20071212EM Report1 Report from Engineering Management Group to GDE EC 2007/12/12 Report by N.Toge.

Slides:



Advertisements
Similar presentations
Gaining Senior Leadership Support for Continuity of Operations
Advertisements

Configuration Management
PAGE Quick Guide to the FedRAMP Readiness Process 1 August 2014 Presented by: FedRAMP PMO
CSE101 Lab 3 Lecture Productive Team Work and Meeting CSE 101 Yinong Chen 1.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
N.Toge on SB20091 SB2009 Rebaselining Proposal Document - How do we get it done? /10/2 N.Toge (KEK) for SB2009 Efforts.
CCTC Background Process coordinated by NASDCTEc 42 states, DC, and one territory involved in development Modeled the process and outcomes of Common Core.
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
Envision SFA developing the next strategic plan….
2008/3/6 Sendai GDERev. 41 On EDMS for GDE (but not a lecture for it) GDE Sendai Meeting 2008/3/6 Nobu Toge for GDE Engineering Management with Lars Hagge.
Planning. SDLC Planning Analysis Design Implementation.
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting January 11, 2008.
SAQA 64069: FET Certificate: Archives and Records Management Presentation to SARMAF Louisa Venter
Release & Deployment ITIL Version 3
E-Document Maura Barone (GDE/Fermilab) – Part 1 Lars Hagge (DESY) – Part 2 2 June 2007.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
ILC EDMS project suite Status Maura Barone GDE/Fermilab ILC Valencia - November 7, 2006.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
By Tsukhoe M. //Garoes and Beauty Jiji On Behalf of the Team as a chief conservancy governance tool: The Doro !Nawas Case “Constitution” -
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
Honors Level Course Implementation Webinar Honors Rubric and Portfolio Review Process October 7, 2013.
Software Quality Assurance Lecture #2 By: Faraz Ahmed.
Peter H. Garbincius November 20, 2008 Cost Management LCWS08 - UIC 1 ILC Cost Management J. Carwardine, T. Himel, F. Lehner,T. Shidara, L. Hagge, P. Garbincius,
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
 Overview  Online Report Process ◦ Report process for Grantees/Look-Alike Site Visits ◦ Report Process for Look-Alike Applicant Site Visits  Report.
ITIS 2110 Lab #13.  Work on Project  Turn in by end of this lab: ▪ Cover sheet ▪ Brief status ▪ May resubmit Project Proposal with updates for status.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Post-Secondary Education Program Joint AFN/INAC PSE Program Review with representation from NAIIHL and the Labrador Inuit Regional Information Process.
ISLN Network Meeting KEDC SUPERINTENDENT UPDATE. Why we are here--Purpose of ISLN network New academic standards  Deconstruct and disseminate Content.
Chapter 10 : Variables for Success
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
FAO/WHO CODEX TRAINING PACKAGE SECTION TWO UNDERSTANDING THE ORGANIZATION OF CODEX Module 2.5 How do Codex Committees function?
CGMS-40, 5 November 2012 Coordination Group for Meteorological Satellites - CGMS Towards a CGMS High Level Priority Plan (HLPP)
1 Management System Owners Preparation for Primary Working Session Requirements Management November 3, 2011.
E-Document Part II: ILC EDMS ILC / LCWS Workshop, Hamburg 2007 Lars Hagge Deutsches Elektronen-Synchrotron (DESY)
Evaluating & Maintaining a Site Domain 6. Conduct Technical Tests Dreamweaver provides many tools to assist in finalizing and testing your website for.
Aysegul Akin Assistant FAO Representative September 2012, Ankara.
IMSSA STRATEGIC PLAN FT Cawood – Outgoing President.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
The Global Institute for Ethical Leadership GIEL CONCEPT WEB Development Project Presented on September 20, 2007 Larry Ruddell Nupur Agarwal Russell Robinson.
Feb 7th, 2007 BILCW07 1 ILCAgenda – ILCDoc – ILC EDMS Status Maura Barone GDE/Fermilab.
ANNOOR ISLAMIC SCHOOL AdvancEd Survey PURPOSE AND DIRECTION.
By Godwin Alemoh. What is usability testing Usability testing: is the process of carrying out experiments to find out specific information about a design.
Chapter 3-Multimedia Skills
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
Curriculum Project for Information Extraction. Task definitions Task 1: Entity detection and recognition Task 2: Relation detection and recognition Both.
ERCOT Comments TNT Transition Plan Ray Giuliani TAC Meeting October 6, 2005.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
Date Event Global Design Effort 1 CCB Report GDE Meeting, Vancouver, July, 2006 Nobu Toge KEK/GDE.
CLARIS Training on CropSyst CropSyst Model Training DCAO-UBA, Buenos Aires, 6-10 March 2006 Course delivered by Marcello Donatelli (CRA – ISCI, Italy)
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
Jan 18, EDMS 1 Status of ILCDoc Maura Barone GDE/Fermilab.
2008/3/4Rev. 21 On EDMS for GDE (but not a lecture for it) GDE Sendai Meeting 2008/3/4 Nobu Toge for GDE Engineering Management with Lars Hagge and Nick.
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
JIGSAW METHOD OF TEACHING. The purpose of Jigsaw is to develop teamwork and cooperative learning skills within all students. In addition it helps.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Preparation of the Self-Study and Documentation
Module 5: Communication Plan and Process for Addressing Barriers
BSBWOR301 Organise personal work priorities and development
Working in Groups in Canvas
ILD phone meeting September 5, 2017 K. Kawagoe (PSB chair)
Oct 22 Group Leaders Planning meeting
On EDMS for GDE (but not a lecture for it)
EVAL Practical Introduction May 2018
Dissemination Working Group (DWG)
Design Report Submit one report per sub-team
Project Closure And Termination
Progress Report GUID on Information Systems Audit
Presentation transcript:

