Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Audit – a laboratory perspective Simon Patton.

Slides:



Advertisements
Similar presentations
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS4 Process.
Advertisements

Internal Quality Audit Course
Anne Sholander, MT(ASCP), International QA/QC Coordinator, SMILE
Annual Management Review June Flowers, Flowers Chemical Labs Florida Society of Environmental Analysts - FSEA St. Petersburg, FL, May 2009.
Checking & Corrective Action
Environmental Management System Implementation
1. (c) Alan Rowley Associates Laboratory Accreditation Dr Alan G Rowley Quality Policy based on Quality Objectives Quality Management System Communicate.
CMGS Clinical ScientistTrainees Meeting 28 th November 2009 QUALITY ISSUES IQC, EQA, CPA Gareth Cross Nottingham Regional Molecular Genetics Service.
Formalised GT training in the Liverpool Lab Fiona Coyne Regional Molecular Genetics Laboratory Liverpool.
Targets for the individual and the organisation By Rachel, Claire, Kirsten and Natalie.
Improving Employability: Enhancement of Core Skills and Professionalism within the Pharmacy MPharm Degree Results and Perspective of a TQEF Project in.
STARLIMS Goes Live in 2009! Stuart Bayliss Regional Molecular Genetics Service St Mary’s Hospital, Manchester on behalf of the STARLIMS NHS Genetics Project.
Kenya AIDS Vaccine Initiative
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
Laboratory Accreditation – An Assessors Perspective Dr Jonathan berg City Hospital, Birmingham.
Implementing a Quality Management System the Salisbury Experience Tony Herbert.
The Changing Assessment Process Graham Fews West midlands Regional Genetics Laboratory UKAS Technical Assessor.
ISO 9001 : 2000.
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
Pathology Programme News 27 th March 2009 National Pathology Programme Board The Pathology Modernisation Project will formally conclude on 31 st March.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
1 Assessment: Audits. Assessment: Audits - Module 9 2 Learning Objectives At the end of this activity, you will be able to: Develop a process to prepare.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Monitoring, Review and Reporting Project Cycle Management A short training course in project cycle management for subdivisions of MFAR in Sri Lanka.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
The Molecular Diagnostics Research Laboratory University of Malaya Development and Implementation of a Quality System The Molecular Diagnostics Research.
Linking Objectives to Programs EPA Regions 9 & 10 and The Federal Network for Sustainability.
Photocopies Occasionally need uncontrolled copies
CPA is a UKAS company The Assessment Process 2014 Seminars.
What is the ACGS? What does the ACGS do? What are the benefits of joining the ACGS? Why should GTs join the ACGS?
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
Effectively applying ISO9001:2000 clauses 5 and 8
Unit 2: Managing the development of self and others Life Science and Chemical Science Professionals Higher Apprenticeships Unit 2 Managing the development.
Internal Auditing for Small Laboratories
HKAS Assessor Seminar 2006 Technical Assessor Role and Responsibility 28 Feb 2006 Dr Sidney Tam Consultant & Head Division of Clinical Biochemistry Queen.
Audit and Us Gill White Regional Cytogenetics Centre Bristol.
| Folie | Folie 2 ISO approach to GHG-inventory QA/QC UNFCCC Workshop on National Systems April 2005, Bonn Doris.
Overview of existing assessment schemes Rolf Bienert, John Lin.
Summary of Assessment Reports and Gap Analysis
Public Records Act 2005 Audit Tool Engagement Overview March 2009 Kate Jones, Senior Advisor, Government Recordkeeping Programme.
Laura Benson Genetic Technologist South East Scotland Cytogenetics Service Western General Hospital Edinburgh.
History of EuroGentest Started in January 2005 with European Funding Jean-Jacques Cassiman, Els Dequeker, Robert Elles, Dolores Ibarreta, Emilio Rodriguez-Cerezo.
AGQTP Project Pinewood Primary School 2009 Sandra McGregor & Sandra James.
Setting up Audit ‘The Liverpool Experience’ Alan Clark Quality Manager Merseyside & Cheshire Regional Genetics Laboratory Liverpool Women’s Hospital Liverpool.
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
The Government Recordkeeping Survey 2008 Natalie Dewson, Senior Advisor, Government Recordkeeping Programme, Archives New Zealand.
Internal environmental audit procedure Purpose: To ensure that the environmental management system is used and is effective Scope: The entire environmental.
Simon Patton (NGRL Manchester)‏ Joint Molecular & Cytogenetics Quality Management Training Day Birmingham, 23 rd Jan 2009 INTERNAL AUDIT TRAINING.
A QUALITY IMPROVEMENT TOOL
Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Implementing internal audit under the new CPA.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
به نام خدا.
Documentation Requirements for Hospital Accreditation -By Global Manager Group.
Clinical Utility of EQA Dr. Angela Amayo UON27/11/2008.
Introduce GLP/GCP into China Shixin XU, PhD, Prof. China IVDC.
Stepwise hospital accreditation certification: Can we learn from WHO-Afro Stepwise Laboratory Accreditation? 2 ND NATIONAL QUALITY IMPROVEMENT FORUM MLIMANI.
Audit Plan ELECTRONIC. PLANNING Auditor Independence Training and Proficiency Professional Care Audit program Working Paper Documentation.
National Sensory Impairment Partnership/Learning Event
Internal Auditor Training
Safeguarding Annual Review
UKAS experience Julita Jaudzemaite 2016.
Approach to implementation of ‘Broadening the Foundation Programme’
4.5 Checking and Corrective Action Monitoring and Measurement
HCPC AUDIT How to prepare
Veterinary Technician or Assistant
Survey Readiness RIDEOUT HEALTH Kimberly Black
HCPC AUDIT How to prepare
Specialty Heat Treating, Inc. Internal Auditor Training
Joint Commissioning Strategy for Learning Disabilities 2019 – 2024 LeDeR Learning Disability Review of Mortality Learning for Change Jan Gates Tracey.
Presentation transcript:

