M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.

Slides:



Advertisements
Similar presentations
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Advertisements

ATLAS Frame PRR 1 W.O. Miller Feb US ATLAS Pixel Detector Global Supports PRR W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G. Gilchriese, E.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
M. Gilchriese Evaporative Cooling Tests of Pixel Disk Sectors June 2000 E. Anderssen, M. Gilchriese, F. Goozen, F. McCormack, J. Taylor, T. Weber, J. Wirth.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
M. Gilchriese Pixel Stave thermal/mechanical studies for Valencia Upgrade Workshop M. Gilchriese, M. Garcia-Sciveres, M. Cepeda LBNL W. Miller and W. Miller,
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
M. Gilchriese Disk Rings and Assembly M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese Update on Pixel Prototype Mechanics/Cooling Structures at LBNL February 1, 2008 M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese and.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
M. Gilchriese SLHC Pixel Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese,
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
M. Gilchriese Disk Sectors M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
DOE/NSF Review of U.S. ATLAS /March 2001 WBS Pixel Overview and WBS Pixel Mechanics M. G. D. Gilchriese Lawrence Berkeley Laboratory.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
M. Gilchriese Pixel Update October 3, M. Gilchriese 2 Outline Barrel status and repair strategy Revised ATLAS installation schedule Finishing pixel.
M. Gilchriese Items from Talks U.S. Pixel Meeting Santa Cruz July 2003.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
M. Gilchriese Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, J. Wirth October 11, 2001.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
1 Energy Science Laboratories, Inc. Materials & Processing ESLI Cooled Carbon Support BTeV Pixel Detectors Development Recommendations for 2001 T R Knowles.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Stave Tooling & Plans for Future Stave-building (Tim)
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
DPF2000 ATLAS Pixel Detector M. G. D. Gilchriese Lawrence Berkeley National Laboratory August 2000.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Strip Petals: Local supports and prototype tests
US-HiLumi – Shipping Post Assembly Status
Presentation transcript:

M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review

M. Gilchriese 2 Overview All production of disk sectors will be done at Lawrence Berkeley National Laboratory. Critical tooling –concepts validated by prototype construction –production tooling under final design Critical materials –Carbon-carbon - sample testing in progress to see if meets specs. –Densified foam - all in hand for production –Aluminum tubes - all in hand for production Critical personnel(two people) - in place Ready to begin preproduction this month.

M. Gilchriese 3 Schedule Summary Prototype phase is complete. Production materials in hand or on order. This was largely required by minimum order requirements and to reduce NRE costs. Preproduction –Minimum of 10 sectors, one complete disk + at least 2 more for “sacrificial” testing. –Will mount on preproduction ring. Some production steps can start before preproduction complete(eg. faceplates, tube bending..)

M. Gilchriese 4 Assembly Summary Will summarize materials and the sector assembly sequence in next slides. Photos are of most recent prototypes –Note that tubes for these prototypes were not production length QC/QA steps are defined(but wont say much about them in this talk) –ATLAS document and interface to production database –Draft LBNL travellers in place. –Sample testing planned

M. Gilchriese 5 Materials Carbon-carbon panels from Allcomp, Inc –Sector faceplates –Facings of disk support rings Extruded aluminum tubes from TW Metals –4.7mm x 2.3mm OD with 0.305mm wall Reticulated vitreous carbon foam, CVI densifed(0.15 g/cc) from Allcomp, Inc Thermal compound AIT CGL-7018 Bryte cyanate ester film adhesive Carbon-carbon plate(hardpoints) - in hand from BFG PEEK mounting buttons

M. Gilchriese Summary of Assembly

M. Gilchriese 7 Cut Faceplates and Bend Tubes Faceplates are cut from carbon- carbon plates. Holes cut. Tube bending tooling model.

M. Gilchriese 8 Film Adhesive and Foam Cyanate ester film adhesive is cut and applied to faceplate. Rough-cut foam is attached.

M. Gilchriese 9 Thermal Compound and Cut Foam Thermal compound is applied by glue robot to tube. Tube profile is cut in foam.

M. Gilchriese 10 Insert Tube and Bond Faceplate Tube with thermal compound in half of sector. Second faceplate bonded.

M. Gilchriese 11 Buttons/Fittings and Prep for Parylene Support buttons and coolant fittings added. Plug holes, cover for 8-12  parylene coating.

M. Gilchriese 12 Finished Sector QC/QA steps for parts and during assembly are specified. Testing after final assembly –Visual inspection –Thermal QC will be done with vacuum fixture to bring Pt-on- kapton heaters into contact with sector. IR thermography. This will be done for all sectors. –Sample testing(using procedures developed for prototypes) planned, particularly early in the production.