Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.

Slides:



Advertisements
Similar presentations
Managed by UT-Battelle for the Department of Energy Status and Implementation of Wideband Feedback System for e-p Instabilities in SNS Craig Deibele, Z.
Advertisements

Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Initial Performance Results of the APS P0 (Transverse Bunch-to-Bunch) Feedback System N. DiMonte#, C.-Y. Yao, Argonne National Laboratory, Argonne, IL.
January 19, 2006PEP TFB R.Akre PEP II Transverse Feedback System Ron Akre William Colocho Anatoly Krasnykh Vojtech Pacak Dmitry Teytelman Uli Wienands.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
A Possibility of Constant Energy Extraction at ATF2 A.Kalinin Accelerator Science and Technology Centre Daresbury Laboratory Warrington UK FONT Meeting.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Crabbed Waist Scheme at DA  NE M. Zobov for DA  NE Upgrade Team SuperB IV, November 2006 Monte Porzio Catone - Italy.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Feedback System Design Alessandro Drago SuperB Meeting January 2000 SLAC.
Coupled bunch Instabilities at ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University Refer to.
LFB, LLRF, TFB update Alessandro Drago XIII SuperB General Meeting Isola d’Elba, 5/30-6/
Multi-bunch Feedback System Review and Challenges for 1-2GHz Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
Feedback Systems Update Alessandro Drago SuperB General Meeting Perugia June 2009.
CESR-c and ILC Damping Ring Instrumentation
RF acceleration and transverse damper systems
Dither Luminosity feedback versus Fast IP feedback
Bunch-by-bunch feedbacks and Low Level RF
Working groups status report on Feedbacks
Feedback systems and Low Level RF
ATF/ATF2 Control System
ILC LLRF Status Ruben Carcagno, Brian Chase
Feedbacks for low emittance accelerators
SuperB Injection, RF stations, Vibration and Operations
Horizontal e+ instability Study & Solution
Digitizers in CCR for transverse wide-band pick-ups
Utilization of KEKB for ILC R&D
Strip-line Kicker R&D at KEK-ATF
Intrabunch feedback system development at DAFNE
Fill-pattern Control System for KEKB
Limits on damping times
Accelerator R&D Results from the B-factory
Instability measurement plans at ATF
Feedback Systems in Circular Colliders
SuperB IRC Meeting Frascati, Nov. 13th 2007
Presentation transcript:

Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007

Main topics List of ILC feedback proposed activities with the involved laboratories. Performances of the new FPGA-based feedback system [collaboration PEP-II / KEK / DAFNE] Measurements about rms noise in the feedback loop - discussion if it can produce an increase of the beam vertical emittance. Proposal of a collaboration (in the ILC project) for a new 16-bit system working at 650MHz sampling frequency Looking for larger feedback-related collaborations

List of ILC feedback proposed activities (from ActivitiesResources_ pdf). The proposing laboratories are: SLAC LBNL KEK INFN-LNF Note: all the above lab’s have already been involved in long collaborations in the past (remote and near)

Looking back: the first FB collaboration This is the longitudinal feedback developed in the years by a SLAC – LBNL - LNF collaboration Still PEP-II, DAFNE, ALS Four VME crate: each VME board contains 4 dsp The system can manage up to 80 dsp Each dsp can elaborate up to 32 bunches.

Proposed by DAFNE2 Alghero workshop (09/2003)

G-proto [D.Teytelman et al] since october 2005 installed on DAFNE, horizontal e+ fb, PEP-II and KEK. Based on Xilinx Virtex-II Vmic 7750 (VMEbus) connected by 2 USB i/f

Gproto upgrade (1-12/9/06) - Hardware: temperature monitors installed on the main components in the module

-Software: new operator i/f and more efficient FPGA code

EPAC’06 Poster THPCH103

II generation digital bunch-by-bunch feedback designed for SuperB factory (collaboration SLAC-KEK-LNF) - Features: - extremely compact - gain & phase digital and remote control - possibility to manage any betatron or synchrotron tunes - robust response to big injection (FIR filter 8/16 taps) - real time parameter monitoring - powerful beam diagnostics - main DSP loop based on FPGA (Field Programmable Gate Array) iGp [D.Teytelman et al.] The new feedback under test at SLAC, KEK and LNF

iGP: the feedback (almost) in a single chip

Power supply Hard disk unit Personal Computer Feedback board 40cm

RF clock, triggers & feedback input/output

EPICS operator interface and sw tools ready to run

ILCDR feedback design considerations It is important to decouple the feedback system from the type of injected pattern: this means to process every bucket (with or without bunch inside). With this approach the fb has to process h channels [h=harmonic number ~ 15000] The fb system have to be so flexible to be able to work with every possible tunes, from the lowest to the highest

ILCDR feedback design considerations In DAFNE we have measured a transverse feedback damping time of 7 ms (i.e. 20 turns) using 2 x 250 W power amplifiers Every power amplifier costs ~ 50k euro and the power section is the 80% of the feedback cost In ILC DR, a feedback damping time of 20 turns will mean the capability to manage ~400 ms -1 instability growth rate To dimension correctly power and budget is necessary to know if this is sufficient

Vertical emittance warning ILCDR vertical emittance is very low Feedback are active system, so they can make worse the emittance if the beam size in the plane is very KEK/ATF (Nov. 2005): Fox / Teytelman / Tobyama / Flanagan / Drago state that: “RMS noise coming from pickups can enter in the feedback loop to increase the beam vertical dimension and as conseguence the vertical Dafne (Dec. 2006): Fox / Drago make measurements of rms noise sources in the longitudinal feedbacks

Noise from low frequencies (no beam!)

Possible noise sources in the feedback loop

Looking for new collaboration/ items to discuss: System specifications R&D on front end analog blocks (T & L) R&D on the digital part R&D on back end analog blocks (T & L) Transverse and Longitudinal kicker design Low noise issue

Preliminary proposed specifications for the digital part iGP (today)  ILCDR Feedback F samp : 500MHz  650Mhz Bunch spacing: 2ns  1.5 ns # bunches: ~5000  ~15000 bits processing: 8(12)  16 Filter: 16-taps FIR  50-taps FIR Filter banks: 2  2 Downsampling 1:32  1:32 Fpga Virtex-II  Virtex-5

For example the Xilinx Virtex-4 is a fpga low cost module: it can be used to test the software implementation

Conclusions A multi-laboratories collaboration is hopeful SLAC, LBNL, KEK, Frascati have a long fruitful story in feedback collaboration It would be very useful to make convergent efforts Test new feedback system on many different colliders or light sources is very stimulating and rich of new suggestions and ideas