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Audit – a laboratory perspective Simon Patton National Genetics Reference Laboratory (Manchester)

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Reference lab DoH funding - National Genetics Reference Laboratory status in 2002DoH funding - National Genetics Reference Laboratory status in 2002 Part of our NGRL remit = quality systems for genetic testingPart of our NGRL remit = quality systems for genetic testing –EQA –Reference materials –Accreditation to provide assistance to genetics laboratories in implementing new CPA accreditation standardsto provide assistance to genetics laboratories in implementing new CPA accreditation standards Info can be found on the NGRL websiteInfo can be found on the NGRL website – “How can we help you?”“How can we help you?” –Workshop on implementing audit

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 About Us NGRL (Manchester)NGRL (Manchester) –Molecular Genetics –Cytogenetics –Clinical Genetics Molecular GeneticsMolecular Genetics –36 staff –3500 samples a year –Last accredited May 2002 –Next inspection due Spring 2005 CytogeneticsCytogenetics

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Meeting the challenges of the new standards Quality manager in postQuality manager in post –½ time position –shared between DNA and Cyto Document controlDocument control –All documents (260+) on e.document archive since 2001 –Moved over to Q-Pulse in 2003 –Reviewed at least annually

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Meeting the challenges of the new standards Q-PulseQ-Pulse –Up and running for Document control –Currently setting up for: AuditsAudits Monitoring non-conformancesMonitoring non-conformances Recording corrective actionsRecording corrective actions Equipment maintenance/inventoryEquipment maintenance/inventory Training registerTraining register

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Our approach to audit Decided to trial vertical audit firstDecided to trial vertical audit first –We felt it was the easiest to implement first Use vertical audit to flag up areas that need further investigation using:Use vertical audit to flag up areas that need further investigation using: –Horizontal audit –Witness / examination audit

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Progress!? Done 5 vertical auditsDone 5 vertical audits –3 using a slightly modified version of CPA form Decided to do these full vertical audits every 3 rd auditDecided to do these full vertical audits every 3 rd audit –2 using a mini-vertical audit – concentrates on the laboratory pre-examination, examination and post- examination processes These are done following a full vertical auditThese are done following a full vertical audit

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Progress!? No horizontal or examination audits have been done yet!No horizontal or examination audits have been done yet! –Vertical audits have identified several areas which we will be targeting shortly Most of the paperwork has been doneMost of the paperwork has been done Still to use Q-Pulse to schedule audits and record non-conformanciesStill to use Q-Pulse to schedule audits and record non-conformancies

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 The auditors… Working group of 6 staff to trial auditsWorking group of 6 staff to trial audits Aim to include all staff in the audit processAim to include all staff in the audit process –Scientists, technicians and clerical staff –“sense of ownership” –Avoid top-down approach –Rotate on an annual basis Identify training course for first years auditors, thenIdentify training course for first years auditors, then –Established auditors to “train” new auditors

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Lessons learnt - Pros Already identified weaknesses, problems and non-conformanceAlready identified weaknesses, problems and non-conformance –e.g., equipment maintenance Has lead to improvements in proceduresHas lead to improvements in procedures –e.g., modifications to specimen reception procedures All laboratory staff will hopefully have a better sense of ownership of their workAll laboratory staff will hopefully have a better sense of ownership of their work

Workshop on implementing internal audit - NGRL (Manchester), St Mary’s Hospital, Manchester October 2003 Lessons learnt - Cons Slow process to:Slow process to: –implement it –For all staff to understand the benefits of audit Formal training is important:Formal training is important: –Asking the right question –Not to appear judgemental TIME!!TIME!! Need to be careful that it is not seen as another paper wasting exercise!Need to be careful that it is not seen as another paper wasting exercise! Care needed to ensure you don’t just target the things you know / do best.Care needed to ensure you don’t just target the things you know / do best.