Address Recommendations Jian-ping Chen, JLab SoLID Collaboration Meeting May 14-15, 2015.

Slides:



Advertisements
Similar presentations
MADII Design and Physics Program Jian-ping Chen, Jefferson Lab Hall A Collaboration Meeting June 22-23, 2006 MADII Spectrometer Design Optics and background.
Advertisements

Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
General Considerations Jian-ping Chen SoLID-SIDIS Collaboration Meeting.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
© 2006 Prentice Hall Leadership in Organizations 11-1 Chapter 11 Leadership in Teams and Decision Groups.
Test Automation Success: Choosing the Right People & Process
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
EPAC June 2003 The EPAC June 2003 Questions 1. Clarify the Motivation for the Proposal. 2. How to ensure the e+ polarimeter works right away? 3. What is.
Experimental requirements for GPD measurements at JLab energies. Detector that ensures exclusivity of process, measurement of complete final state Measure.
A Comparison of Three-jet Events in p Collisions to Predictions from a NLO QCD Calculation Sally Seidel QCD’04 July 2004.
© 2005 Prentice Hall14-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
Information Systems Planning
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
System Planning- Preliminary investigation
Developing a result-oriented Operational Plan Training
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
SoLID: large acceptance, capable of handling high luminosity (up to~10 39 with baffle, up to ~10 37 without baffle)  Ideal for precision Inclusive-DIS.
Crossed Channel Compton Scattering Michael Düren and George Serbanut, II. Phys. Institut, - some remarks on cross sections and background processes  
Alter – Information Systems © 2002 Prentice Hall 1 The Process of Information System Planning.
Possibility for Double DVCS measurement in Hall A Alexandre Camsonne SBS Meeting June 4 th 2013.
SoLID simulation Zhiwen Zhao Uva SoLID Collaboration Meeting 2011/6/2 1.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
19 November 98 1 Jürgen Knobloch ATLAS Computing ATLAS Computing - issues for 1999 Jürgen Knobloch Slides also on:
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Core Banking Transformation: A Roadmap to a Successful Core Banking Product Implementation - PMI Virtual Library | | © 2008 Kannan S. Ramakrishnan.
Cherenkov Counters for SoLID Z.-E. Meziani on behalf of Simona Malace & Haiyan Gao (Duke University) Eric Fuchey (Temple University) SoLID Dry Run Review,
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Measurement of F 2 and R=σ L /σ T in Nuclei at Low Q 2 Phase I Ya Li Hampton University January 18, 2008.
SOFTWARE PROJECT MANAGEMENT
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
SoLID simulation Zhiwen Zhao UVa 2011/03/25 1. GEMC, written by Maurizio Ungaro, used for CLAS12 2.
SoLID review DAQ recommendations Alexandre Camsonne.
Optics, Tracking, and TOF Status/Update/Roadmap Xin Qian KRL Caltech.
Review of τ -mass measurements at e + e - - colliders Yury Tikhonov (Budker INP) Contents  Introduction  Current status of τ-mass measurements and μτ.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
Calorimeters Design Issues and Simulation Needs C.Woody Physics Department Brookhaven National Lab EIC Simulation Workshop Oct 9, 2012.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Update/Overview of SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting Dec , 2012.
Program Assessment – an overview Karen E. Dennis O: sasoue.rutgers.edu.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
CMS Crosscut Operations and Research, Theory, Computing, University Involvement C. Young and B. Zhou.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Precision Measurement of G E p /G M p with BLAST Chris Crawford MIT Laboratory for Nuclear Science Thesis Committee Review Meeting 2003/12/4.
Update on SoLID Jian-ping Chen, Jefferson Lab SoLID Collaboration Meeting November 8-9, 2013.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Timelike Compton Scattering at JLab
Why Consider a Toroid Spectrometer Built Around Existing Hardware?
SoLID Simulation Zhiwen Zhao 2016/08/27.
Status Update Jian-ping Chen, JLab SoLID Collaboration Meeting
PVDIS Overview.
Special Considerations for SIDIS
J/   analysis: preliminary results and status report
General Update Jian-ping Chen, JLab SoLID Collaboration Meeting
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
Magnet, Support and Infrastructure
General Update Jian-ping Chen, JLab SoLID Collaboration Meeting
Status Update Jian-ping Chen, JLab SoLID Collaboration Meeting
How can we study the magnetic distortion effect?
Presentation transcript:

Address Recommendations Jian-ping Chen, JLab SoLID Collaboration Meeting May 14-15, 2015

3) For the PVDIS measurements, the viability of the elastic scattering calibration procedure, to determine absolute Q2 should be demonstrated by simulations for similar scattering angles to those probed in DIS, and with realistic misalignments. Bob? short term (few months?)? 4) Bin migration effects should be simulated for the measurements of the sharply rising J/ψ production cross section near threshold. 5) The signal and background trigger rates should be simulated for the J/ψ measurements. Zhiwen? short term? 8) Better comparisons with the expected results on programs such as SBS and particularly CLAS12 are needed to clarify the need for the SoLID SIDIS program. Crisp demonstrations of the improvements possible with SoLID should be developed. Mehdi/Zhihong/Kalyan/Alexei? short term? Physics Relevance and Risks

