Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”

Slides:



Advertisements
Similar presentations
1 Ports and Harbors – Transitions and Challenges Ms. Doris J. Bautch Commissioner, U.S. Section of PIANC U.S. Maritime Administration Presented at the.
Advertisements

ZÁHONY: STRATEGIC POSITION IN THE NEW EUROPE. MAJOR TRANSPORT ROUTES THROUGH ZÁHONY LOCATED ON A MAJOR TRANSPORT CORRIDOR (No.5 Pan- European corridor)
World Bank Port Reform Toolkit Module 2 The Evolution of Ports in a Competitive World.
Lumsden Point Development
NextEnd. Preparation of Business Plan for Setting up Enterprise Business Plan.. The business plan is a written document prepared by the entrepreneur that.
НАЦІОНАЛЬНИЙ БАНК УКРАЇНИ Transition to BPM6: Case of Ukraine National Bank of Ukraine National Bank of Ukraine.
DECREE OF THE PRESIDENT OF UZBEKISTAN «ON ADDITIONAL MEASURES TO STIMULATE ATTRACTING FOREIGN DIRECT INVESTMENTS» ON APRIL 10, 2012 #UP-4434 Ministry for.
Strategic development of inland waterway infrastructure
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
“Community Based Approach to Local Development ”Project: Strategic context, nature, objectives and key characteristics.
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
A Typical Business Plan
BEARS LOGISTIC CENTER Kyiv 2007 Project «Building of network of specialized logistic centers for agricultural products storage»
USAID/Bulgaria Private Sector Programs. Strategic Objective Economic Growth and Increased Prosperity Improved Business Climate Jobs Created through Strengthened.
Furniture shield production in Sharja municipal district of the Kostroma region.
INVESTMENT PROJECT PROPOSAL Construction of the railway line Marculesti-Soroca, and the bridge over the Nistru river Construction of the railway line Marculesti-Soroca,
TRACECA PROJECT EVALUATION
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Association of International Road Carriers of the Republic of Tajikistan "ABBAT” Dushanbe – 2014.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
Development Projects Construction of residential real estate in Kiev, Ukraine.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Building of multifunctional geothermal rehabilitation town InterMedicalEcoCity Project goal: «InterMedicalEcoCity» - is an International Medical Rehabilitation.
ASIA-EUROPE MEETING (ASEM) ASEM Symposium on Eurasia Transport and Logistics Network M. SOKOLOV MINISTER OF TRANSPORT OF THE RUSSIAN FEDERATION.
1. General characteristics of the changes 2. Legal and macro-economic aspects of changes; procedural issues 3. Changes in the “incomes” section of the.
Construction of tourist complex and yacht club (Stage I) in Kherson. Improvement of recreational and coastal urban beach area in Hydropark (Stage 2 ).
TRACECA PROJECT «Development of the multi-modal complex in SE “SCPI” using the 3 rd basin of the Sukhoy estuary»
"State-Business Cooperation in the RK. Infrastructure Construction"
Michael R. Christensen, P.E. Deputy Executive Director October 23, 2009 AASHTO Special Committee on Intermodal Transportation and Economic Expansion: Freight.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
Presentation of investment projects of Kherson Sea Port.
Investment: significant one-shot expenditures expecting long- term stream of benefits in the future Economic Value Added: difference between return on.
Ukraine: Eastern Europe’s Greatest Market Brussels, 27 June, 2007.
Dr Chris Whitaker Chairman, James Point Pty Ltd SW Corridor Strategic Planning afternoon Thursday January 29th 2009 James Point Port at Kwinana: “Development.
-1- Policy for Effective Management of State-owned Enterprises in Latvia 5th-6th September 2011 Ljubljana Mr. Juris Puce State Secretary.
Investment Project Construction of corn transloading terminal in the port Yuzhny.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
Project “Belkomur” The complex industrial and infrastructural development program of Komi Republic, Perm Territory and Arkhangelsk area.
«UKRAINIAN SEA PORTS AUTHORITY» SKADOVSK SEA PORT AUTHORITY
Deepwater district “North” Of Arkhangelsk sea-port The project has been approved by the Federal Agency of Sea and river transport of the Ministry of transport.
Ministry of Economy, Energy and Tourism 1 OP Competitiveness Progress of Implementation 2010.
Project # 1 Rikoti-Zestaponi Highway May, Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
Deepwater district “North” Of Arkhangelsk sea-port The project has been approved by the Federal Agency of Sea and river transport of the Ministry of transport.
AGRICULTURE. AGRO HOLDING «KHLIBODAR». KEY FACTS: Agro holding “Khlibodar” is a vertically integrated structure, which includes holding company LLCKhlibodar,
COMPLEX DEVELOPMENT OF UST-LUGA SEAPORT AND ADJACENT TERRITORY Svetlana Makarova, Srategy and Development Director Marina Lebedeva, Environmental Projects.
MESHCHOVSK FISH FARM, OOO INVESTMENT PROJECT FOR CISCO FISH GROWING 7, Gertsena Street, Meshchovsk Town, Kaluga Region,
Reconstruction of coastal recreational parkland in Nova Kakhovka Project idea: landscaping of the city park along the Dnipro River (length is 1 km), development.
Dr. Mohamed Riyazh Khan DoMS
Energy Strategy of Russia for the Year 2030 Oil & Gas Outlook Russia 2009 December, 8, 2009 Moscow Alexey Gromov PhD in Economic Geography Deputy General.
Common Legal Basis for Transit Transportation The European Union ’ s Tacis TRACECA programme for Armenia, Azerbaijan, Bulgaria, Georgia, Kazakhstan, Kyrgyzstan,
INTERNATIONAL SEMINAR «INTERMODAL TRANSPORT BETWEEN EUROPE AND ASIA: OPPORTUNITIES AND CHALLENGES» SPEECH OF THE DEPUTY MINISTER OF TRANSPORT AND COMMUNICATION.
การบริหารการเงิน และงบประมาณโครงการ Financial and Budget Management for Project Thanapat Pisutsin 1.
SUGHD free economic zone development projects.
Main Macroeconomic Data of Georgia GDP In 2014 GDP growth rate was 4.6% (Nominal GDP USD 16.5 bln.). GDP Structure: 17.5% - Trade, 16.9% - Industry, 10.4%
Serving the National Economy. There are nine main commercial and industrial ports in Saudi Arabia with a total of 193 berths. Dammam Diba Jeddah Jizan.
Strategy of economic and social development of St. Petersburg until 2030 Committee for Economic Policy and Strategic Planning of St. Petersburg
International conference "Greening Motorway of the Sea" April 2005 in Stockholm “Environmental aspects of Klaipeda seaport development strategy”
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
UZNEFTGAZDOBICHA JOINT-STOCK COMPANY «Asakatransneft» Joint-stock company.
Kishinev 2016 MINISTRY OF FINANCE OF THE REPUBLIC OF TAJIKISTAN.
PORT BULGARIA WEST.
«Ukrainian Sea Ports Authority»
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
«We will start carrying out promising projects such as the formation of international transportation corridors, including those from the Baltic via the.
The current situation of intermodal transport in Serbia
Port Infrastructure Development for Ensuring Sustainability
TRACECA PROJECT EVALUATION
12thJune, 2016 Science City, Kolkata.
Terminal «Factor» Port of Ust-Luga
Presentation transcript:

Infrastructure and capacity development of the State Enterprise “Sea Trade Port of “Yuzhny”

46  3602  N 31  0125  Е

Increase of the port’s and Ukraine export-import and transit potential Provide services for the local and transit cargoes of the TRACECA country- members Increase of the port’s turnover, development of its infrastructure Increase of the port’s revenues and, as a result, increase in payments to the budget and other funds Creation of new jobs, improvement of working conditions Development of the port as the most perspective in Ukraine and increase of its competitiveness Project Objectives

Deepening of the port SE «STP «Yuzhny» to possible 19,0-20,0 m water depth Reconstruction of overloading complex of general cargoes for receiving of import bulk cargoes located on the berths NN 8, 9 with the capacity up to 10 million tons per year Construction of a specialized overloading complex of export bulk cargoes located on the deep-water berths NN 11, 12, 12a with the capacity of 15 million tons per year Project Description

The project implementation will ensure further development of external infrastructure of rail and automobile routs Ukraine occupies key positions in providing work of the following International Transport Corridors: ITC «Baltic –Black sea» ITC №9 «Cretan» ITC «TRACECA» and others Development of this project will allow the port to take a leading position in the Black Sea region, serving local and transit flows of TRACECA member- countries and many others SE «STP «Yuzhny» occupies a strategic position in international transcontinental transport corridors, and it is one of the most perspective ports providing interests of Ukraine as a transit state Regional Criteria

Dynamics of the forecast port’s turnover, Mt

The project provides: Deepening of the sea Approach Harbour Channel to 19,0-20,0 m water depth; Deepening of the port waters and active berths №№ 5,6,8,9 to possibly 19,0 м water depth Total amount of dredging works – 10,3 mln. м3 Technical Criteria Stage 1: creation of a deepwater port in the harbour of the SE “STP “Yuzhny”

Reconstruction of runways for installation of specialized vessel unloading facilities Construction of specialized technological overloading cargo complex for the unloading of bulk cargoes of vessels with a capacity of 10 million tons per year Construction of new open storage areas for bulk storage with a capacity of about 650 thousand m3 of cargoes 8 9 Main stages of reconstruction Stage 2: reconstruction of the overloading complex of general cargoes for import bulk cargoes (berths NN 8, 9)

The main stages of custruction: Construction of berths NN 11, 12, 12a with total length of 950 l.m. linear meters Construction of technological overloading cargo complex for unloading of export bulk cargoes with the capacity to 15 million tons per year Construction of new open storage areas for bulk storage capacity of about 950 thousand m3 Construction of the station of unloading wagons with capacity of 2 x 24 items per hour а Stage 3: construction of overloading cargo complex for export bulk cargoes (berths NN 11, 12, 12a)

Investment expenses, U.S. $ Estimated Project Cost 628,2 mln. U.S. $ Calculated income 180,9 mln. U.S. $ Calculated profit 80,0 mln. U.S. $ p.a. Payback period8 years Internal Rate of Return (IRR) 12 % Main items Timing Costs BeginningEnd Creation of a deepwater port in the waters of the SE «STP «Yuzhny» , 3 Reconstruction of the overloading general cargo complex for import bulk cargoes on berths NN 8, ,0 Construction of specialized overloading cargo complex for export bulk cargoes on the deep-water berths NN 11, 12, 12a ,9 Financial analysis

Estimated economic indicators of the project, mln. U.S. $ Indicators Years Incomes --19,04180,9 Costs --7,9101,4 Net profit --11,179,5 Capital investments 210,9228,7188,6- Project implementation period years. Economic analysis of the project is based on actual data for 2010 and forecasts for the period until Economic analysis

«Transport Strategy of Ukraine for the period of up to 2020» has been adopted by the Decree of the Cabinet of Ministers of Ukraine N 2174 from and is strategic document about further development and operation of the transport sector of Ukraine Program of long-term development of the SE «МТP «Yuzhny» approved by Decree of the Ministry of Transport and Communications of Ukraine № 623 from , provides further development of transshipment facilities of the ports, their infrastructure, including - creation of a deepwater port Adoption of new legal and regulatory acts of Ukraine, such as the Law «On sea ports of Ukraine», will provide additional new capabilities for port’s intensive development Political Criteria «Strategy of seaport development of Ukraine till 2015» approved by the Decree of the Cabinet of Ministers of Ukraine № 1051 from , and provides further increase of sea potential of Ukraine

During the execution of a preliminary assessment of environmental impact and determining the measures of project implementation significant risks to the ecological system were not found Impact on the environment