MEPAG September 2010 Doug McCuistion Director, Mars Exploration Program.

Slides:



Advertisements
Similar presentations
2013 Key Issues Review: Enabling Sustained Deep Space Exploration with a Broad Vision Congressional Visits Day Preparatory Briefing Teleconferences February.
Advertisements

Why Are We Exploring Space? What’s Up At NASA? An overview of NASA’s Plans and some really cool stuff happening in a solar system near you.
Space Technology Programs James Reuther Office of the Chief Technologist March 28, 2012 Office of the Chief Technologist.
NASA Mission Directorates. 0 NASA's mission is to pioneer future space exploration, scientific discovery, and aeronautics research. NASA’s Mission.
1 MEPAG 16 June 2011, Lisbon (P) J. Vago D. McCuistion Joint Mars Programme Report Joint Rover ?
1 Review of US Human Space Flight Plans Committee Evaluation Measures and Criteria for Humans Spaceflight Options 12 August 2009.
National Aeronautics and Space Administration Commercial Crew and Cargo Program Overview June 17, 2009 Doug Cooke.
International Space Station: National Laboratory Development Brad Carpenter Space Operations Mission Directorate NASA Headquarters.
NASA AGENCY REPORT Dr. Eric J. Lindstrom Physical Oceanography Program Scientist Earth Science Division Science Mission Directorate MARCH 12, 2007.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
NASA_G_O_02_09_05.ppt 1 National Goals and Objectives National Goal To advance U.S. scientific, security, and economic interests through a robust space.
1 ExoMars Programmatic situation December 2014 Rolf de Groot Head of Robotic Exploration Coordination Office ESWT#7 meeting, 9-10 December 2014, Altec,
Joel Yudai.  Mission is to pioneer the future in:  Space exploration.  Scientific discovery.  Aeronautics research.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
Program Status Physics of the Cosmos Program (PCOS) Cosmic Origins Program (COR) M. Ahmed Briefing to the PhysPAG January 8, 2012 AAS Meeting, Austin Texas.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
Presented to the 9 th European Interparliamentary Space Conference by Dr. Bill Barry NASA European Representative October 9, 2007 International Cooperation.
Proposal for Governance Review Wednesday, 29 July 2015 Steven Ponnoosamy, Executive Special Projects Assistant - Governance Proposal for Governance Review.
The Only Government-wide Forum for Technology Transfer FLC Washington DC Office Gary K. Jones FLC Washington DC Rep FLC Mid-Atlantic Regional Meeting Rocky.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California Mars Exploration Directorate.
Future Space Exploration A Summary of “The Global Exploration Roadmap”, International Space Exploration Coordination Group, August 2013 Summarized by:
The ISECG Global Exploration Roadmap Status update at Target NEO2 Workshop July 9, 2013 NASA/Kathy Laurini Human Exploration & Ops Mission Directorate.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
IMARS History and Phase II Overview Presented to MEPAG 13 May 2014 L. May, NASA HQ NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted.
Commercial Space Vehicles Lessons Learned Needs Workshop Bette Siegel, Ph.D. ESMD Bette Siegel, Ph.D. ESMD September 18, 2006.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
2014 Key Issues Review: Ensuring a Robust U.S. Human Spaceflight Program Congressional Visits Day Preparatory Briefing Teleconferences February 12, 19,
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
Mars Exploration Program Science MEPAG March 17, 2010 Michael Meyer Lead Scientist.
Mars Exploration Program Response to: Vision and Voyages for Planetary Science in the Decade Michael Meyer MEPAG June 2011 Lead Scientist, Mars.
Exploration of Mars By: Micah Cluey. Facts ● The exploration of mars has taken place over hundreds of years, beginning in earnest with the invention and.
MATT Report Feb. 20, Philip Christensen (Chair) Lars Borg (ND-SAG Co-Chair) Wendy Calvin (MSO SAG Chair) Mike Carr Dave Des Marais (ND-SAG Co-Chair)
Probabilistic Technology Initiative for NASA Pam Caruso Technical Assistant to the Director, Engineering NASA/Marshall Space Flight Center Presented to.
America will send a new generation of explorers to the moon aboard NASA’s Orion crew exploration vehicle. After that, on to MARS!!!
Constellation Space Transportation Planning Office July 30, 2009.
MEPAG September 30, 2010 Michael Meyer Lead Scientist Mars Exploration Program.
Kiyoshi Higuchi Executive Director Japan Aerospace Exploration Agency (JAXA) JAXA Space transportation systems.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
The Mars Exploration Program
PROPOSED 2018 Joint Rover Mission Plans for Proposed 2018 NASA & ESA Joint Rover Mission Landing Site Selection Matt Golombek Mars Exploration Program.
MEPAG July 2009 Doug McCuistion Director, Mars Exploration Program.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
LISA News from ESA O. Jennrich LISA Project Scientist.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
Goals for this Meeting: Day 1 Day 2 Update the community on progress in the exploration of Mars, including NASA and the European Space Agency (missions.
0 Space Exploration and International Cooperation Gilbert R. Kirkham Office of External Relations June 2004.
MEPAG Meeting October 4, 2012 Monrovia, CA Dave Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
An Early Release Science Program Janice C. Lee STScI Science Mission Office JWST Science Working Group Meeting 29 April 2015.
NOAA Fisheries Update MAFAC Meeting Paul Doremus DAA for Operations September 23, 2014.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
MEPAG: Action Items, Forward Planning Jack Mustard, MEPAG Chair MRO HiRISE / U. Arizona / JPL / NASA NOTE ADDED BY JPL WEBMASTER: This document was prepared.
Jim Bell Cornell University The Planetary Society July 30, 2009 Mars Exploration : Rationale and Principles for a Strategic Program Preliminary.
MEPAG October 4, 2012 Doug McCuistion Director, Mars Exploration Program NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
MEPAG Meeting February 27, 2013 web meeting David Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Demonstrating Success: NASA Performance and Results Mike A. McNeill Environmental Management Division NASA Headquarters.
Current and Future Studies Relevant to MEPAG David H. Smith Mars Program Analysis Group Silver Spring, Maryland 3 March 2016 NOTE ADDED BY JPL WEBMASTER:
The Global Exploration Roadmap Considerations on Life Support International Space Exploration Coordination Group (ISECG) Francois Spiero, CNES Co-chair,
National Goals and Objectives
E-Rare and IRDiRC: Future collaboration perspectives?
The ISECG Global Exploration Roadmap Status update at Target NEO2 Workshop July 9, 2013 NASA/Kathy Laurini Human Exploration & Ops Mission Directorate.
Return to The Moon: An International Perspective
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Visions and Voyages: The Planetary Decadal Survey
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

