National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.

Slides:



Advertisements
Similar presentations
Architectural Services Department HKSAR Laboratory Design for Secondary Schools.
Advertisements

State Fire Marshal Question and Answer Session with the Louisiana Automatic Fire Alarm Association March 19, 1999.
Aspirated Smoke Detection
Clean room administrative committee Meeting TUMS Murthy Jan 29 , 2013
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
The Life Safety Surveyor Facility Tour
Industrial Heating & Piping Co. Madawaska School Department Energy upgrades to the heating system at the Madawaska High and Middle School.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS COLLEGE OF ENVIRONMENTAL DESIGN Dhahran, Saudi Arabia THERMAL AND ECONOMIC PERFORMANCE OF INSULATION FOR.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 30, 2013 Clean room administrative committee.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
Student Accommodation Centre Private Housing Talk 7 March 2011.
A solution to ATM Energy and Security Management
Physical Security Chapter 9.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Prabhakara Rao Jan 6, 2015 Cleanroom Admin Committee Meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
Fire Detection Presentation
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Cleanroom Admin Committee Meeting Prabhakara Rao April 28,
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Submitted By Facility Management Team
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Laser- based smoke detectors
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Session VI Emergency Procedures Utility Control Chemical Spills Chemical Exposure Fire Extinguisher Basics -Will be covered during the face-to-face meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Dec 2, 2013 Cleanroom administrative committee.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 28 May 2014 Cleanroom administrative committee.
Monthly Management Report Submitted By Facility Management Team
First Glimpse at Medicare 2011 Hospice Utilization 11/3/13 Hospice Analytics
NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012.
LST SAFETY INSTALLATION READINESS REVIEW 5/5/2004 FRANK O’NEILL (SLAC)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 27, 2013 Clean room administrative committee.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Sept 25, 2013 Clean room administrative committee.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
FIRE SERVICES AT DATA CENTRE
Micro and Nano Characterization Facility Girish Kunte October 28 th 2014.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
Fire Prevention Facilities of Building 1 Civil Engineering Department Safety Promotion Project.
Hydrogen Fuel And its place in our future. Some Chemistry 2 H 2 + O 2 2 H 2 O kJ.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 25 Feb 2014 Cleanroom administrative committee.
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
Solvent machine cleaning - Risk analysis 1/22 L.Bardo - PH-CMX 04 December 2015.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
Monthly Management Report September Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Jun2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
CARBON MONOXIDE.  Carbon Monoxide (CO) is: Colorless Odorless Tasteless  Each year many people die from CO poisoning.  CO can act on the body quickly.
PHENIX Smoke Alarms Incident, 27-May-2016 Mickey Chiu, for the PHENIX Operations Crew.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Jan 8, 2013 Clean room administrative committee.
Fire Protection Systems for Facility Managers Michael Salazar NICET Level 2.
Raising Concerns over the Storage and Distribution of Packaged Drinking Water in Vijayawada.
FIRE PROTECTION & SECURITY in ELI Beamlines
LAPD/IISC Seed Money project
Team NOx Dallin Searle Angel Rivera Eric Broncheau
RWTCS Steering Commitee
Enclosed Parking Ventilation 1 EK Engineering (India) CO/NO2 detection, Fan Control and automation System E: Mobile:
WELCOME TO
Electrical Engineering Courses. About Us Hyderabad Institute of Electrical Engineering provides Best Electrical Engineering Course Training. We trained.
Job Oriented Courses after Electrical Engineering Job Oriented Courses after Electrical Engineering.
TYPE IN CENTRE NAME LEVEL 1 HEALTH & SAFETY TYPE IN NAME
Architectural Engineering, The Pennsylvania State University
ADD YOUR LOGO HERE TYPE IN CENTRE NAME LEVEL 1 HEALTH & SAFETY
TYPE IN CENTRE NAME LEVEL 1 HEALTH & SAFETY TYPE IN NAME
The Survival Plan.
Data science course in Bangalore.
Data Analytics course.
Now Buy Best External Door Hardware from Doorhardware
Presentation transcript:

National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting

TUMS MURTHY Vendors contacted for quote – Ceasefire, – Shobha Engg – JS Enterprises, – Firepro – Team Engg – Nanoclean Only Ceasefire has quoted partially for wireless detectors and water mist extinguisher – To ensure the wireless frequency does not interfere with equipment Aug 26, 2014 Cleanroom Admin Commitee Meeting Fire Safety

TUMS MURTHY Yet to receive quotes for additional VESDA aspirators and analytical cell Proposal to be considered – Shift VESDA panels from Utility building to cleanroom – Install normal smoke detectors in Electrical panel room and chemical storage rooms Aug 26, 2014 Cleanroom Admin Commitee Meeting VESDA

TUMS MURTHY 61 on 1 st day and 46 on 2 nd day attended the orientation course – 21 from other departments attended Course well received. Favorable feedback Main suggestions – Videos to be included – Cleanroom visit – Longer duration and more details of process Aug 26, 2014 Cleanroom Admin Commitee Meeting Orientation course

TUMS MURTHY Tunnel closed on both ends to reduce fresh air leakage inside the tunnel – Flow measurements to be repeated – Sensors to be calibrated Reconfigured perforated tiles and flow measurements done with FFUs off Testing of current smoke detector effectiveness on hold waiting for cleanroom compatible smoke generator Aug 26, 2014 Cleanroom Admin Commitee Meeting Facilities works completed

TUMS MURTHY Aug 26, 2014 Cleanroom Admin Commitee Meeting Thank You