Geostatistics and maps A tentative plan for a project European Forum for Geostatistics, October 2008.

Slides:



Advertisements
Similar presentations
How to form a consortium
Advertisements

The NATURE–SDIplus project Best Practice Network for SDI in Nature Conservation Co-funded by the Community Programme eContentplus ECP-2007-GEO Co-funded.
C Introduction to the Geostat project Session on User needs (Geostat workshop in Bled 1-3 october 2008) Lars H. Backer
02-Oct-2008 European Forum for GeoStatistics 2008 in Bled Concept for an Integrated Web Solution / an Infrastructure for Geostatistics (Subproject 3)
Conversions from national grid data to harmonized European grid data EFGS Lisbon October 2011 Production and challenges Rina Tammisto, Senior Statistician,
Conclusions & Thoughts on The Future of Geo-Statistics Lars H. Backer.
European Forum for GeoStatistics EFGS – organisational matters.
Conclusions? Lars H. Backer. Framework Programs and Projects –INSPIRE Directive The Nordic Grid Challenge –The Nordic Consortium and the eContent projects.
The EFGS 2009 Meeting in Den Haag 5-7 October /05/2015Lars H. Backer1.
Co-funded by the European Community eContentplus programme The NATURE-SDI plus and the VESTA-GIS project [G.Saio] [GISIG]
Seminar on “Spatial statistics” Session 1: Use of statistical grids in official statistics Conference of European Statisticians, Paris, Fifty-eighth plenary.
1 The GEOSTAT project Vilni Verner Holst Bloch MSc. landscape ecology and natural resources Statistics Norway Otervegen 23 N Kongsvinger Tel : ++47.
1 REGIO gis The use of geostatistics for the analysis of Europe’s regions Hugo Poelman European Commission – DG Regional Policy
Exploring Europe's Television Heritage in Changing Contexts Connected to: Funded by the European Commission within the eContentplus programme
Discussion: Data Protection Call for a European Guideline on Thresholds (Rules of Confidentiality / Disclosure Control / Number Suppression / …) Ingrid.
MESH UK Workshop 19 October 2006 Introduction Dr Paul Gilliland Marine Policy Adviser and MESH Partner Lead Natural England.
1 Guidelines for production and steps towards harmonisation Marja Tammilehto-Luode Population Statistics Statistics Finland FI Statistics Finland.
1 The ESSnet project GEOSTAT 1A/B Vilni Verner Holst Bloch Coordinator of ESSnet project GEOSTAT 1A Statistics Norway Representing Census data in a European.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
Jenny Linnerud, 27/10/2011, Cologne1 ESSnet CORE Common Reference Environment ESSnet workshop in Cologne 27th and 28th of October 2011.
EUREKA UMBRELLA PROJECT: Technologies for a Sustainable and Competitive Construction Sector E! 3790 EUREKABUILD Closing EurekaBuild Achievements so far.
The EFGS project a common voluntary cooperation Vilni Verner Holst Bloch President of European Forum for Geostatistics Statistics Norway EFGS 2013 conference.
GSBPM as a framework for the production of spatial statistics Rina Tammisto 11 th October 2015 European Forum for Geography and Statistics.
Patrick MALLEJACQ ERA-NET ROAD II proposal Status as of 23 September 2008 CEDR TGR meeting 24 September 2008, Paris.
European population grids, from Models to Official Statistics Ekkehard Petri (Janusz Dygaszewicz)
EFGS in Den Haag1 ESSnet project GEOSTAT Work Package 1 Collection of User Needs.
PRODUCTION PROCESSES FOR A HARMONISED E UROPEAN POPULATION GRID Marja Tammilehto-Luode Rina Tammisto Statistics Finland October 2012European Forum.
An ESS strategy towards better integration of statistics and geography
1/21 EUROGI Extra Members’ Meeting Lisbon (PT), Workshop : “The future of the Data-Economy: Business strategies and models for spatial data.”
The EFGS project a common voluntary cooperation Vilni Verner Holst Bloch President of European Forum for Geostatistics Statistics Norway EFGS 2014 conference.
EFGS 2014 Krakow General assembly The EFGS Executive Team The European Forum for (the Integration of ) Geography and Statistics (EFGS) October The.
Market watch/Business report – Grid statistics Mr. Erik Sommer, EFGS Expert Group for Business Models, Denmark. European Forum for Geostatistics.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Generalisation for statistical thematic maps
Towards connecting geospatial information and statistical standards in statistical production: two cases from Statistics Finland Workshop on Integrating.
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
Eurostat D2 – Regional Indicators and Geographical Information
Meeting of the Working Party
GISCO Working Group March
Dissemination of results from 2010/2011 censuses
OBJECT-ORIENTED APPROACH TO OFFICIAL STATISTICS
Analysis of demographical and economical statistical data on the basis of a trans-national hierarchical grid Igor Kuzma Statistical Office of the Republic.
Closing session - Evaluation of the course
European Forum for GeoStatistics
Summing up - Tour de Table
The Tandem Consortium, M T-L
Ola Nordbeck Statistics Norway
GIS technology strategy of Statistics Finland
European Forum for Geostatistics
Work Package 2 - Geostatistics Marja Tammilehto-Luode
What are the priorities?
Survey among NSIs on participation in the GEOSTAT project
Report on the 2008 meeting in Bled
ITDG meeting of of October 2011
Case study Using proper technique for representing statistics on maps
GEOSTAT 1B – presentation of the call for proposals
Discussion Case study - mapping techniques
The bottom-up approach: Challenges in the production of statistical grid data Rina Tammisto European Forum for Geostatistics, Workshop 1- 3 October 2008.
What are the priorities?
The GEOSTAT project Work Package 2 Geostatistics Working Party/Meeting
Ola Erik Nordbeck Coordinator of ESSnet project GEOSTAT 1B
The European Location Framework: taking INSPIRE to the next level
Nordic Forum for Geo-Statistics 2007 meeting
The EFGS 2012 Prague Initiative
Workpackage Infrastructure
Requirements for the final reporting
GISCO working group meeting 2015
Item 9.6 Mainstreaming geo-statistics
eContentplus 2007 Work Programme
Presentation transcript:

