Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.

Slides:



Advertisements
Similar presentations
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Advertisements

3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
Low Emittance RF Gun Developments for PAL-XFEL
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
F Project X Overview Dave McGinnis October 12, 2007.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Operations, Test facilities, CF&S Tom Himel SLAC.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
BCD input from WG2 WG2 12/08/2005 H. Hayano Chris Adolphsen Terry Garvey Hitoshi Hayano.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
26 Apr. 07 ILCSC-MAC, FNAL Global Design Effort 1 Asian R&D Activity and Resources K. Yokoya KEK ATF/ATF2, STF KEK budget Korea, China, India.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
S1G Experiment Schedule Plan
Summary of WG2 :CFS for staging
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Chris Adolphsen Sergei Nagaitsev
Progress in Asia Hitoshi Hayano,KEK,
ILC Global Design Effort
Accelerator Layout and Parameters
Barry Barish GDE Caltech
Electron Source Configuration
Nick Walker (DESY) EU GDE Meeting Oxford
LAL meeting on e+ studies, Oct. 2010
Advanced Research Electron Accelerator Laboratory
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Presentation transcript:

Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005

Official Time Schedule of ILC Decide the director and location of Central GDI Establish Regional GDIs Decide the design outline in Snowmass Workshop (acc.gradient, 1 or 2 tunnel, dogbone/small DR, e + generation etc) 2005 end Complete CDR with rough cost/schedule 2007 end Complete TDR, role of regions, start site selection 2008 Decide the site, budget approval 2009 Ground breaking 2014 Commissioning starts

Asian Organization for ILC Research ● LC Office in Japan F. Takasaki, K. Yokoya, H. Hayano, N. Toge, S. Yamashita ● Working groups in Asian region WG1 Overall design (K. Kubo) WG2 Main Linac (H. Hayano) WG3 Injectors (M. Kuriki) WG4 Beam Delivery System (T. Sanuki) WG5 HG Cavities (K. Saito) ? Facility (A. Enomoto) ? Site (R. Sugawara)

Critical Research Areas ● