Renewable Energy Project Analysis Course - Module 1

Slides:



Advertisements
Similar presentations
The Concept of Incremental Costs Typical GEF Projects for Climate Change 1. Energy Efficiency (Operational Prog. 5) Industrial Boilers Agricultural Pump-Sets.
Advertisements

An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions reduction George Mavrotas.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
1 Cost-Effectiveness Screening Issue for RTF August 30, 2007.
Renewable Energy in Islamic Republic Of Iran
EWEC 2007 Milano Drs. J.P. Coelingh, senior consultant Wind and power derivatives in project financing.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Paul A. Weghorst Executive Director of Water Policy
Feasibility of Solar Technology Adoption: A Case Study on Tennessee’s Poultry Industry Ernest F. Bazen & Matthew A. Brown Presented by Yao Yin.
CBA FINAL PROJECT 2002 Gyorgyi Cicas ; Jose L. Aguirre; Po-Hsin Lin CBA OF OPERATING PHOTOVOLTAIC SYSTEM IN PITTSBURGH.
Clean Energy Project Analysis Course Financial and Risk Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo Credit:
Photo Credit: Nordex AG © Minister of Natural Resources Canada 2001 – Clean Energy Project Analysis Course Wind Energy Project Analysis Utility-Scale.
Clean Energy Project Analysis Course © Minister of Natural Resources Canada 2001 – Combined Heat and Power Project Analysis Photo Credit: Warren.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Clean Energy Policy Analysis With RETScreen ® Photo Credit: Strong, Steven DOE/NREL.
Introduction to Renewable Energy Project Analysis © Minister of Natural Resources Canada 2001 – “Renewable Energy Project Analysis” is a case-study.
Tax Credits & Financing for Energy Efficiency & Renewable Energy Projects Presented by: The Morgantown Green Team.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Fremont County – Green Spring 2012 Research Team: Jacob Tolman, Justin Andersen, Thresia Mouritsen, Joseph Huckbody, John Beck Feasibility Study.
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 7 Cairo, 17 July 2005.
UZBEK ACADEMY OF SCIENCES RENEWABLE ENERGY: PROBLEMS AND PROSPECTIVE IN UZBEKISTAN Ilkham G.Atabaev, Dr of science in physics and mathematics, deputy-director.
120 MW geothermal power plant, Iceland
Journées "Ports & Environnement” Clean Energy Management in Ports EFFORTS results Le Havre – March 10th, 2010.
The Energy Challenge Farrokh Najmabadi Prof. of Electrical Engineering Director of Center for Energy Research UC San Diego November 7, 2007.
1 Utility Ownership of Wind Power: Why it makes sense now American Wind Energy Association May 17, 2005 Eric Markell Senior Vice President Energy Resources.
Small Hydropower Potential in Missouri Lea Kosnik University of Missouri, St. Louis 2009 Ongoing work generously funded by the Smith Richardson Foundation.
Cogeneration / Distributed Generation Proposal Oakland University.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
renewable energy projects and GHG emission estimation
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
ECE 7800: Renewable Energy Systems Topic 12: Economic Analysis of Renewable Energy Systems Spring 2010 © Pritpal Singh, 2010.
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
Solar Thermal Power Plants By Dr. Irshad Ahmed Department of Mechatronics, Air University, E-9, Islamabad.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
Solar Water Heating for Climate Protection: The Role for Carbon Finance Presented At: COP11 MOP 1, Montreal Canada 30 November 2005 By: Steven Kaufman.
Environmental Challenges and Opportunities of the Evolving North American Electricity Market Presentation for UNFCCC Workshop on Cleaner GHG Emitting Energy.
Utility Perspective on Climate Change Frank Prager January 22, 2008 Frank Prager January 22, 2008.
Martin Kokonya ENERGY PROJECTS IDENTIICATION AND ANALYSIS TOOLS ADB FINESSE Training Course on Renewable Energy and Energy Efficiency for Poverty Reduction.
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
The Future of Energy Fred Loxsom Eastern Connecticut State University.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
Lidzbark Warmiński heating plant in RETScreen Software Justyna Pawilonis 28 March 2007 Lidzbark Warmiński.
Distributed Generation Technologies A Global Perspective NSF Workshop on Sustainable Energy Systems Professor Saifur Rahman Director Alexandria Research.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Taking the Lead: State Innovations to Reduce Greenhouse Gases Bill Becker STAPPA/ALAPCO February 28, 2002.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
Energy Commission Ministry of Economic Affairs May 2004 Financing Renewable Energy Development in Chinese Taipei.
El Gallo Hydroelectricity Project PDD Analysis
Introduction to Clean Energy Project Analysis © Minister of Natural Resources Canada 2001 – “Clean Energy Project Analysis” is a case-study based.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
An Overview of the Technology and Economics of Offshore Wind Farms
CONCERTO Premium Performance indicators of energy supply units Michael Kleber 23 October Brussels.
Engineering, Policy, Finance
Impact of Carbon Finance on Project Financing Prototype Carbon Fund April 17, 2002.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
Encourage the trade of Energy Efficient Goods Implication for Climate Change September 23, 2009.
Viability of Carbon Capture and Sequestration Retrofits for Existing Coal- fired Power Plants under an Emission Trading Scheme CEDM Annual Meeting May.
Clean Energy Project Analysis Course
Utility-Scale Turbine
“Life Cycle Assessments of Wind Energy and Other Renewables”…
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
No out of pocket cost No payback period Generate $$$ in energy savings Eliminate your electric bill Give you money annually to spend on other things.
Presentation transcript:

Renewable Energy Project Analysis Course - Module 1 Renewable Energy Project Analysis with RETScreen® Software Renewable Energy Project Analysis Course - Module 1 Energy Model Cost Analysis GHG Analysis Financial Summary Cash Flow Graph © Minister of Natural Resources Canada 2001 – 2002.

