October 29, 2015 1. Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Electric System Reliability in a Post SONGS World.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Balancing an Over-Supply of Generation October 12, 2010 Public Meeting.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Current Northwest Energy Issues A BPA Customer Perspective Dan James PNWA Summer Meeting June 23, 2014.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Federal Columbia River Power System Operations Planning.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Novel Strategies to Reduce Variation of Wind and Solar Generation at its Source Stephen Rose Eric Hittinger.
Ludington Pumped Storage Plant and Wind Power Operational Considerations David Lapinski Consumers Energy Company June 16, 2009.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Introduction to Bonneville Power Administration
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Load Management Strategies to Support Grid Integration of Intermittent Renewable Resources Paulina Jaramillo and Lester Lave.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
BPA Wind Integration Services Elliot Mainzer Manager, PBL Pricing Desk Bonneville Power Administration Wind Power Workshop Northwest Power & Conservation.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
Generation Inputs Workshop July 24, BPA Balancing Authority Reliability Tool.
Hydro Power 102. Hydroelectric Models in the Northwest.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Navigating the Challenges Nancy Saracino Vice President, General Counsel & Chief Administrative Officer California Independent System Operator Independent.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
City of Port Angeles Strategic Planning Workshop for Power Supply June 7, 2011 Scott Corwin Executive Director Public Power Council.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
John Norden, Manager, Renewable Resource Integration ISO New England Inc NASUCA Mid-Year Meeting June 30, 2009 Roadmap to Renewable Integration in.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N June 2011 Non-Treaty Storage Agreement non-Binding Terms for Storage Accounts.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Regional System Operator Issues Analysis Ron Lehr Western Clean Energy Advocates January 7, 2016.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
Understanding Value of Short-Duration Resources CPUC RA Workshop March 5, 2016.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
Renewable Energy Challenges: System Stability
Erik Ela, Eamonn Lannoye, Bob Entriken, Aidan Tuohy
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
GENESYS Redevelopment Strawman Proposal
Overview of New Control Room Desk
Grid Integration of Intermittent Resources
Flexible Forward Contracts for Renewable Energy Generators
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
MRES Resource Operations in SPP
Key Findings and Resource Strategy
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
PacifiCorp-CAISO-NVE EIM Initiative Overview
Forecasting and Operations CAISO Case
Technical Committee Meeting January 27, 2012
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

October 29,

Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job functions Policy support The Role of Power Marketing at BPA Energy needed to meet FCRPS operational objectives The role of flexibility/uncertainty Flexibility and Uncertainty Definitions Growing importance Relationship between flexibility and uncertainty 2

Short-Term Planning is responsible for planning and implementing processes related to short-term planning of the FCRPS. Coordinates prudent operational plans and outages for the FCRPS with the Corps and Bureau Performs analysis which assesses flexibility for power marketing while meeting operational objectives from the current day through the end of the planning horizon Coordinates Non-Treaty Storage Agreement Operations Implements procedures required for the Pacific Northwest Coordination Agreement Develops procedures for providing balancing reserves for intermittent generation and transmission system limitations Provides FCRPS operational perspectives for policy decisions 3

Hydro Duty Scheduling is responsible for the 7x24 operation of the FCRPS. Sets the hourly hydraulic operation of the FCRPS to meet power and non-power use of the system including ESA requirements, flood control and reliability needs. Coordinate hourly FCRPS generation plan through Transmission Dispatch and spill plans with Corps and Bureau Dams. Performs analysis which assesses flexibility for power marketing while meeting operational objectives for the current day Ensures that sufficient capacity is set aside to provide balancing reserves for intermittent generation and contingency reserves for forced outages Implements the Slice power sales contract Provides FCRPS operational perspectives for policy decisions 4