Physics Relevance and Risks (continue) 9) The SoLID Collaboration should investigate the possibility of kaon identification, especially given their high luminosity. 17) The collaboration is encouraged to explore the power of extended kaon identification (through Cherenkov or TOF). Yuxiang/Jin? long term (~ > 1 year?) 10) The SoLID collaboration should investigate the feasibility of carrying out a competitive GPD program. Such a program would seem particularly well suited to their open geometry and high luminosity. If SoLID’s luminosity is sufficiently high to permit a program of precise Double Deeply Virtual Compton Scattering (DDVCS) measurements, it would make a groundbreaking contribution to GPD studies. Alex/Zhihong/Zhiwen? short-long term 2) Acceptances, efficiencies, and systematic uncertainties should be simulated for each of the core measurements Zhihong/Rakitha/Zhiwen? short term

1)End-to-end simulations with realistic subsystem responses and material budgets, and complete track finding and reconstruction should be developed. 7) The development of a simulation framework with realistic reconstruction and analysis should be pursued with high priority and increased resources. 16) The collaboration is strongly encouraged to develop an end-­ ‐ to-­ ‐ end realistic simulation and reconstruction to further optimize cost and physics reach and derive clear performance requirements for the individual subdetectors. 23) Having a functional simulation and reconstruction routines as soon as possible should be a high priority in the software effort. Such software will pay off many times over in experimental design and avoiding pitfalls Ole/Zhiwen/Seamus? long term 6) The dead-time(s) in the DAQ chain should be modeled. Yuxiang/Bob? mid-term (~ 6 months?) Simulations/Software

11) Develop an overall R&D plan for the project with a timeline Subsystem coordinators/JP? short term? 12) Close interaction between the US and Chinese groups in the development of GEM foils to assure good quality control Is highly recommended. 13) Investigate the schedule risk when GEM foils are not produced in a timely way and continue to pursue Tech-­ ‐ Etch as a potential supplier for the foils. Burnd/Xiaomei? short-long term? 14) The calorimeter group is encouraged to contact other groups (ALICE, LHCb and possibly CMS) to understand the detector design choices these groups have made and resources needed for construction. Xiaochao? short term 15) The stability tests of the conductivity of the glass for the MRPCs should be extended for a much longer period and the risk associated with the R&D needs to be identified. Yi Wang? short term? Detectors

18) The Committee strongly recommends testing the CLEO magnet coils (cold test), power supply and controls, before installation in Hall A. Robin? long term? 19) A new magnet power supply should be included in the total cost Of SoLID Robin? short term? 20) Evaluate the schedule impact of mapping the magnetic field in situ in Hall A. Robin/User? Short term? 32) We strongly recommend tests at JLab of the CLEOII magnet coils (cold test), ideally with the new power supply and controls, before Installation into the hall. Robin? long term? 30) A cost benefit analysis for any systems being reused should be carried out, including the magnet power supply. Robin? short term? Magnets

21) The plans for the High Level Trigger and the needs for slow control need to be worked out in detail and the implications for resources need to be evaluated. Alex/Brad? short term? 22) Closer communication with the other JLab experiments and the JLab computing center is strongly encouraged. Alex/Ole/Brad? short term? 26) Compare the resource levels you have assumed in some key areas (particularly in software, data acquisition and project management) to make sure the estimates align with other similar projects or there is a good reason they do not. Ole/Alex/JP? short term? DAQ/Slow Control

24) Complete radiation calculations to determine activation and absorbed dose on components of concern and mitigate as appropriate. Lorenzo? short term? 25) It should be confirmed that the baffle design, including the support structure, is optimized for background rejection and signal acceptance. Furthermore the baffle design should minimize generation of secondary backgrounds. Richard/Zhiwen/Robin? short term? 35) The project should start planning the process of how to change from one SoLID configuration to another in order to better understand the time and effort involved and if there are any potential issues such as radiation levels. Paul/Robin/Lorenzo/JP? short term? Radiation/Baffle/Switch-over

27) Redo the cost estimate using an average cost per type of resource.. JP? short term? 28) Create a high level resource loaded schedule to get a more realistic schedule, funding and resource profile. This will also allow JLab to better determine their ability to support the FTE needs. 34) The project should develop a preliminary resource loaded schedule for the installation and the corresponding space-­ ‐ management plan for the hall floor. Subsystem/Robin/Ed/JP ? short term? 33) An effort should be made to clearly specify resources required from JLab that are not explicitly in the project (effort, non-­ ‐ effort, equipment, building space, etc.). Robin/JP? short term? Cost/Resource/Project Management

29) Revisit the comments of the 2012 Internal Review Report in conjunction with the recommendations from this report. JP? short term? 31) Appoint a small team to facilitate the integration planning for SoLID. Paul/Bob/JP? short term? Findings: The plans and R&D necessary to deal with the small polarization of the D2 target need to be fully developed. Chris/Dave? long term? General/Integration/Dependencies