CARE 06, Frascati, 17.11.05 1 HIPPI in 2006 -HIPPI Objectives -2006 Activities -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.

Slides:



Advertisements
Similar presentations
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Advertisements

D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
CSC, Status of HIPPI – September 2006 Maurizio Vretenar Alessandra Lombardi.
CSC, , A. Lombardi. 1 Status of HIPPI – April 2007 Maurizio Vretenar Alessandra Lombardi.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac4 Status C. Carli presenting (a slightly adopted selection of) slides prepared by and on behalf of M. Vretenar Looking from this point and with a.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael. A. Clarke-Gayther RAL / ASTeC.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
HHH network Activity for the next 18 months Walter Scandale CERN CARE 06 Frascati, 16 November 2006.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Alexander Aleksandrov Oak Ridge National Laboratory
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
CARE 05, CERN, HIPPI Activities -HIPPI Structure Highlights -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther RAL / ASTeC.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
1 PS Days - Evian / MV The SPL : a High-Power Superconducting H – Linac at CERN  Motivations  Applications  Design features  Improvements.
Linac4 Status 1 M. Vretenar sLHC public event
MP - HIPPI General meeting, Abingdon October 28-30, Side Coupled Linac Design at CERN Side Coupled Linac Design at CERN M. Pasini, Abingdon September.
CHARGES TO THE ESAC The External Scientific Advisory Committee for the HIPPI JRA inside CARE has been nominated to analyse the work done and planned in.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
CSC, Status of HIPPI – September 2008 M. Vretenar, A. Lombardi.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
A. FaccoEURISOL DS Task 7GANIL, 30 Nov 2005 EURISOL DS 2° Meeting Task 7 - Primary Accelerator GANIL, November 30, 2005 Summary of the Task 7 status New.
UK Neutrino Factory Conceptual Design
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
The CERN Linac4 history, performance, perspectives
WP5 Elliptical cavities
Linac4 M. Vretenar for the Linac4 design team
Complementary ISTC Projects #3888, 3889p
Accelerator Research and Innovation for European Science and Society
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Physics design on Injector-1 RFQ
Beam Chopper Development for Next Generation High Power Proton Drivers
Superbeams with SPL at CERN
LINAC4 commissioning plans etc.
Pulsed Ion Linac for EIC
Collective Effects and Beam Measurements in Particle Accelerators
Part2: Cavities and Structures
A High Intensity Neutrino Oscillation Facility in Europe
The SPL-based Proton Driver at CERN
Status of the JLEIC Injector Linac Design
SNS-PPU upgrades the existing accelerator structure
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

CARE 06, Frascati, HIPPI in HIPPI Objectives Activities -ESAC Report -Planning and deliverables Maurizio Vretenar, CERN

CARE 06, Frascati, HIPPI: High Intensity Pulsed Proton Injectors Main objective: Research and development of the technology for high intensity pulsed proton linear accelerators up to an energy of 200 MeV. Applications of the HIPPI results: Upgrade of the linac injectors for GSI, CERN and RAL. 10 participating laboratories: RAL, CEA, CERN, FZJ, GSI, IAP-FU, INFN-MI, (INFN-NA), LPSC, IPNO Expected budget: 14.7 M€ (FC-equivalent), EU contribution 3.6 M€

CARE 06, Frascati, HIPPI Workplan : -comparative assessments - Linac designs being finalised

CARE 06, Frascati, HIPPI Technical Goals HIPPI Technical Goals from HIPPI Proposal (Annex 1), reviewed at the HIPPI06 Meeting:  WP2: High shunt impedance normal conducting cavities ZT 2 > 40 M  /m, 3 … 100 MeV, low cost  WP3: Low beta superconducting cavities E acc > 7 MV/m, Q > 10 10, 5 … 200 MeV  WP4: Lossless injection in a ring chopper rise time < 2 ns, minimum emittance growth  WP5: Control of the halo validation of codes, design for loss < 1 W/m up to 1 GeV

CARE 06, Frascati, Meetings

CARE 06, Frascati, Annual Meeting IKP, Forschungszentrum Jülich, Jülich (Germany) -37 participants from 14 Laboratories (10 HIPPI, 1 external, 3 members of External Scientific Advisory Committee - ESAC) -28 technical presentations: 4 on general (inter-WP) topics, 24 on WP specialist topics + 4 presentations on organizational or administrative matters. -25% of time devoted to questions and discussion. -The ESAC participated actively to the discussions (+ 5 hours for reviewing) Programme, copy of slides, list of participants:

CARE 06, Frascati, Publications Good number and quality of HIPPI Publications in 2006: CARE-CONF : 18 CARE-NOTES : 9 CARE/HIPPIdoc : 1 For a total of 28 papers in 2006 (until end of October, average of 2.8/month)

CARE 06, Frascati, WP2: Normal-conducting structures Overview of the 6 models (cold) and prototypes (hot) developed, built and analysed inside HIPPI:

CARE 06, Frascati, WP 2 – Progress with CH-DTL for the GSI linac Some convergence (or cross-fertilization): coupling cells have been added to the CH-DTL structure, as in CCDTL and SCL. New (top) and old design (bottom) of the intertank connection of the CH-DTL developed at IAP-Frankfurt for the FAIR project at GSI The CH-DTL model built at IAP-Frankfurt. Decision by GSI to move from 352 MHz to 324 MHz: easier CH-DTL and compatible with UNILAC upgrade (324=3*108), but no more standardisation of frequencies at the European level.

CARE 06, Frascati, WP2 – Prototyping at CERN for Linac4 Concern: delays (1 yr CCDTL1, 6 months CCDTL2) and bad quality of work due to priority given to LHC (CERN mechanical workshops, CERN vacuum team, even Novossibirsk workshops!) CCDTL pre-prototype built at CERN during high-power tests (left). Prototype built in Russia by ISTC (right) being completed (delivery at CERN in Jan. 07)

CARE 06, Frascati, WP2 – Drift Tube Linac Studies Studies of DTL post-coupler stabilisation at CERN 478 Mechanical design of ISTC DTL prototype

CARE 06, Frascati, WP2 – Side Coupled at LPSC Side Coupled model and RF coupler for DTL being made at LPSC (participation to Linac4 R&D).

CARE 06, Frascati, WP3 (Superconducting) – review of prototypes 7 prototypes in HIPPI: 3 built and tested, 3 only tested in pulsed mode, 1 only for the tuning system:

CARE 06, Frascati, WP3 – Highlights

CARE 06, Frascati, WP3 – HIPPI test area at CEA Saclay

CARE 06, Frascati, WP3 – RF for 700 MHz test stand

CARE 06, Frascati, HIPPI Prototypes - Choppers Chopper A (CERN)Chopper B (RAL) Fast Slow† Rise/fall time< 2 nsec≤ 2 nsec ≤ 15 ns Max. rep rate50 MHz2.6 MHz 1.3 MHz Max. voltage/target250 V/500V1400V / 2200V ≤ 6kV ReliabilityTBD FlexibilityMin 8 nsec (3 bunches)7 – 15 ns 200 ns – 100 us Chopping effectiveness (calculated) 99.7%99.0 % Emittance growth of the un-chopped beam 8%8% (New 3 MeV MEBT design)‡

CARE 06, Frascati, WP4 Progress – CERN-chopper structure September 05 September 06 electrical measurements and vacuum tests are done : OK

CARE 06, Frascati, WP4 Progress – CERN dump READY

CARE 06, Frascati, Fast and slow chopper modules Chopper 1 (fast transition) Chopper 2 / Beam dump (slower transition) BEAM 1.5 m WP4 Progress -RAL DESIGN HAS CHANGED RECENTLY.

CARE 06, Frascati, Two turn load inductance ~ 50 nH Load capacitance ~ 30 pf 6 kV, 400 MHz ÷ 1000 probe - 8 kV ~ 5 μF LF cap. bank + 8 kV ~ 5 μF LF cap. bank - 8 kV ~ 3 nF HF cap. bank + 8 kV ~ 3 nF HF cap. bank HV dampin g resistor 8 kV push-pull MOSFET switch Trigger input Auxiliary power supplies Cooling fan SPG pre-prototype ‘Breadboard’ system WP4 Progress -RAL

CARE 06, Frascati, WP4 Problem : DELAYS  Delay in the CERN mechanical workshop (low-priority in front of LHC)  Delay in vacuum testing ( Vacuum group overloaded)  Delays in delivery of the IPHI-RFQ at CERN (key component of the 3 MeV test stand)  Move of the lab area at RAL

CARE 06, Frascati, QUAD DUMP BSHM Choppers No compromise on the HIPPI goals by going to Saclay w.r.t. tests originally foreseen at CERN. Agreement of the IPHI Steering Committee. Technical document in preparation, to be validated by the next IPHI Steering Committee in October.

CARE 06, Frascati,

CARE 06, Frascati, WP 5 – Beam dynamics Preparation of appropriate tools for the analysis of high-intensity linear accelerators: beam dynamics codes and detectors. Benchmarking of 7 codes (some old, some new, some updated) finished, results are comparable, benchmarking in progress with measurements at GSI UNILAC: first measurement campaign successfully completed in (March and October 06). Progress in the understanding of beam neutralization phenomena.

CARE 06, Frascati, WP 5 – Simulations for CERN and GSI Linac designs Beam dynamics work focused on the requirements of 2 well defined linac projects: CERN Linac4 (tracking+error studies) and GSI FAIR linac (space charge routine for LORASR).

CARE 06, Frascati, ESAC Assessment All 3 ESAC members present at HIPPI06 (J. Stovall, A. Pisent, Y. Yamazaki), ESAC report received (although only yesterday…). 13 page document, quite complete analysis of all HIPPI activities, will be annexed to the HIPPI Annual Report. In general the committee found all of the presentations to be of professional quality. In some cases the work represents important contributions to the art as described below. In some cases the presentations demonstrate the professional development of young scientists under the excellent tutelage of senior scientists. All of the presentations presented represent work at the “international standard.” With the focus on specific upgrade designs, and while no less important, it will be more challenging for the work-package managers to maintain the close collaborations among the HIPPI institutions that we have seen in the first 3 years. The committee is pleased to observe no reluctance among the participants to collaborate with their colleagues and in some cases to note strong inter-lab collaborations. Concerns of the ESAC: delays in chopper beam tests – delays in DTL tank prototype -

CARE 06, Frascati, Deliverables 2006  8 deliverables originally scheduled for 2006 (3 for the summer, 5 in December)  Reviewed list (HIPPI06, September) : 1 has been delivered 3 are expected in December 06 1 merged with an achieved milestone (collimators  dump) 3 rescheduled for 07 (late by 6 – 7 months)

CARE 06, Frascati, Milestones 06  3 milestones for carried over from 05 : 16 milestones in 2006  Status today : 9 milestones completed, 4 to be completed by dec06, 3 rescheduled for 07