Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
OSU meeting, 04/24/2003 Richard Kass1 Limited Streamer Tube Project Overview Richard Kass Ohio State University Introduction (why, who, what….) The big.
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Lab #3.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
RPC system cable routing Yang Changgen, Guan Mengyun IHEP, Beijing.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
October 13, 2009 Mark Kozlovsky1 Final Production Revision DECam Heater Controller System.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
January 15, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 H C A L HF Cable Plant Options HF Cable Plant Options December 22, 2010 T. Shaw.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
TIMING DETECTOR ELECTRONICS FRONT END ELECTRONICS - NINO JOSE DA SILVA –CT-PPS TIMING ENGINEERING REVIEW /
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Analog FE circuitry simulation
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Mini-drawers, FE-ASIC , Integrator
Electronics for RPC Upscope
LST Module Installation
Overview of T1 detector T1 is composed by 2 arms
University of California Los Angeles
RPC Electronics Overall system diagram Current status At detector
Limited Streamer Tube Project Summary
Presentation transcript:

Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus) -> see Mark’s report –Electronics (Angelo, Klaus) OSU designes HV board, Distribution board (both inside AL box) Angelo will bring 6 (8 if possible) input protection circuits for anode signals Angelo will modify one FE board to receive (negative) anode signals Two (fine pitch) signal cables from AL box to “mini crate” 75 ft of Amphenol/Spectra Strip received –With green (round) jacket, shielding –20 pairs –Sent to SLAC (Charlie) Kerpen HV cable is still not available. –SLAC (PCK) will try to obtain enough RPC HV cable for 8 HV lines from electronic hut to BaBar. Need to design HV transition box (8 short HV cables will be attached (soldered) to HV distribution PC board in AL box. Connect to long HV cables outside of magnet)

HV Distribution Board HV capacitors Cable Connector Anode signal readout Layout complete, 1 board for both tubes, Flat cable connector in hand Will be tested with OSU tubes Send to Princeton (or SLAC if too late)

Signal Distribution Board Allow for: baseline (single ended), pseudo-differental, and fully differential configuration Layout (almost) complete Receive cathode signals (16) via short twisted pair stub cables 16 ch. Output (fine pitch twisted flat cable)

What will we need? 8 HV channels with current monitoring, overcurrent trip HV cables, HV connector box Low voltage: +/-5 V, 300 mA in AL box Low voltage: +/-5 V near mini crate (FE board, diff. Receiver) Install signal cables (on their way to Charlie) -> Need to identify the location of a suitable FEC crate! –This defines the location of the infrastructure connections in the AL box –Need this today! –Note: Anode and Phi signals, HV, low voltage and gas (in+out) will be all on the same side. The tubes will be shifted toward the other end of the AL box to make sufficient room for the infrastructure stuff. Coax cables from detector (mini crate location) to outside the shielding wall so that we can view signals with beams on