Geostatistics and maps A tentative plan for a project European Forum for Geostatistics, October 2008

October 2008, Bled2Marja Tammilehto-Luode Geostat_Europe Project, Subproject 2(?) Geostatistics and maps Objective of the proposal Background to the proposal Expected Deliverables and Users of the Results Phases of the work Organisations involved and their roles Expected costs and duration of work

October 2008, Bled3Marja Tammilehto-Luode Objectives of proposal to develop an infrastructure for the compilation of small area statistics, to develop harmonised building blocks for small area and regional statistics to describe and harmonise methods for compilation of small area statistics to offer spatial statistics to meet the demands of the INSPIRE to develop common specifications for the production of harmonised, comparable spatial data -guidelines on the methods for producing the data, -descriptions of the production process, -descriptions of characteristics of the final dataset, -guidelines on data protection

October 2008, Bled4Marja Tammilehto-Luode Background to the Proposal Tandem project 2001, 2003: two major ways to compile grid based statistics aggregation and disaggregation methods it may be possible to produce grid data for the whole of Europe by developing and harmonising these two methods target: due regard to confidentiality, consistent and comparable European-wide territorial population data on different scales and territorial levels.

October 2008, Bled5Marja Tammilehto-Luode

October 2008, Bled6Marja Tammilehto-Luode Expected Deliverables and Users of the Results harmonised data specifications (with due regard to confidentiality) for aggregated and disaggregated grid data guidelines on aggregation and disaggregation methods specifications for the hybrid dataset a harmonised demographic dataset illustrations by maps on how to use the grid data.

October 2008, Bled7Marja Tammilehto-Luode Phases of the work Work package 1: Data specifications for harmonised dataset Work package 2: Solutions for data protection Work package 3: Disaggregation methods Work package 4: A hybrid dataset Work package 5: Maps (Illustrations)

October 2008, Bled8Marja Tammilehto-Luode Organisations involved Statistics Finland: The interim leader of Subproject 2, member of the Taskforce Statistics Austria: Member of the Taskforce Statistics Netherlands: Member of the Taskforce Statistics Slovenia: Member of the Taskforce Statistics Switzerland: Member of the Taskforce EC/JRC: Member of the Taskforce

October 2008, Bled9Marja Tammilehto-Luode Organisation of the project Executive team: project manager and leading partners of each work package A proposal for leading parteners: Work package 1: Data specifications for harmonised dataset, Statistics Finland, Rina Tammisto Work package 2: Solutions for data protection, Statistics Slovenia, Igor Kuzma Work package 3: Disaggregation methods, JRC, Javier Gallego Work package 4: A hybrid dataset, Statistics Netherlands, Niek van Leeuwen Work package 5: Maps (Illustrations), Statistics Austria, Ingrid Kaminger,

October 2008, Bled10Marja Tammilehto-Luode Human resources and duration of work A preliminary estimation 13 staff-months of professional work divided evenly among the work packages, with one month added for administrative work: WP 0 project management2 WP 1: Data specifications for harmonised dataset 2 WP 2: Solutions for data protection2 WP 3: Disaggregation methods2 WP 4: A hybrid dataset 2 WP 5: Maps (Illustrations)2 __________________________________________________________ 12 The duration of the work months.

October 2008, Bled11Marja Tammilehto-Luode Expected cost will be estimated after a consortium is established and project manager elected a rough estimate Euros

October 2008, Bled12Marja Tammilehto-Luode Next steps establish a consortium; project leader, leading partners make a work plan, each leading partner involved integrate the work plan to the GEOSTAT project make an application for a grant execute the action make a report, results available via web inform, communicate, contribute (a plan for dissemination of results)