EM Report1 Report from Engineering Management Group to GDE EC 2007/12/12 Report by N.Toge

EM Report2 Priorities and Strategies Priority #1 –Have all GDE EDR members start using EDMS in the sense of start uploading existing pile of documents, under an approximately correct category structure, and with a reasonably workable authoring / approving (not CC!) roles assigned to each of the team members. –Goal: ASAP, e.g. before Christmas Priority #2 –Implement the CC protocol –Goal: Early Note: –EDMS will likely need some reviews and revisions as we proceed toward Sendai Meeting, and they will have to be part of our plan.

EM Report3 EDMS Training ILC EDMS Power-User Training –held at DESY November 26-30, Approximately 17 participants –Organized to teach the necessary skills and background information for becoming an ILC EDMS Power User. –URI: Follow-up actions to take –Upload the related materials on the web –Additional user courses (remote via webex, at DESY, locally at non-DESY labs such as FNAL)

EM Report4 EDMS Category Structure: A “category” –(also called “identifier” or “keyword”) is a sort of an identifier for a set of documents whose content deals with common subject matters. A document in EDMS is always assigned to at least one "category". An initial draft (Excel tables) Category List –has been circulated within PMEDR on October 31. More than a few feedback comments have been received. Revised Category List, –has been worked out, as a result, by Walker, Hagge and Toge, and is currently being implemented in the ILC EDMS by the team under L.Hagge. ETA: –Before Christmas, 2008

EM Report5 EDMS Implementation (Cont) Teams –Team is a group of folks who share the tasks of authoring / updating the documents related to a set of categories (e.g. PM_Team, TAG_Leaders_Team, Cryomodule_Team) etc. A draft “Team list” –is being implemented in EDMS, together with the initial category list by the team under Hagge. Assignments are also being made –for “team leaders”, authoring privileges and access privileges. ETA: –Same as “Category list”,. Including implementation. i.e. Before Christmas, In addition: –Preparation of “Bills of Materials” (BOM), and “Project” being initiated.

EM Report6 Configuration Control CC request form: –A draft of the CC request form to submit with each EDMS change request has been circulated within PMEDR on November 27. –Besides feedback from PMEDR members, critical consultation and approval of PMs are required before its finalization and formal use. At present, –all conceptual issues have been cleared, –leaving implementation issues, including the revised form and interfacing with EDMS, and preparation of explanatory documents. –For instance, Appendices of EDR Planning Doc needs some touch ups. –ETA: the end of 2007 or early January, 2008.

EM Report7 Others Consolidation of All Numerical Tables from RDR: –To facilitate cross-examination of numerical statements and preparatory work toward full-fledged system design activities, all the Tables that appeared in RDR have been consolidated into an Excel book. –ETA: Ready for review by PMEDR. In-depth discussions with TAGLs and TAG members. –These interactions before/during EDMS implementation + usage will be essential. They have not yet taken place very systematically. They will have to.