MEPAG September 2010 Doug McCuistion Director, Mars Exploration Program

Agenda The Budget –FY11 President’s Budget Status –MEP Budget Miscellaneous News NASA-ESA Partnership for Mars Exploration—where are we now?

The Budget The FY11 President’s Budget –NASA Appropriations Bill passed last night ISS extended to at least 2020 Additional Shuttle launch in CY11 Continues Orion crew capsule and a new Space Launch System ( tons to LEO) Create technology development program Pursue a commercial space flight capability $100M/year for a robotic human precursor program Science Program is basically stable –Slight increase for Planetary Science beginning in FY11 –Continued emphasis on international cooperation and collaboration Mars Program budget pressures continue, but outlook is much better than it has been in years! –MSL in FY11/12 –NLS-2 launch vehicle cost and performance –Earlier-than-usual milestones for 2016 and 2018 missions 3

All the Other News Fit to Print 4 Planetary Decadal Report –Report to reviewers—Sept/Oct –Report revisions—Nov-Jan ‘11 –Report approved for release by NRC—Jan/Feb –Embargoed report to NASA—late-February ‘11 –Public release—Brief report at LPSC, March 7, 2011 –Disseminate printed report—by August 31 st 2013 MAVEN going to Confirmation next week –Highly successful PDR in July 2016 orbiter AO selections announced August ’10 –Five instruments selected, including 1 European led –All instruments have significant international partnerships

All the Other News Fit to Print 5 Discovery AO –Step 1 selection announcements NLT April ’11 –Selections for 9 month Step 1’s Key personnel changes in MEP –Mark Dahl retired—Dave Lavery picked up MSL as Program Executive –George Tahu joined MEP as 2018 mission Program Executive –Mary Voytek working with Michael Meyer on MSL –New Program Scientist in MEP should be aboard soon! Time for semi-annual MEP Program Status/Implementation Review –Required for all program’s continuation by NASA –Kick-off begun –Formal Review and briefings after Decadal Report release

