Www.cbelearning.com Wates CBE Learning Build: Plant interactive.

Slides:



Advertisements
Similar presentations
Advanced Construction Technology
Advertisements

Lab Zone Guided Inquiry Investigate: What tasks can a machine do?
Using Large Landscape Maintenance Equipment. Next Generation Science/Common Core Standards Addressed! CCSS.ELA Literacy.RST.9‐10.1 Cite specific textual.
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Draglines and Clamshells
Report #5 Brief Description A laborer was steam cleaning a scraper. The bowl apron had been left in the raised position. The hydraulically controlled apron.
LED Signs Installation By LED Craft Inc. P20mm Full Color LED Sign : 32” high x 90” wide Lit Box Sign: 18” high x 90” wide
Hargrave Street Pumpstation – Site Preparation July 2014.
CERTIFICATE 4 IN BUILDING BCGBC4004A. General Notes  Site clearing billed in m 2 & includes trees ≤0.5 m girth measured 0.5 m above ground  Tree removal.
Concrete
Foundation Systems.
Physical Science Unit 3 Warm-Up
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
Rectangular framed structures
Chapter 2b Foundations Shallow & Deep Foundations.
ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.
Housekeeping 2015 POST Safety Forum Rob Rivers.
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Formula? Unit?.  Formula ?  Unit?  Formula?  Unit?
Road Construction Technology
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
WEEK 1 You have 10 seconds to name…
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Joints for Diaphragm Walls
Seeing Words Seeing Words Mighty Machines bulldozer.
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
THE NEW HALL (What the builders have done). WEEK ONE On week one the builders were marking out the site. They were using a digital gps system. They also.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
EARTH’S SURFACES. Students will learn that volcanoes, earthquakes, uplift, weathering, and erosion reshape Earth's surface. Standard Today We are going.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
Example: Presentation Expository writing: * Minimum of 5 slides. * List materials/ingredients or equipment, also include pictures and simple instructions.
Demonstrate Concrete Skills Form A wood or metal structure that confines concrete to the desired shape until it hardens.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
CONSTRUCTION AND MINING EQUIPMENT SUBMITTED BY : SHASHI RANJAN.
Excavation and lifting Excavator: Power driven digging machine Types 1. Hydraulic excavator 2. Cable operated excavator 3. Shovel 4. Draglines 5. Hoes.
Earth Moving Equipment Companies in Sharjah
SME 50/30 Meter Rule.
Substructure Groundworks - Hazards
CE 332 – Construction Engineering and Management
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
SX1 manipulation VERSION 1 Version
MICE Partial Return Yoke Mechanical Design
9.3 Explaining the operation procedure of carrying machine for production facilities and crops Forklift Truck Product Description We are a professional.
Unit 1 Lesson 3 Bell Work Key Words Risks and Hazards Control measures
Topic B.2: Sub-structure groundworks
Ness Bridge Construction
Grout and Other Reinforcement Module
Construction Equipment Rental Market to Grow In 2018 The Canadian construction industry will witness a robust 4% growth in the year 2018 after the 1% decline.
History of Pool Construction
Minuteman Vocational Technical Regional High School Progress
السلامة أولاً SAFETY FIRST.
Building Construction I Sofia Sebastian 1
Component or parts of a building
Strip Foundations The foundation runs under all the loadbearing walls.
Pier Foundations Piers Suspended floor Ground beam Next slide.
Seeing Words.
Unit 1 Lesson 3 Bell Work Key Words Risks and Hazards Control measures
RDR Baseline Layouts for Interaction Region
SDEM ROADS AND INFRASTRUCTURE LIMITED
Name __________________________________________ Date _________________ Period __________ Pulleys Directions: Pulleys are simple machines that can.
Seeing Words.
Neutron guide Shielding Concept
A Few Benefits of Excavation Companies of Dalton GA.

How Excavation Companies Help You In Construction Projects In Ooltewah, TN.

Presentation transcript:

Wates CBE Learning Build: Plant interactive

 Building the new school will take place in stages  Each slide gives you information about one stage  Work out how long each stage will last  Decide which machine is needed for which task  Write down how long each one will be needed, and its weekly cost What is needed and when?

 Digging away uneven ground2 weeks THEN  Levelling the surface1 week THEN  Creating a firm surface1 week PLUS  Removing waste materialsDuring last 2 weeks Dumper: £850 Grader: £950 Excavator: £1,250 Compactor: £ Ground work

 Digging trenches2 weeks THEN  Pouring concrete1 week Dumper: £850 Grader: £950 Excavator: £1,250 Mixer: £2, Foundations

3. Structure and roof  Lifting steel beams into place2-6 weeks Hydraulic crane: £6,000 Forklift: £850 Piledriver: £1,500 Hint: How could you make this 2 weeks and not 6?

 Re-shape grounds2 weeks PLUS  Remove wasteDuring re-shaping Dumper: £850 Grader: £950 Excavator: £1,250 Compactor: £ Landscaping

 Use your notes to make a simple spreadsheet  Work out: - the total time for the build - how much each piece of plant will cost  Use a simple formula to help you add up times and costs Work out the time and costs