LIGO-G030238-00-M Contract Plans and Strategy Irena Petrac Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference.

Slides:



Advertisements
Similar presentations
NIGB NATIONAL INFORMATION GOVERNANCE BOARD FOR HEALTH AND SOCIAL CARE Moving Forward 2013 Background & Context: Key considerations Point / purpose of the.
Advertisements

RFP, Proposal and Contract IF – UNS. 10 steps in Procurement Process 1.An RFP is released 2.Proposal Meetings and Conferences 3.Forming a Proposal Teams.
LIGO-G v2 Form F v1 Advanced LIGO1 SCATTERED LIGHT CONTROL in ADVANCED LIGO Michael Smith LIGO Laboratory Caltech, Pasadena, CA.
GPA Renewable Energy Resource for Guam Power Authority
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
UPP - Understanding Privatization Policy Management and organizational issues Luca Farinola 24/02/2006.
Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M Advanced LIGO1 Finite Element Modeling Requirements Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication.
LIGO-G M Advanced LIGO1 Mass Limits & Balancing Dennis Coyne Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s.
Financial Assistance Workshop Contract versus Grant.
The BIM Project Execution Planning Procedure
Automated Contract Administration Project PIP Level II Presentation by Lisa A. Bowden August 24, 1999.
The Lean Sourcing Process
Policy 7003 Review BCPS Facilities Task Force – Policy Subcommittee Report July 16, 2015.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Review of IEA Wind Task 23 OC3 Project Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by the Alliance for.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT Alan Chvotkin Senior Vice President and Counsel Professional Services Council DEFENSE ACQUISITION.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
Ontario Sport Tourism Action Plan. Phase I Background Development April 3, 2003 (Ottawa) Presentations by Municipalities and Tourism Organizations regarding.
GDS Gaming Device Standards Event, Data, Location.
Project Life Cycle.
E. Talero IFMIS Workshop - Nairobi 1 IFMIS Implementation Workshop Effective IFMIS Procurement and Management of Consultants Eduardo Talero Senior.
1 Cloud Computing and the Australian Government Glenn Archer First Assistant Secretary Australian Government Information Management Office May 2011.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
6/5/2016 PEO Aircraft Carriers Aerosol Can Evacuation & Compaction Unit SBIR Topic N
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
LIGO-G M Organization and Budget Gary Sanders NSF Operations Review Caltech, February 26, 2001.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
1 SEC Distribution Field Force Overview Distribution Contractors Day with Saudi Electricity Company October 28 th, 2015.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Meteorological Monitoring System ENSCO, Inc., Springfield Virginia Innovation The Meteorological Monitoring System (MMS) provides real-time acquisition.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation
LIGO-G M Advanced LIGO Cost, Schedule and Management Gary H Sanders NSF Review of Advanced LIGO Caltech, June 11, 2003.
Innovation... Discovery... Education… Achievement Enhancing the CPMT Society Web Site May 31, 2003 Tim Adams.
Copyright 2006 by Ironsclad Solutions, Inc. All rights reserved April 28, 2006 The Business Capture Process J. Jeffrey Irons.
Small Business Innovation Research Program (SBIR) Presented by Sharina Broughton.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
Net-Centric Software and Systems I/UCRC A Framework for QoS and Power Management for Mobile Devices in Service Clouds Project Lead: I-Ling Yen, Farokh.
What has been accomplished at the end of MSD 1 & 2?
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Construction & property consultants A Journey through EXTRA CARE Breakout Session – Procurement – Best Practice and Innovations Chris Bovis, Douglas BeckwithApril.
Procurement & Strategic Sourcing
Purchasing Decisions And Business Strategy
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT
Update from the Faster Payments Task Force
APQP Five Phase Process
Boulder Junction Town Road Improvement Project
Sourcing Event Tool Kit Multiline Sourcing, Market Baskets and Bundles
Qualification Criteria and Available Tender Capacity
Joint Parking Task Force Update Procurement & Strategic Sourcing
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Quality Management Systems – Requirements
Request for Proposal and Specifications for
SEC Distribution Field Force Overview
The Lean Sourcing Process
Request for Proposal and Specifications for
SBIR/STTR Program Award Structure SBIR/STTR Program Award Structure
P25 Digital Statewide Public Safety Radio System Initiation Department of Information Technology Estevan Lujan, Acting Cabinet Secretary Michael Rohrbacher,
Management of the Advanced LIGO Seismic Isolation System Development
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Omnibus IV Contracting Strategy Michael D’Alessandro
Post-Award Conference / Kick-Off Meeting
Second Avenue Subway Project Execution Strategy
Presentation transcript:

LIGO-G M Contract Plans and Strategy Irena Petrac Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April 29, 2003

LIGO-G M LIGO Laboratory2 Contract Plans and Strategy Phased Implementation Phase I: Value Engineering Period: Two months Phase II: Design development and fabrication of prototypes Period: Ten months Phase III: Production Period: Fourteen months

LIGO-G M LIGO Laboratory3 Contract Plans and Strategy Awards Phase I Number of awards: Up to three separate awards Deliverables: Value Engineering Report Phase II Number of awards: Up to two separate awards In the event of two separate awards, one will be for a HAM-type and one for a BSC-type mechanical structure Deliverables: Structure designs and prototypes; FFP/production Phase III: Up to two separate awards Number of awards: Up to two separate awards In the event of two separate awards, one will be for a HAM-type and one for a BSC-type mechanical structure Deliverables: Production units, two to three sets of five of each type

LIGO-G M LIGO Laboratory4 Contract Plans and Strategy Hiatus Between Phases I and II, one month hiatus Phase I inputs may be consolidated into the baseline design enhancements Design requirements may be updated Phase I contractors may update initial Phase II offers, as appropriate Between Phase II and Phase III, up to twelve months hiatus Design verification and performance demonstration program at MIT Final design requirements may be updated Phase II contractors may update initial FFP offers for Phase III, as appropriate

LIGO-G M LIGO Laboratory5 Contract Plans and Strategy Competition Competition will be preserved through Phase III Cross bidding Designer of one type of a mechanical structure will be given opportunity to compete for the follow-on production awards for both structure types Phase III competition may be opened to new contractors

LIGO-G M LIGO Laboratory6 Contract Plans and Strategy Selection Criteria (Listed in order of decreasing importance) Phase I Capability and qualifications for design & fabrication tasks Recent experience with similar products, projects and devices Phase II Capability and qualifications for design & fabrication tasks Price Value engineering Phase III: Price Capability and qualifications for design & fabrication tasks

LIGO-G M LIGO Laboratory7 Contract Plans and Strategy Ownership All output on this program becomes the property of Caltech and NSF upon delivery Value engineering ideas and any design feature developed in Phase II may be incorporated into subsequent awards to other contractors Caltech reserves the right to open Phase III competition to new sources