Virtual Analyser www.technologyedge.biz. What is it Have you ever faced an analyser failure that requires a plant shut down to repair & wished that there.

Slides:



Advertisements
Similar presentations
Copyright© 2014 Austin Analytics Group, LLC. Stand Alone System High Temperature System Hazardous Area System Universal/Remote Display System Copyright©
Advertisements

EPA Methods 3A, 6C, 7E, 10 & 20 Corrections to May 15, 2006 Final Rule That Updated the Methods That Updated the Methods Foston Curtis US EPA.
Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
SECTION 11 LEVEL B SUIT OUT. SECTION 12 AIR MONITORING.
PART 75 SPAN & RANGE Manuel J Oliva Clean Air Markets Division
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
Diesel Engine Major Monitors l Fuel System l Misfire l EGR System l Boost Pressure Control System California Environmental Protection Agency AIR RESOURCES.
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
RECLAIM Monitoring, Recordkeeping and Reporting (MRR)
Energy Efficiency and Intelligent Power Plants Rameshbabu R S 10 th May, 2006 The Center For Bits And Atoms MIT.
Summary of Heat Loss Calculations Assessing overall heating requirements for building (E) Component U-ValueAreaHeat Loss Rate (W o C -1 ) Walls U walls.
Proposed Amendments to Rule – Emissions from Gaseous- and Liquid- Fueled Internal Combustion Engines Presented at Southern California Gas Co. Seminar.
Why do we lose analyzer data? Monitor malfunction DAS malfunction Power outages Environmental problems Wildlife damage Vandalism Operator error.
Data QA/QC Techniques. Copyright VIM Technologies, Inc. All Rights Reserved. VIM’s 10-Step Program To Compliance Success 2.
Self-monitoring programme for a Swedish power plant Hans-Roland Lindgren Director Swedish EPA 1.
The ProRak™ Advantage An introduction to Hg Process Monitoring and Feedback Control.
A History and Status of CEMS Applications in USEPA Regulations Dale Evarts US EPA December 16, 2002 Better Air Quality in Asian Cities 2002
5 Gas Analysis Another Rainharbor Production 1997.
Air Quality Modeling for Teachers 1 PRESENTER: Robert R. Gotwals, Jr.. The Shodor Education Foundation, Inc. Ozone O3 creation normal decay depletion ~
08/06/02 Apex Instruments, Inc. Equipment Overview Typical Industries and Sources Tested using Apex Instruments Equipment Acid Plants Asphalt Plants Boilers.
© Copyright, Yorke Engineering, LLC 2008 SCAQMD Rule Compliance Steps and Strategies Judy Yorke and Bipul K. Saraf Yorke Engineering, LLC
Clean Air Markets Program Data
Approach of a UK auditor Paul Mudway Mudway Health, Safety & Environment.
Ensuring of Traceability
U NIVERSITY OF M INNESOTA Dept. of Environmental Health and Safety Hazard Analysis Process for Adding Amines to Steam System C. Moody,
Air Quality Governance in the ENPI East Countries Regulation of non-Annex I activities in the CR and UK Monika P ř ibylová.
Success of Market-Based Approaches The Success of Market-Based Approaches in Air Quality Management in the United States Kevin Rosseel Office of Atmospheric.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Enterprise PI - How do I manage all of this? Robert Raesemann J Jacksonville, FL.
Assessment of power grid elements technical condition using the example of a transformer State National Research Polytechnic University of Perm Anastasiia.
May 12th. 2011| 1| 1 New On Stack Emission Monitoring Technology
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Hardware Analyser vs Software Analyser
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
World Leaders in Combustion Management Solutions ModuleScreenshots Gas Setup Sampling The Mk7 E.G.A Cell Status Further Information.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
Proposed Engine Manufacturer Diagnostic (EMD) System Regulation Mobile Source Control Division California Air Resources Board May 20, 2004 Sacramento,
On-Board Diagnostics (OBD) II Regulatory Update Mobile Source Control Division California Air Resources Board April 25, 2002 Sacramento, California.
World Leaders in Combustion Management Solutions Remote Monitoring & Data Logging C.E.M.S I/O Modules DTI Autoflame Training,
On the Grid Soung Sik-Kim Chapter 29. Summary A chemical engineer Soung- Sik-Kim Describes optimizing the efficiency of coal-fired power plants Discusses.
IN-SITU ANALIZA GASOVA
3.0 Comprehensive Performance Audit Fossil Fuel Appliances Health & Safety 3.2.
Lancom 4 In Power and Boilers Derek Stuart. Lancom 4 In Power and Boilers Derek Stuart Combustion Theory In order to maximize the heat capture (efficiency)
Day 2 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Optimizing fuel flow in pulverized coal and biomass-fired boilers Malgorzata (Maggie) Wiatros-Motyka EUEC February 2016, San Diego, USA.
CLN emission reduction for non-DLE LM gas turbines Agenda 1.Introduction to VBR Turbine Partners 2.Two options to reduce emission levels of non-DLE LM.
RACT 2 – Source Testing and Monitoring Requirements Air Quality Technical Advisory Committee August 4, 2016 Harrisburg, PA Tom Wolf, GovernorPatrick McDonnell,
Complying with Periodic Emissions Monitoring Requirements
First in Service First in Value
System Design, Implementation and Review
Humidity Measurement Benefits in Power Plant Applications
Monitoring aspects of permits and inspections (1)
Instrument Maintenance
Quality Systems in a Production Facility
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Calibration Calibration of the analyzer establishes the relationship between actual pollutant concentration input and the analyzer response. Should be.
August 23, 2000 R.N. Dubois Dow Chemical
Training Module Presented by Steve Wright
Boiler Sheltered Initiative
Rob Dubois CPAC Workshop, Seattle, WA, May 5, 2005
Preparing for a Stack Test
Automobile Emission Gas Analysis Solution
Joint Venture between IEC and Dor Chemicals
Presentation transcript:

Virtual Analyser

What is it Have you ever faced an analyser failure that requires a plant shut down to repair & wished that there was a back up analyser Have you ever faced an analyser failure that requires a plant shut down to repair & wished that there was a back up analyser Do you regularly struggle with issues related to calibration gas, zero check, span check etc. Do you regularly struggle with issues related to calibration gas, zero check, span check etc. If yes, VA (Virtual Analyser) can solve these problems If yes, VA (Virtual Analyser) can solve these problems Contact:

What is it VA is a Patented Software which can “Calculate & Predict” the parameter to be measured without physically measuring it VA is a Patented Software which can “Calculate & Predict” the parameter to be measured without physically measuring it How does it work? How does it work? See the next slide for a summary See the next slide for a summary Or, if you want full technical details, you can look up Patent # 8,768,664 on the internet Or, if you want full technical details, you can look up Patent # 8,768,664 on the internet Contact:

How it works There are two examples on the next slides which explain how the VA can “calculate & predict” the parameter to be monitored There are two examples on the next slides which explain how the VA can “calculate & predict” the parameter to be monitored First example relates to O2 (Oxygen) analyser on a combustion source e.g. Boiler or Reformer First example relates to O2 (Oxygen) analyser on a combustion source e.g. Boiler or Reformer Second example related to NOx (Oxides of Nitrogen) analyser for environmental monitoring on a combustion source e.g. a Boiler or Reformer Second example related to NOx (Oxides of Nitrogen) analyser for environmental monitoring on a combustion source e.g. a Boiler or Reformer Contact:

Example-1 of VA Use O2 (Oxygen) Analysers are: Critical for combustion control Critical for combustion control Safety & efficiency critical Safety & efficiency critical Prone to drift, malfunction & frequent calibration Prone to drift, malfunction & frequent calibrationVA: Can do the job of an O2 analyser by using inputs on which combustion process is dependent Can do the job of an O2 analyser by using inputs on which combustion process is dependent Contact:

Example-1 of VA Use As you already know, combustion is dependent on following parameters e.g.: As you already know, combustion is dependent on following parameters e.g.: Fuel flow rate Fuel flow rate Air flow rate Air flow rate Combustion temperature Combustion temperature Changing these parameters results in changes in the combustion process and residual O2 in the stack Changing these parameters results in changes in the combustion process and residual O2 in the stack The VA uses these inputs and “calculates” the O2 The VA uses these inputs and “calculates” the O2 Contact:

Example-1 of VA Use This “calculated” O2 is calibrated against a primary O2 standard. This “calculated” O2 is calibrated against a primary O2 standard. Once this is done, the VA can safely & accurately tell the residual O2. Once this is done, the VA can safely & accurately tell the residual O2. Since the VA takes inputs of several parameters to calculate one output, it is vastly reliable & accurate. Since the VA takes inputs of several parameters to calculate one output, it is vastly reliable & accurate. If you already have a hardware O2 analyser, the VA can be used as a reference up to see when & if maintenance of O2 analyser is required. If you already have a hardware O2 analyser, the VA can be used as a reference up to see when & if maintenance of O2 analyser is required. Contact:

Example-2 of VA Use CEMS (Continuous Emissions Monitoring System) If you maintain a hardware CEMS for NOx, CO, CO2 etc., you already know that it’s a struggle to keep it running, see the next slide for details If you maintain a hardware CEMS for NOx, CO, CO2 etc., you already know that it’s a struggle to keep it running, see the next slide for details The VA can do the job of a CEMS without all the complications, see the next slide for details The VA can do the job of a CEMS without all the complications, see the next slide for details The VA when used in environmental compliance is called PEMS (Predictive Emissions Monitoring System) The VA when used in environmental compliance is called PEMS (Predictive Emissions Monitoring System) Contact:

To understand this part of the presentation, please: - Enable the slide show mode (press F5) - To move through the presentation you can right click your mouse OR use page-up/down OR use up/down arrows.

Stack NOx Pump Chiller Analyzer Combustion source Heated Sampled Line Analyzer House Air Conditioner Calibration Gas Cylinders (Daily Span/Zero Check) Flow rate Flow Monitor Hardware NOx ppm DAS (Data Acquisition System) DCSDAS DCS (Distributed Control System) Calibration gas NOx ng/J How hardware analyser works for NOx

DCS PIMS - NOx - CO - CO2 - SO2 - O2 How VA works for NOx Data Signal Boiler Virtual Analyser Fuel Flow Air Flow Combustion Temp Calculate & Predict

Comparison Hardware Analysers: Are physically installed in the field Are physically installed in the field Actually measure the concentration e.g. NOx Actually measure the concentration e.g. NOx Are the primary source of information Are the primary source of information Virtual Analysers: Are not physically installed in the field Are not physically installed in the field “Calculate & Predict” using other process parameters “Calculate & Predict” using other process parameters Are the secondary source of information Are the secondary source of information Contact:

Uses of VA It can be used for: Environmental regulatory requirements Environmental regulatory requirements Some hazardous environments which are unsafe for personnel Some hazardous environments which are unsafe for personnel Applications where repair of hardware analysers require a plant shut down Applications where repair of hardware analysers require a plant shut down Contact:

Recap VA: VA: Are approved by regulatory agencies e.g. US EPA (United States Environmental Protection Agency) Are approved by regulatory agencies e.g. US EPA (United States Environmental Protection Agency) Have lower capital, operating & maintenance cost Have lower capital, operating & maintenance cost Are simple & reliable Are simple & reliable Contact: