1 «UKRAINIAN SEA PORTS AUTHORITY» SKADOVSK SEA PORT AUTHORITY
STATE ENTERPRISE «UKRAINIAN SEA PORTS AUTHORITY» SKADOVSK SEA PORT AUTHORITY SKADOVSK’S SEA PORT

2 CHARACTERISTIC OF THE PORT Length / depth at the wharf, m
The total area of the port: 11,6525 hа. The total water area square kilometers, including inside water area - 0,028 sq km, the depth of outside roadstead - 8,0m. The total length of wharf’s front m. Length of crane runways m. Skadovsk’s sea port is a trough, the entrance to which is fenced in eastern dam. Its depth in the middle is 6.0 m. The port has a developed infrastructure, energy supply system, convenient sea approaches and can accommodate vessels with a draft of up to 6 meters and capacity up to 5 thousand tons. The port has protected from the wind and waves of all directions. Handling vessels is provided round-the-clock. The port has 2 car driveways. The port has 5 wharfs (different ages and designs). Name of the object Length / depth at the wharf, m The wharf number 1 294/4,5 The wharf number 2 87,6/6,0 The wharf number 3 156,0/4,5 The wharf number 4 (sector 1) 25/6,0 The wharf number 4 (sector 2) 130/- The wharf number 3 subdivision Khorly 110/3,5 SERVICES - Customs station Bank departments                         Phytosanitary Inspectorate Environmental Inspectorate                              - Brokerage firms (agency company ) Border Post

3 FS “Stoykiy” - the ship is used as a fire boat to extinguish fires in the port.
m\v “Oil garbage collector – 16” – used to clean the water area of the port from garbage and oil spills. Tugboat “Engineer Kapustin” – line tugboat is used in mooring, towing and berthing operations in the port. Tugboat “Skadovsk” - line tow boat is used in mooring operations, towing and berthing operations in the port. SHIP OF THE PORT FLEET

4 LOADING TECHNICS 2 5/6 1 10/20 Name Carrying capacity, tons
The Amount, units The portal crane "Ganz" 5/6 2 The portal crane "Albatross" 10/20 1

5 Ferry communication Skadovsk (Ukraine) - Zonguldak (Turkey)
MAIN ACTIVITIES Ferry communication Skadovsk (Ukraine) Zonguldak (Turkey)

6 MAIN ACTIVITIES Overloading the wood, building and other materials from vehicles on ships and back

7 Bulk handling (grain) of cargoes carried out by means
MAIN ACTIVITIES Bulk handling (grain) of cargoes carried out by means PJSC "Skadovsk GRE"

8 Extraction and processing of sea sand in the subdivision Khorly
MAIN ACTIVITIES Extraction and processing of sea sand in the subdivision Khorly KHORLY Quarry

9 PERSPECTIVE AREAS OF WORK
SKADOVSK PERSPECTIVE AREAS OF WORK OF THE PORT - Turkey Romania     - Georgia Bulgaria   

10 Integral property complexes
with a complete production cycle of goods (works, services) that can be objects of investment Integral property complex number 1 "Complex processing ferry, packaged unit loads, bulk cargoes“ (SE “The Skadovsk sea trading port") 2. Integral property complex number 2 “Handling complex of the subdivision Khorly processing of powdered, liquid and other cargoes " Skadovsk sea port subdivision Khorly Investment property complexes provides for an increase bandwidth of port, reconstruction and expansion of production capacities, as well as increasing competitiveness and attractiveness for the carrier.

11 The necessary investments for the further development of the port
COMPLETED PROJECTS 1. Regular repair scooping water area at the wharfs and approach channel 2. Current repair wharf number 3 for servicing RO-RO type ships The total amount of funds in 2014 for the restoration of main assets was 4,729 mio. UAH The necessary investments for the further development of the port List million UAH 1. Construction of wharf number 1a 45,0 2. Construction of shore protection of wharf number 4 (section 2) 25,0 3. Regular repair scooping water area and the approach channel of subdivision Khorly 3,0 4. Reconstruction of wharf number 3 subdivision Khorly 30,0 5. Construction of wharf number 6 115,0 Total 218,0