A Mid-Process Review Marilyn C. Kray Vice President, Exelon Generation President, NuStart Energy Development Regulatory Information Conference March 10,

Slides:



Advertisements
Similar presentations
New Nuclear Plants in the United States
Advertisements

Milton Caplan Dr. Terry Thompson PBNC Vancouver, August, 2014 NEW NUCLEAR PLANT DEVELOPMENT - BALANCING LOCALIZATION WITH COMPETITIVENESS.
Modular and Portable Buildings Association Current and Future Energy Efficiency (Building Regulations Part L2) Key drivers.
A 2030 framework for climate and energy policies Energy.
Exchange A1: The support required to make Energy Performance Contracting a viable energy and carbon solution (TEC) Steve Creighton, Senior Relationship.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
GEF and the Conventions The Global Environment Facility: Is the financial mechanism for the Stockholm Convention on Persistent Organic Pollutants Is the.
1 Ingmar Sterzing, August 1, 2013 Changes in Electricity Planning, Project Execution, and Operation Univ. of Pittsburgh School of Law 2013 Energy Law and.
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
Western States Energy & Environment Symposium October 27, 2009.
The current overall EU policy framework: Europe 2020 strategy, Innovation Union and Energy 2020 Strategy On March 2010, the Commission presented a Communication.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Climate change Submission to parliament by Business Unity South Africa.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
WALL STREET UTILITY GROUP The Energy Policy Act of 2005: The Implications for Nuclear Energy 22 September 2005.
A Typical Business Plan
Economic Outlook and the Impact to Fleet Budgets Greg Corrigan, Vice President, PHH Strategic Consulting February 9, 2010.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
City of Watsonville Climate Action Plan and Carbon Fund Project Technical Advisory Committee Meeting #7 Final Meeting April 9, 2014.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
1 Going From Good to Great: Cooperation, Collaboration, and Continual Learning Mark A. Satorius, Director Office of Federal and State Materials and Environmental.
Nuclear Power Plant New Build Activity: A Market Overview
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
DOE OFFICE OF INDIAN ENERGY Step 5: Project Operations & Maintenance (O&M) 1.
Ch 1-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Ukraine energy policy outlook Ildar GAZIZULLIN International Centre for Policy Studies May 25, 2012, KSE Alumni congress.
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
The Resurgence of the Nuclear Industry Angie Howard Nuclear Energy Institute April 23, 2009.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
New Nuclear Generation Ellen Ruff President, Duke Energy Carolinas.
Renewable Energy: Legal Challenges and Solutions for the Green Economy American Bar Association Renewable Energy: Legal Challenges and Solutions for the.
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
Plant Parameter Envelope for Early Site Permits
Copyright Reserved GreenTech Malaysia 1 Project Brief/Summary  Project goal is to ensure realization of national green technology policy aspiration and.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Project Licensing Status Jim Kinsey Director, Regulatory Affairs NGNP Project.
New Reactor Construction Inspection
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Risk Management – Dynamic hedging 21st Mar Schneider Electric 2 ●Risk management ●The optimal duration of cost planning ●Procurement objectives.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
Forming a Cost Assignment/ Cost Recovery Team RMATS Steering Committee January 13, 2004.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
1 Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
1 RIC 2009 Design Acceptance Criteria: Searching for Acceptance Andrea Sterdis Tennessee Valley Authority March 11, 2009.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Creating a Sustainable Energy Future Alex Glenn State President Progress Energy Florida, a subsidiary of Duke Energy.
Long-Term Planning Presented by: APP Site Visit Don Untch
The Resurgence of the Nuclear Industry Angie Howard Nuclear Energy Institute April 23,
Challenges for New Base Load Generation Dave Harlan
Briefing on 2017 CAISO Policy Initiatives Roadmap
GAMING DEVELOPMENT PROCESS AND FOCUS
Adding Nuclear Power to the Grid
Plant Parameter Envelope for Early Site Permits
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Anna Bradford, Deputy Director Division of New Reactor Licensing
RESOLUTION OF GENERIC SAFETY ISSUE 191
Strategic Appropriate Assessment of Spatial Plans
Ontario Industrial EPS Proposal IETA Insights for Ontario Stakeholders Clean Economy Alliance Webinar 15 March 2019 Toronto, Canada.
Introduction to HPMP.
Presentation transcript:

A Mid-Process Review Marilyn C. Kray Vice President, Exelon Generation President, NuStart Energy Development Regulatory Information Conference March 10, 2009

2 Overall Risks to New Plant Development NRC Licensing Process Review schedule impacts ASLB hearing process ITAAC closeout process Construction Final design completion schedule Labor cost and availability Commodities pricing Project management Financing Cost of plant Co-owners and partners Government incentives Market price forecasting Overall Public opinion Public policy Economy

3 First Wave Realities New process for all parties Content and level of detail still a challenge Timing of Applications Parallel review of multiple COL applications DCD + ESP = COLA formula not followed Ongoing design changes Concurrent DCD and COLA reviews “ Freeze point ” strategy Commercial influences Technology selections Economics and timing

4 Success Factors for First Wave Ongoing Communication NEI level DCWG level Industry/Staff interactions Flexibility Commitment to standardization DCD R-COLA S-COLA

5 First Wave Indicators to Come Overall Schedule development and adherence Draft SER with Open Items ASLB Hearing Process ITAAC implementation

6 Second Wave Potential Contingent on success of first wave Regulatory certainty Construction schedule adherence Ultimate cost compared to alternatives Safe operation of new and existing fleet Need for additional plants based on Climate change policy impacting alternatives Need for power Regulatory considerations Revisions to the DCDs Use of Early Site Permits