In order to meet the hydraulic objectives of the FCRPS, energy is bought and sold Long Term: 20-year contracts Some are simple and predictable (flat, load-following) Some are very complex and uncertain (Slice) Mid Term: within the fiscal year Term markets generally transact in monthly HLH/LLH blocks Critical tool for managing uncertainty in volume forecasts Short-Term within the month Balance of month Day-Ahead market – generally in HLH/LLH blocks, but California ISO market allows for hourly bids Real Time market – hourly, but sub-hourly markets are evolving Critical tool for managing uncertainty in loads and streamflows 5

Hydro power has a significant role in integrating wind resources into the region Hydro power is a dispatchable, low cost, CO2-free resource used to “balance” load and the intermittent output of wind resources in real-time Flexibility set aside to manage within hour variation in load and variable generation is called “Balancing Reserves” Regulation: responds instantly Following: meets within-hour trends Imbalance: responds to schedule error (largest component) Balancing Reserves are set aside to either increase or decrease FCRPS generation Incremental (INC) reserves: capacity that is reserved for when wind generation falls below the schedule or load increases within an hour Decremental (DEC) reserves: generation above minimum that is reserved for when wind generation is above the schedule or load drops within an hour Currently, the FCRPS is providing 900 MW of INC reserves and 900 MW of DEC reserves Aggregating balancing reserve needs of the wind fleet along with load in the balancing authority is critical in keeping the reserve amounts as low as possible

With about 120 generating units that range in size from 40 MW to 825 MW on the six main projects where reserves are carried, the FCRPS can provide a significant amount of Balancing Reserves Units can ramp very quickly – over 1000 MW up or down within an hour However, there are times when there is limited within hour flexibility due to the need to meet “High Priority” objectives which may result in reserves being reduced or implementing the Overgeneration Management Protocol Deployment of balancing reserves that results in energy storage or use of energy over time may limited the amount of FCRPS flexibility available to provide reserves. Impacts to the FCRPS include efficiency losses, unit cycling losses, spill and energy shift from peak load hours to light load hours Costs incurred as a result of these impacts are recovered by rates paid for by the generator owners and Preference Power Customers based on cost causation The allocation of cost is driven by how the inherent uncertainty in the individual balancing needs of load and generation affects the aggregated balancing signal Intent is for Preference Power Customers to incur costs only related balancing loads and not to incur costs related to integrating resources owned by other parties

The ability of resources to respond to changing conditions  Load  Fuel supply (i.e. streamflow)  Resource availability  Balancing reserves  Hydro “balances” variable generation More than just “capacity” 8

Why is Flexibility Important? Growing need for the integration of variable resources: Reliability Potential to share flexibility between areas Meet FCRPS operational objectives Federal hydro at limit New challenges on the horizon New wind and solar will change CAISO net load shape (load minus wind & solar) 9

BPA Uncertainty and Flexibility Uncertainty Loads: 20 year contracts for power customers; Slice Market Depth: Economic cycles result in periods where there is very thin reserve margin in the market = little ability to absorb mistakes New Resources additions: Expect more variable resources which will require additional regulation and imbalance FCRPS Operations: New BiOp requirements may reduce FCRPS flexibility Non-Federal reservoir operations: Canada (new Treaty?) Streamflows: Long term impact of climate change? Flexibility It is likely that more operational constraints will exist in the future Aging system = more extended forced outages are possible New flexible resources New market constructs may provide greater access to flexibility (NWPP MC Initiatives) The Balance It is possible that future will have more uncertainty with less flexibility New sources of flexibility will be needed that can manage uncertainty 10

Planning and Operations Importance of non-power objectives Multi-Agency coordination with Corps, Bureau and NOAA Complex analytical problem The Role of Power Marketing at BPA BPA needs to buy/sell energy to meet FCRPS operational objectives Mid-term and short-term energy markets are critical tools in managing uncertainty Assessment of uncertainty and flexibility is critical in planning and marketing at BPA Flexibility and Uncertainty Flexibility is needed to deal with uncertainty & variability Demand for flexibility is growing Flexibility of the FCRPS is limited with a risk that it could be decreasing 11