Roadmap to PSR/PIR Aug Sep Oct Nov Dec Jan Feb Mar April May Draft JPEP & MOU to ESA  NASA-ESA Bi-Lat Initiate PCA/ Program Plan Updates President’s ‘12 Budget Released Finalize JPEP, final MOU draft Complete update of PCA/Program Plan Decadal Survey Release Program Implementation Review DPMC APMC  JPEP = Joint Program Executive Plan PCA = Program Commitment Authorization DPMC = Directorate Program Management Council APMC = Agency Program Management Council 

7 Mars as Art 1 Rayburn Congressional (House) Office Building 546 Attendees 7 Congressional members 52% Congressional staff Mars as Art-II Submissions by Oct 8 th

Planned Joint NASA-ESA Mars Initiative Portfolio Overview MRO Mars Express Collaboration Mars Express Collaboration Odyssey MER Operational Phoenix (completed) Phoenix (completed) Mars Science Laboratory MAVEN Aeronomy Orbiter "For Planning Purposes Only" & Beyond The Era of Mars Sample Return begins The Era of Mars Sample Return begins ESA—NASA ExoMars Trace Gas Orbiter ESA—NASA ExoMars Trace Gas Orbiter NASA—ESA Rovers (Astrobiology/ Sample Return Cache) NASA—ESA Rovers (Astrobiology/ Sample Return Cache) NASA-ESA Joint Mars Initiative ESA—EDL Demonstrator

NASA-ESA Joint Program Progress Management structure in place –Joint Mars Executive Board—meets regularly –Joint Engineering Working Groups for future mission concepts –Bi-Lateral next week (Dr. Southwood and Dr. Weiler)—meets twice yearly 2016 mission orbiter instruments selected! –ESA’s demo lander AO possible in early 2011—US will support science participation –Project office established in Mars Program Office at JPL Overall governance, documentation, review and approval processes, etc., maturing –Operating under an approved LOA –MOU nearly final –Joint Executive Program Plan (JPEP) in negotiation –The joint Program will be reviewed in PSR/PIR for NASA APMC approval in May ‘10 MSR working group recently established

Joint Mars Program Authority and Management Structure 10 Joint Mars Executive Board Science Mission Directorate Planetary Science Division Science Mission Directorate Planetary Science Division Science and Robotic Exploration Directorate Science and Robotic Exploration Directorate NASA ESA Mars Exploration Program Director Lead Scientist for Mars Exploration Lead Scientist for Mars Exploration Mars Program Manager Robotic Exploration Coordination Office Head Robotic Exploration Coordination Office Head Mars Lead Scientist Science & Robotic Exploration Projects Department Manager Project Managers Doug McCuistion Michael Meyer Fuk Li Jorge Vago (acting) Augustin Chicarro John Ellwood

ESA-NASA MOU ** (to supercede existing LOA & TAAs) MEP PCA* MEP Program Plan* NASA Program-Level Requirements (L1) Joint Mars Exploration Program Executive Plan** Mission-Level Requirements & Implementation Plans Other Project Documentation ESA Project Implementation Plans Joint Mars Program Governance Documentation Declaration on the European Space Exploration Programme Aurora NASA ESA * Existing documents to be updated with new program directions and joint implementation mode ** Currently in the process of negotiating with ESA

Joint Program Summary While the FY11 budget isn’t approved yet, no radical changes are expected for MEP –Continued MSL budget threats do exist for 2011 launch –Launch vehicle costs are going up—and performance is going down Partnering with ESA enables the next phase of Mars scientific exploration –A strong and productive partnership is developing! –2016 and 2018 mission objectives and roles are defined and activities proceeding rapidly –Lays the groundwork to bring a joint/international sample return mission to reality There are still challenges for the joint program –Maintaining partnership after first 2 missions through Mars Sample Return –Meshing different agency cultures –Completing 2016 early NASA milestones since ESA has a “head start” –Completing the MOU and JPEP is critical for stability Agency approval will come with Decadal Release and PSR/PIR