VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey January 10, 2012.

Slides:



Advertisements
Similar presentations
New Geometric Datum: plans Modernizing the U.S. National Spatial Reference System FGCS San Diego, California Monday 11 July 2011.
Advertisements

Assistant Administrator National Oceanic and Atmospheric Administration National Ocean Service September 18, 2008 John H. Dunnigan Toward National Height.
Alabama Height Modernization Project, NAD 83(2011), and GEOID 12 in Alabama Overview of Height Modernization Project Overview of Height Modernization.
New Datums Are Coming in 2022!  Both a new geometric and a new geopotential (vertical) datum will be released in  The realization of the new datums.
National Height Modernization Program (NHMP) Update Great Lakes Region Height Modernization Consortium Meeting Columbus, OH October 13, 2011.
LINDA MORGAN PRINCIPAL CONSULTANT – SPATIAL POSITIONING WESTERN AUSTRALIA SURVEYING CONFERENCE 2013 Geodetic Stuff You Need to Know: Datums, Standards.
NGS Geodetic Tools and Education Services Marti Ikehara: California Geodetic Advisor
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Plan Overview Center for Operational Oceanographic.
NC Floodplain Mapping Program North Carolina Floodplain Mapping Program Becoming a Cooperating Technical State.
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Refinements to the North American Datum of 1983 Multi-Year CORS Solution and the National Adjustment of 2011 Dr. Neil D. Weston Chief, Spatial Reference.
Federal Geodetic Control Subcommittee Update to Coordination Group Ronnie Taylor alternate Subcommittee Chair Deputy Director, National Geodetic Survey.
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 11, 2011.
Feedback on the New Datums 2015 Geospatial Summit April 13 to 14, 2015 U.S. Geological Survey Kari J. Craun.
DAVE REED HYDROLOGIST IN CHARGE NOAA/NWS LOWER MISSISSIPPI RIVER FORECAST CENTER Datums and Stages - Importance to the NOAA/NWS Hydrologic Services Program.
Feedback on the New Datums 2015 Geospatial Summit April 13 to 14, 2015 North Carolina Geodetic Survey Gary W. Thompson.
Surveying & Mapping. GPS on Bench Marks Campaign.
Juliana Blackwell, Director National Geodetic Survey, NOAA
New Geometric Datum: plans Modernizing the U.S. National Spatial Reference System FGCS San Diego, California Monday 11 July 2011.
Streamgage Datum Conversion Great Lakes Region Height Modernization Consortium meeting New Cumberland, PA April 13, 2011.
International Great Lakes Datum Overview Presented at a Height Modernization Program meeting January 9, 2014 by David Conner Geodetic Advisor to the State.
Streamgage Datum Conversion Eastern Region Height Modernization Consortium Webinar March 4, 2014 Jim Kolva, USGS, Office of Surface Water.
Feedback on the New Datums 2015 Geospatial Summit April 13 to 14, 2015 US Army Corps of Engineers Jim Garster.
NGS HSRP Update Ronnie Taylor, Acting Director National Geodetic Survey, NOAA October 13, 2010.
The Future of the National Geodetic Survey Dr. Dru A. Smith Chief Geodesist, NGS/NOAA CSRC, Coordinating Council Spring Meeting La Jolla, CA April 28,
National Geodetic Survey Update Providence, RI May 6, 2010 Juliana Blackwell Director, National Geodetic Survey.
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
National Flood Conference April 22, 2009 Victor Hom Hydrologic Services Division Office of Climate, Water and Weather NOAA’s National Weather Service National.
Transition of the ORGN from NAD 83(CORS96) epoch to NAD 83(2011) epoch Ken Bays, PLS Lead Geodetic Surveyor Oregon DOT March 2013 ODOT.
Who Needs New Datums? NGS Says… ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
GPS and Geodetic News You Can Use David Conner Geodetic Advisor to the State of Ohio National Geodetic Survey, NOAA 2008 Ohio GIS Conference September.
NOAA’s National Geodetic Survey Update Michael Dennis, RLS, PE ® Esri Survey Summit July 6-9, 2013 ● San Diego, CA.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Feedback on the New Datums 2015 Geospatial Summit April 13 to 14, 2015 Federal Emergency Management Agency Risk MAP Paul Rooney.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting Tuesday, November 3, 2009 Juliana Blackwell Director,
