Quality management systems – Requirements

Slides:



Advertisements
Similar presentations
Transition from Q1- 8th to Q1- 9th edition
Advertisements

Environmental Management System (EMS)
Understanding the Requirements Qimpro Standards Organization
ISO 9001: Countdown to 2015 Presented by Ellen Diggs Ellen Diggs Consulting February 11, 2015 It’s Not Just for Manufacturing Anymore!
Draft BY QI organization June 2014
ISO 9001 : 2000.
Preparing for Quality System Certification
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
ISO 9001:2015 “Risk Based Thinking”
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
ISO 9001:2015 “Risk Based Thinking”
4. Quality Management System (QMS)
4. Quality Management System (QMS)
Welcome ISO9001:2000 Foundation Workshop.
Medicare Certification Systems Thilak Wickremasinghe, Director/CEO Sri Lanka Accreditation Board.
Fundamentals of ISO.
Effectively applying ISO9001:2000 clauses 5 and 8
An Overview of the International Quality Management Standard
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Continual Service Improvement Process
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Introduction to ISO 9001:2000.
ISO 14001:2004, Environmental Management System
Visit us at E mail: Tele:
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
a guidance to conversion
GOV 2015 Slide 1 Topics of Interest for Accredited Laboratories ISO 9001 Changes that may Impact ISO Rita D’Angelo AFDO San Diego, March, 2015 D’Angelo.
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
QUALITY MANAGEMENT STATEMENT
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
ISO, QMS & CIR Awareness 2013.
ISO 9001:2015 – how to use TRIZ for QMS design and improvement
QOS_ISO/ TS_20021 BSC Balanced ScoreCard QOS Quality Operating System.
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
The common structure and ISO 9001:2015 additions
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
ISO 9001:2015 Risk-based thinking
ISO : 9000.
IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.
ISO-9001:2015 Where we have been and where we are going.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Presentation on Quality management systems Presented by: Razeena Ameen Roll no BS(IT) 7 th.
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
R equirements of I SO Clause 5 5. Management responsibility  5.1 Management commitment -Top management shall provide evidence of its commitment.
ISO 9001:2015 Risk-based thinking
ISO 9001:2015 Risk-based thinking
GS-R-3 vs. ISO 9001:2008 Requirements - 4
ISO 9001:2015 The process approach
Fundamentals of ISO.
ISO 9001:2015 The process approach
Quality Management Systems – Requirements
ISO 9001:2015 versus ISO 9001:2008 And ISO 9000:2015 – Fundamentals and vocabulary versus ISO 9000:2005.
Agenda Who are we? 1 Introductions Journey so far 2
Quality Department
ISO 9001:2015 Risk-based thinking
ISO 9001:2015 Risk-based thinking
ISO 9001:2008 Quality Management Systems
ISO-9001:2000 Quality Management Systems
Nonconformity Writing
Presentation transcript:

Quality management systems – Requirements 6 Planning 6.1 Actions to address risks and opportunities 6.2 Quality objectives and planning to achieve them 6.3 Planning of changes In Clause 9: the organization is required to consider risks and opportunities when determining what needs to be monitored, measured, analyzed and evaluated In Clause 4: the organization is required to determine risks that can affect its ability to meet objectives” In Clause 6: the organization is required to plan and take action to address risks and opportunities Risk The concept of “Risk” is emphasized in new edition of ISO 9001, especially when used in relation to function of organizational planning. Evaluation of risk; Planning for risk; What is acceptable? What is unacceptable? What is the probability? What is severity? How to avoid, mitigate or eliminate risk? Opportunities Encountered problems can be considered as an opportunity for improvement. Of course there are other ways to find opportunities. We can use special tools like SWOT analysis to list both opportunities and risks (see example in chapter 5). To implement requirements in clause 6.1 we can use different tools like SWOT for identification of risk and opportunities, FMEA to define actions to avoid, mitigate or eliminate risk or some other tool. In Clause 5: top management are required to commit to ensuring Clause 4 is followed In Clause 8: the organization is required to have processes which identify and address risk in its operations In Clause 10: the organization is required to improve by responding to changes in risk and opportunities

6.1 Inventive principles that address risk and risk based thinking There are several inventive principles in TRIZ that address risk and risk based thinking: #9 Preliminary Anti-action (failure analysis and prevention techniques); #10 Preliminary action (preparing in advance like preventive maintenance); #11 Beforehand Cushioning (prepare emergency beforehand to increase reliability of the system); #22 Blessing in Disguise (how to avoid, block or eliminate effects of harmful functions); #39 Inert Atmosphere (i.e. risk based audit); #40 Composite materials (dealing with risk using combination of different tools). One of very useful TRIZ tools is Anticipatory Failure Determination (AFD)which is a tool for analyzing, predicting and eliminating failures in systems, products, and processes.  References: Svetlana Visnepolschi, How to Deal with Failures (The Smart Way), 2008-2010 Ideation International Inc., http://whereinnovationbegins.net/afd/AFD-intro-20.pdf Stan Kaplan, Svetlana Visnepolschi, Boris Zlotin and Alla Zusman, New Tools for Failure and Risk Analysis Anticipatory Failure Determination (AFD) and the Theory of Scenario Structuring, Ideation International Inc. 2005, ISBN 1-928747-0-51, http://www.ideationtriz.com/new/materials/AFDNewToolsbook.pdf Philip B. Crosby explaining what should top management do for reliable organization

