IDE DCS development overview Ewa Stanecka, ID Week, CERN 29.10.2013.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

The Control System for the ATLAS Pixel Detector
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
André Augustinus 16 June 2003 DCS Workshop Safety.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
FwSPY and UNICOS-CPC Benjamin Bradu Giulio Morpurgo CERN, EN-ICE May2015.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
ID Organisation 2009 P. Wells (Project Leader) A. Catinaccio (Project Engineer) (A. Cattai) + ? (ATLAS) Thermal management DCS & online monitoring S. D’Auria.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
IDE DCS developments Ewa Stanecka INP Kraków ID Week,
ATLAS Tracker Group PPD Staff Talk 28/Nov/2005 Steve McMahon 1 Steve McMahon : An Introduction Backgrounds and Pre-History –Imperial College London
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
LHC Collimators Low Level Control Commissioning Status A Masi, LHC Collimators Low Level Control Commissioning Status LHC Collimators Low Level Control.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Chiller control system Lukasz Zwalinski – PH/DT.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
60kW Thermosiphon control system
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Status of the DCS Richard Brenner (Uppsala University) " Structure of the DCS " Cabling of DCS sensors " Interlock " Status and near future plans.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
CERN Summerschool 2007 Monitor and Control of the CANbus power supplies of ATLAS’ MDTs Wilco Koppert (UU)
S A Griffiths CM42 June 2015 Electrical & Control.
- My application works like a dream…does it. -No prob, MOON is here. F
Institute of Nuclear Physics Polish Academy of Sciences
CV PVSS project architecture
ATLAS MDT HV – LV Detector Control System (DCS)
TPC Detector Control System
Presentation transcript:

IDE DCS development overview Ewa Stanecka, ID Week, CERN

Overview  Actions in 2013  Thermal enclosure heaters control system upgrade  IDE DCS upgrade  SR1 IDE DCS test system  Plans for 2014  New systems integration  Thermosiphon  Sonar 10/29/20132E.Stanecka, ID Week

IDE DCS projects 10/29/2013E.Stanecka, ID Week3 ATLIDEEVCOOL  cooling plant  SCT & Pixel cooling ATLIDEEVENV  ID environment monitoring ATLIDETEH  thermal enclosure heater pads ATLIDEMAG  magnetic field monitoring ATLIDERAD  radiation monitoring ATLIDEBLM beam conditions IDE LCS:  overall FSM  beam monitoring  IDE racks monitoring  safety scripts ATLIDEBCM  beam conditions  luminosity ATLIDESNR - degassing - leak check - mass flowmeter

TEH  TEH control replaced with new one:  Mechanical improvements to card/backplane  Improved remote control and interlock  May/June > EC C and EC A is commissioned and tested  each „heater pad group” was switched separately to check mapping  All left for ~ 30min in „auto” mode  Very smooth start for heater pads that were working during normal detector operation  Software/hardware mapping verified and corrected for pads that were not in use so far  August 2013 –> Consolidation of TEH pads/sensor connections on PP1 side C, recovered 15 out of 17 bad pad/sensor connections.  Need to implement recovered channels into TEH DCS configuration  Tuning PID parameters for operation – to be done with cooling operational 10/29/20134E.Stanecka, ID Week

DCS upgrade  IDE DCS follows ATLAS DCS LS1 upgrade plan, that includes important changes both in hardware and in software:  New computers DELL PowerEdge R610  installed 6 new machines in P1, old machines kept until new system commissioning  OS system upgrade: Windows NT to Linux  PVSS-> WinCC 3.11  CAN bus interfaces: KVASER->Systec  OPC DA server -> OPC UA server  We plan to finish upgrade of IDE DCS before end of 2013  Concern: we have non standard parts (e.g. ELMBs) in IDE, need to test carefully 10/29/20135E.Stanecka, ID Week

IDE DCS test system in SR1 TaskStatus TEH crate installationdone OS system, WinCC + OPC UA installationdone Systec box stand alone testdone Systec box test with TEH hardwareNovember 2013 Script for config file for the new OPC UANovember 2013 Full system testsNovember 2013 System test for TEH system installed crate installed To test full DCS upgrade procedure for TEH system, which uses non-standard ELMBs. 10/29/20136E.Stanecka, ID Week

New systems integration  Thermosiphon  Prepare panels for monitoring thermosiphon  detector parts remain unchanged, the same control on single line level  monitoring of the plant changes  Thermosiphon will be monitored from the local server based on UNICOS CPC 6 framework of EN/ICE  These local data servers will be located in CCC  ID DCS and Thermosiphon data exchange via DIP (?)  A few crucial parameters will be monitored directly from PLC  Work to be done in IDE DCS  Exercise communication with CCC and PLC  define list of parameters to be exchanged and operation procedures  replace “compressor module” by “thermosiphon module”, panels etc.  Sonar – will be integrated in IDE DCS for the first time. Still some development needed in particular implementation of Final Machine State. For more details see Greg’s talk. 10/29/20137E.Stanecka, ID Week

Plans for 2014  Early 2014 – integration of Sonar project into IDE and ATLAS FSM  Adjust mapping of environmental sensors in DCS configurations  Prepare for operation with cooling in summer 2014  Optimization, consolidation, code clean-up on going throughout LS1  Very detailed list of tasks can be consulted here: S1 10/29/20138E.Stanecka, ID Week

Summary  IDE DCS focuses now to finish upgrade by the end of 2013  Integrate new systems thermosiphon and sonar early 2014  TEH tuning with cooling start-up in summer 2014  Continuous efforts on system consolidation and improvements 10/29/20139E.Stanecka, ID Week