Objectives Illustrate role of preliminary feasibility studies Demonstrate how the RETScreen® software works Show how RETScreen® makes it easier to help identify & assess potential projects © Minister of Natural Resources Canada 2001 – 2002.

Development & Engineering Construction & Commissioning Energy Project Implementation Process Pre-feasibility Analysis Feasibility Analysis Development & Engineering Significant barrier RE projects not being considered up-front! Construction & Commissioning © Minister of Natural Resources Canada 2001 – 2002.

Questions What is an acceptable level of accuracy for project cost estimates? How much do these studies typically cost? © Minister of Natural Resources Canada 2001 – 2002.

Accuracy vs. Investment Cost Dilemma $100 to $1,000,000!

When should RE technologies be assessed? Need for energy system New construction or planned renovation High conventional energy costs Interest by key stakeholders Approvals possible Funding & financing accessible Good local RE resource, etc. Pre-feasibility Analysis Feasibility Analysis Preliminary feasibility studies © Minister of Natural Resources Canada 2001 – 2002.

Project Viability (Wind Example) Depends on Several Factors RE resource available at project site (e.g. wind speed) Equipment performance (e.g. wind turbine power curve) Initial project costs (e.g. wind turbines, towers, engineering) “Base case” credits (e.g. diesel generators for remote sites) On-going and periodic project costs (e.g. cleaning of wind turbine blades) Wind Turbine & Tower © Minister of Natural Resources Canada 2001 – 2002.

Project Viability Depends on Several Factors - cont. Avoided cost of energy (e.g. wholesale electricity price) Financing (e.g. debt ratio & length, interest rate) Taxes on equipment & income (or savings) Environmental characteristics of energy displaced (e.g. coal, natural gas, oil, large hydro, nuclear) Environmental credits and/or subsidies (e.g. greenpower rates, GHG credits, grants) Decision-maker’s definition of cost-effective (e.g. payback period, IRR, NPV, RE production costs) © Minister of Natural Resources Canada 2001 – 2002.

Why Use RETScreen®? Simplifies preliminary evaluations Requires relatively small amounts of information Calculates key technical and financial viability indicators automatically Costs 1/10th the amount of other assessment methods Standardized procedures allow objective comparisons Increases potential for successful RE project implementation © Minister of Natural Resources Canada 2001 – 2002.

Mean daily global radiation in the plane of the PV array RETScreen® Validation - Example Accuracy of Solar Resource Tilt-up Model within 7% ! Iqaluit, NT 90º Array Tilt Mean daily global radiation in the plane of the PV array Measured Data Calculated Data Source: Thevenard, et al, 1997

RETScreen® Software Demonstration Generic features Models standardised Cell colour coding On-line manual Product data Cost data & currencies Weather data ground sites satellites Financial analysis method Wind energy project example

Cell Colour Coding © Minister of Natural Resources Canada 2001 – 2002.

Yellowknife School Solarwall Under Construction RETScreen® Software Financial Analysis Method Comparison: Base Case vs. Proposed Case Conventional system vs. renewable energy system Example: Standard building cladding (siding) and a natural gas fired air heater vs. Solarwall cladding with solar air heating plus the conventional natural gas fired air heater Yellowknife School Solarwall Under Construction Photo Credit: Arctic Energy Alliance © Minister of Natural Resources Canada 2001 – 2002.

Software Demo 20 MW Wind Energy Project Input/Output (RETScreen®) Project location: Wind speed: GHG emissions reduction: Wind turbine cost: RE production credit: GHG credit (coal plant): Debt term: Positive cash flow: Return on investment: Scenario #1 (Merchant Plant) Calgary, AB 4.4 m/s 25,123 tCO2/yr $1,200/kW $0/kWh $0/ton 10 years 52 years - 6.4% Scenario # 2 (Green Power Plant) Pincher Creek, AB Lethbridge  7.0 m/s  63,486 tCO2/yr  $1,000/kW  $0.025/kWh  $5/ton  15 years 5.5 years 22.0% © Minister of Natural Resources Canada 2001 – 2002.

Software Demo Scenario 1 (Merchant Plant) Calgary, AB 4.4 m/s $1,200/kW 25,123 tCO2/yr $0/kWh $0/ton 10 years 52 years - 6.4% © Minister of Natural Resources Canada 2001 – 2002.

Software Demo Wind Speed & GHG Emission Reduction Scenario # 1a (Green Power Plant) Pincher Creek, AB Lethbridge  7.0 m/s 63,486 tCO2/yr 18.8 years 4.2% © Minister of Natural Resources Canada 2001 – 2002.

Software Demo Wind Turbine Cost Scenario # 1b $1,000/kW 17.0 years 6.0% © Minister of Natural Resources Canada 2001 – 2002.

Software Demo RE Production Credit Scenario # 1c $0.025/kWh 10.3 years 17.1% © Minister of Natural Resources Canada 2001 – 2002.

Software Demo GHG Emissions Credit Scenario # 1d $5/ton 7.9 years 19.5% © Minister of Natural Resources Canada 2001 – 2002.

Software Demo Debt Term Scenario # 2 15 years 5.5 years 22.0% © Minister of Natural Resources Canada 2001 – 2002.

Questions? © Minister of Natural Resources Canada 2001 – 2002.