TRIZ tools for RISK management References: Svetlana Visnepolschi, How to Deal with Failures (The Smart Way), 2008-2010 Ideation International Inc., http://whereinnovationbegins.net/afd/AFD-intro-20.pdf Stan Kaplan, Svetlana Visnepolschi, Boris Zlotin and Alla Zusman, New Tools for Failure and Risk Analysis Anticipatory Failure Determination (AFD) and the Theory of Scenario Structuring, Ideation International Inc. 2005, ISBN 1-928747-0-51, http://www.ideationtriz.com/new/materials/AFDNewToolsbook.pdf Separate conflicting requirements using “SEPARATION PRINCIPLES” “TRIM” a system of unnecessary elements (less parts, higher reliability of a system) Use “Anticipatory Failure Determination “(AFD) tool to identify possible failure points in a system.

EXAMPLE: how to reduce risk of Alcohol related traffic fatalities Solution could be: DON’T DRINK AND DRIVE Example above shows how to use segmentation principles to separate causes of problem and how to identify which inventive principles can be used as sources for solution. Select separation between conditions principle These inventive principles have been used by inventors to solve similar problems.

6.2 Quality objectives and planning to achieve them We are going to show how QMS operates on strategic and operational level using PDCA approach. Each management level is using its’ own PDCA loop. Both loops are connected and synchronized by information exchange.

P D C A QMS Top management Process owners Plan: establish the objectives of the system and its processes, and the resources needed to deliver results in accordance with customers' requirements and the organization's policies;

P D C A QMS Top management Process owners Do: implement what was planned;

P D C A QMS Top management Process owners Check: monitor and (where applicable) measure processes and the resulting products and services against policies, objectives and requirements and report the results;

P D C A QMS Top management Process owners Act: take actions to improve performance, as necessary.

Business plan with quality objectives QMS Top management Process owners 5.2 Quality policy 8.1 Target values P 6.1 and 6.2 Business plan with quality objectives 8.1 Action plan 6.1 Quality plan Actions FMEA, SWOT D Top management shall establish, implement and maintain a quality policy and establish quality objectives at relevant functions, levels and processes needed for the quality management system. C A

Business plan with quality objectives QMS Top management Process owners 5.2 Quality policy 8.1 Target values P 6.1 and 6.2 Business plan with quality objectives 8.1 Action plan 6.1 Quality plan Actions FMEA, SWOT D The organization shall plan actions to address these risks and opportunities. C A

P D C A QMS Top management Process owners Quality policy Target values 5.2 Quality policy 8.1 Target values P 6.1 and 6.2 Business plan with quality objectives 8.1 Action plan Actions 6.1 FMEA, SWOT Quality plan Managing organization according to Quality policy and objectives D 8.2 to 8.5 Operations as planned The organization shall plan, implement and control the processes needed to meet the requirements for the provision of products and services C A

P D C A QMS Top management Process owners Quality policy Target values 5.2 Quality policy 8.1 Target values P The organization shall implement planned arrangements, at appropriate stages, to verify that the product and service requirements have been met and control nonconforming output. 6.1 and 6.2 Business plan with quality objectives 10.2 8.1 Corrective actions Action plan Actions 6.1 FMEA, SWOT Quality plan 9.1.3 Managing organization according to Quality policy and objectives Analyzing data D 8.2 to 8.5 8.7 Operations as planned Control of nonconformities Check 8.6 Check Nonconformance C 9.2 Internal audits A Customers

P D C A QMS Top management Process owners Quality policy Target values 5.2 Quality policy 8.1 Target values P 6.1 and 6.2 Business plan with quality objectives 10.2 8.1 Corrective actions Action plan Top management shall review the organization's QMS, at planned Intervals. Actions 6.1 FMEA, SWOT 6.1 Quality plan 9.1.3 Managing organization according to Quality policy and objectives Analyzing data D 8.2 to 8.5 8.7 Operations as planned Control of nonconformities Check 8.6 Check Nonconformance C 9.2 Internal audits 9.3 Management review Analyzing results and action taking A Customers 9.3.3 9.1.2

P D C A QMS Top management Process owners Quality policy Target values 5.2 Quality policy 8.1 Target values P 6.1 and 6.2 Business plan with quality objectives 10.2 8.1 Corrective actions Action plan Actions 6.1 FMEA, SWOT Quality plan 9.1.3 Managing organization according to Quality policy and objectives Analyzing data D 8.2 to 8.5 8.7 Operations as planned Control of nonconformities Check 8.6 Check Nonconformance C 9.2 Internal audits 9.3 Management review Analyzing results and action taking A Customers 9.3.3 9.1.2

Practical example PLAN DO CHECK ACT Company owners Top management Process owners Project manager and experts Corrective & preventive actions Quality policy C Business plan with quality objectives A NOT OK PLAN Approval Targets Analysis of NC OK Approved business plan Process plan Action plan Work according to plan Work according to plan DO Work according to plan Non conformance Checking Checking Quarterly Checking monthly CHECK Prototype production (vendor) Audit report Auditing Non conformance C A Checking Analyzing results Monthly Quarterly Customer Annual report Non conformance ACT Annual management review Checking Customer satisfaction feedback Analysis of customer perception of quality