NGS Produces New Coordinates: Is it still NAD83? Past, Present, Future Marti Ikehara California Geodetic Advisor Sacramento, CA.
Coastal Zone 2011 Conference “Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA, Presentation 1)TOOLS TO OBTAIN GEODETIC CONTROL.
Socio-Economic Studies What? Why? How? April, 2014 Brett Howe NGS Geodetic Services Division Chief.
AEC Summit NOAA’s National Geodetic Survey Update Brian Shaw Geodesist.
Who Needs New Datums? NGS Says… ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
Feedback on the New Datums Reference Frames 2015 Geospatial Summit April 14, 2015 Amar Nayegandhi Dewberry Consultants LLC.
National Geodetic Survey – Continuously Operating Reference Stations & Online Positioning User Service (CORS & OPUS) William Stone Southwest Region (UT,
The GRAV-D Project and The Future of NAD 83 and NAVD 88 A briefing for FEMA leadership Dru Smith, Chief Geodesist NOAA’s National Geodetic Survey.
New Vertical Datum: plans, status, GRAV-D update FGCS San Diego, CA. July 11, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical.
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
Federal Geodetic Control Subcommittee Update to Coordination Group Juliana Blackwell Subcommittee Chair Director, National Geodetic Survey
National Geodetic Survey’s National Height Modernization Program Overview Beaumont, Texas June 8-9, 2009 Renee Shields Height Modernization Manager.
The Height Modernization Program in the United States and the Future of the National Vertical Reference Frame 1 Renee Shields National Geodetic Survey,
National Geodetic Survey’s National Height Modernization Program Overview Monroe, Louisiana June 11-12, 2009 Renee Shields Height Modernization Manager.
Height Modernization in the U.S.: Implementing a Vertical Datum Referenced to a Gravimetric Geoid Model Renee Shields National Geodetic Survey, U.S.A.
Recent Northern Gulf Coast Height Modernization Control Projects Denis Riordan, PSM 2009 Mississippi Statewide Leveling Project.
VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 24, 2012.
Who Needs New Datums? NGS Says…
National Geodetic Survey Update Hydrographic Services Review Panel Honolulu, HI May 4, 2011 Juliana Blackwell Director National Geodetic Survey.
Height Modernization Activities at NGS Christine Gallagher National Partner Meeting April 30, 2014.
National Height Modernization Program Strategic Plan Renee Shields, Height Modernization Program Manager.
New Datum: Vertical (Geopotential) FGCS Silver Spring, MD. July 24, 2011 Mark C. Eckl NGS Chief of Observation and Analysis Division, New Vertical Datum.
Height Mod in Kentucky Height Modernization Forum Flint, Michigan January 26, 2006 Ross Mackay Kentucky Geodetic Advisor.
Federal Geodetic Control Subcommittee Update Federal Geographic Data Committee Coordination Group Meeting 11 January 2011 Ronnie Taylor Acting Director,
Vertical Geodetic Control in Southern Louisiana: Providing the National Spatial Reference System in Dynamic Regions June 20, 2011 Renee Shields Height.
Update on National Geodetic Survey Activities Joe Evjen, NGS 02 May 2006.
Geodetic Control and Datums Where is it? How Accurately can we map it?
Colorado Height Modernization Forum Zelda LeCoat Zelda LeCoat.
Update on NGS Activities ftp://ftp.ngs.noaa.gov/pub/marti Marti Ikehara California Geodetic Advisor, Sacramento.
National Geodetic Survey Update Juliana P. Blackwell Director, National Geodetic Survey September 16, 2015.
NOAA’s National Height Modernization Program Regional Height Modernization Forum Wichita, Kansas May 2, 2008 Renee Shields Height Modernization Manager.
Federal Geodetic Control Subcommittee Update to Coordination Group Juliana Blackwell Subcommittee Chair Director, National Geodetic Survey
Improvements to the Geoid Models
Adopting National Standards for Tidal and Geodetic Datums
Presentation transcript:

VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey January 10, 2012

Identify common objectives, and find opportunities for cooperative projects, tasks: water level gage datum updates, sea level change or subsidence studies Identify Products and Services within each agency impacted by new vertical datums: flood maps Update existing guidelines, standards, specifications to support transition to new datums Education, Outreach, Capacity Building for users Vertical Reference System Work Group Work Plan

Quarterly teleconferences - next meeting April 5, 2011 Developed worksheet for each agency to identify their products/services that rely on vertical datums Identify venues for outreach/education VRSWG Accomplishments: May 2010-Present

Infrastructure – Special Projects: So LA, MSDOT leveling and GPS, TN leveling, WI Statewide leveling adjustment – NA2011 – consistent ellipsoid heights – Updates to NGS Datasheet formats Announcement on NGS website Implementation to coincide with NA2011 release Relevant Height Modernization / NGS Accomplishments: July 2012-Present

Datasheet Format Changes Move ell ht and epoch info into top box, add datum tags Note when GPS Ortho Ht computed with previous geoid model, and provide that model ht Better way to quantify accuracies

Current Datasheet

Models/Tools – GEOID12 – GRAV-D – TX Geoid Slope project – VDatum – HTDP – VTDP – OPUS DB, Projects, etc. Relevant Height Modernization / NGS Accomplishments: July 2012-Present

Insert VDATUM slides here Relevant Height Modernization / NGS Accomplishments: July 2012-Present

HTDP (Trans4D)/VTDP – Plan to include a vertical component with HTDP = Trans4D Developed by Jeff Freymueller at UAF with Richard Snay Uses primarily CORS velocities Not ready for Prime Time in areas like Gulf Coast – Leveling projects in Gulf Coast region, added to NGS IDB since 1995, being incorporated into VTDP Relevant Height Modernization / NGS Accomplishments: July 2012-Present

Guidelines/Specifications – Guidelines for analysis and adjustment of survey data in areas prone to crustal motion – NC/FEMA Floodplain mapping pilot Relevant Height Modernization / NGS Accomplishments: July 2012-Present

Floodplain Mapping Pilot Project Goals: – Analyze how FEMA floodplain mapping will be affected by the release of the new datums – Provide recommendations for FEMA, cooperating partners and NGS Selected one stream with existing detailed study in coastal area Two Part Method: – Converted data to “proxy” datums ITRF 2005/GRS80 State Plane 3200 USGG2009 – Analyzed impacts to floodplain mapping Derived products (DEM creation from LiDAR) Watershed size difference Floodplain boundary and Base Flood Elevation change Bridge height sensitivity 11

Pilot Project: Conclusions 12 Significant coordinates shift Horizontal: ft/0.828 m Vertical: ft/ m Larger impact on higher accuracy elevation data DEMs derived from LiDAR can be transformed directly for hydrology, may use same models Minimal changes in the floodplain, will depend on the location, the mapping method, and engineering judgment Existing models will need to be revised to use ground data collected in new datums While this study provides the first look at the expected effects, additional studies are warranted prior to the 2022 modernization The development of an implementation plan is extremely important for FEMA and other agencies Important to have a clear message and communication to constituents Full Report:

Part A: Coordinates US ftAverageMaxMinStDev dx dy dxy dH MetersAverageMaxMinStDev dx dy dxy dH

Part B: Derived Products 14 DEM Elevation Differences Transformed - LiDAR AverageMax.Min.Std Dev. Feet Meters

Part B: Watershed Difference 15

Part B: Floodplain Mapping 16

17

Part B: Bridge Height Sensitivity Cross Section Top Width Difference (ft)BFE Difference (ft) BRIDGE CROSS SECTION

Outreach/Education – Geospatial Summit – Monthly Height Mod teleconferences to inform users – value- added with guest speakers – Website completed – Lidar Forum – August 2011 – Height Mod Partner meeting – August 2011 Relevant Height Modernization / NGS Accomplishments: July 2012-Present

First draft of overall Plan complete and being reviewed Strategic plan development underway Operating plans will be developed from these Emphasize coordination with federal partners and local partners Develop budget strategies National Height Modernization Program Plan

Questions Renee Shields Height Modernization Manager , x116