculator Inputs Comparison to DEER Database Brian Horii Energy and Environmental Economics, Inc. November 16, 2006.
1 Docket 7081 Transmission Planning Information Workshops Third Workshop September 30, 2005 Shaping Demand-Side Resources To Address Transmission Constraints.
1 EE Evaluation Report on 2009 Bridge Funding Period California Public Utilities Commission November 22, 2010 Energy Division Energy Efficiency Evaluation.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
Avoided Costs of Generation
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
1 CPUC Avoided Cost Workshop Introduction and Overview.
1 Issues summary Pre workshop comments. 2 Scope of the 2006 Update 1. Common definition of peak 2. Avoided cost and E3 Calculator updates for peak and.
Generation Adequacy Task Force Update to WMS September 14, 2011.
Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 4, 2005.
Bill Savings Public Workshop Costs and Bill Saving in the Low Income Energy Efficiency Programs for 2003 to 2005 April 21, :00 AM to Noon 77 Beale.
Demand Response and the California Information Display Pilot 2005 AEIC Load Research Conference Myrtle Beach, South Carolina July 11, 2005 Mark S. Martinez,
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
Bill Savings Costs and Bill Saving in the Low Income Energy Efficiency Programs for 2002 to 2004 Bill Savings Public Workshop April 15, San Diego.
Quantifying Public Power’s Environmental Contributions: Tree Benefits Estimator APPA National Conference, June 20, 2005 Misha Sarkovich, Ph.D. Program.
National Action Plan for Energy Efficiency eeactionplan The Role of Energy Efficiency in Utility Energy Planning Snuller Price Partner Energy.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
RTF Update Kevin Smit Kelly Tarp ProCost Version 3.0 Modifications A registered professional engineering corporation with offices in the Seattle,
UPDATE TO THE IT GOVERNANCE STEERING COMMITTEE BY THE COMMITTEE ON BUSINESS TECHNOLOGY (CBT) NOVEMBER 1, 2012.
Guidelines Revisions Defining What RTF Means by “Savings” December 17,
Portfolio Committee on Environmental Affairs Deidré Penfold Executive Director 22 September 2015.
Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
Warren Township Study To Examine Enrollment Project (STEEP) Project Plan & Criteria High Level Timeline Sub-Committee Goals & Deliverables Revised October.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Structure of Charges Year-end review for DCMF 22 November 2007.
Senior Design Fall 2014 ECE Department and Center for Clean Energy Engineering Emily Simonelli Lindsay Sullivan Taniya Singh United Illuminating in Orange,
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
1 Proposed Policies to Increase the level of Demand Response Energy Action Plan Update April 24 th, 2006, Sacramento, CA Mike Messenger, CEC.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Affairs Demand Response and Local RA Criteria Discussion
1 W-E Calculator 2.0 Workshop Experience Implementing the W-E Calculator Jill Kjellsson Program Manager – Industrial, Ag and Water April 6,
Reports foreseen within Task 21 Task 21 Experts meeting, Seoul 20 April 2011 Harry Vreuls Operating Agent.
LNBA Subgroup: Avoided Transmission Value
Bypass Distributed Generation (DG) Forecast Methodology
Seminar On Energy Audit Submitted To: Submitted By:
Hourly vs TOU Avoided Costs
GENESYS Redevelopment Strawman Proposal
Mike Jaske California Energy Commission
Terry Baker Peak Reliability
Resource Adequacy Demand Forecast Coincidence Adjustments
United Nations Statistics Division
Avoided Cost and E3 Calculator Update Workshop
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

Avoided Cost Calculator Workshop Day 2 October 4, 2005 Energy and Environmental Economics, Inc.

Potential Calculator “Quick Fixes” Counting period inconsistencies for peak demand reporting Standard Practice Manual conformance DEER lighting error coprrection (SDG&E only) SCE motor summer peak kW correction Allocation of gas program savings between years Revision to accommodate decimal EULs. Consistent Calculator across IOUs  Consistent interface and calculations, versus consistent input data Other ideas?

Counting Issues What is the question?  Energy Savings for a Year How much reduction did I see this year? (what did I harvest?) How much reduction will I see because of what I did this year? (how much did I plant?)  Peak reductions How much reduction at a certain point in time (e.g., for procurement) How much reduction implemented (to gauge progress toward long term goals)

Counting Issues How do I treat measures with short lives?  Assume I install a widget that lasts one year, and I repeat this every year for 2006 through Assume this widget gets me 1kW. Do I claim 3kW of installed devices? I did put in three 1kW devices. Do I claim 1kW, since I only saw 1kW of load reduction due to that widget in any year? How do I count committed versus realized measures?

Potential Calculator “Quick Fixes” Counting period inconsistencies for peak demand reporting Standard Practice Manual conformance Correct DEER lighting error (SDG&E only) SCE correction of summer peak kW application for motor Allocation of gas program savings between years Accommodate decimal EULs. Size reduction Consistent Calculator across IOUs  Consistent interface and calculations, versus consistent input data

Potential Calculator “Quick Fixes” Counting period inconsistencies for peak demand reporting Standard Practice Manual conformance DEER lighting error coprrection (SDG&E only) SCE motor summer peak kW correction Allocation of gas program savings between years Revision to accommodate decimal EULs. Consistent Calculator across IOUs  Consistent interface and calculations, versus consistent input data Other ideas?

Consistent across IOUs

Potential Calculator “Quick Fixes” Counting period inconsistencies for peak demand reporting Standard Practice Manual conformance DEER lighting error coprrection (SDG&E only) SCE motor summer peak kW correction Allocation of gas program savings between years Revision to accommodate decimal EULs. Consistent Calculator across IOUs  Consistent interface and calculations, versus consistent input data Other ideas?

Longer Term Items Recap of Draft Report Recommendation Requirements (Feb 20, 2006 draft report)  The definition of peak demand reductions Common definition Agreed upon calculation  Refinements to avoided cost methodology and tie in with other proceedings  Consistency in underlying load shape data and the methods by which that data is translated into peak savings estimate  Display of load shapes

Longer Term Items continued Cross walk to other proceedings such as resource adequacy and procurement Availability and sufficiency of load data going forward Acquisition and allowance for new load shapes EUL updates Size reduction

Update on DR methodology work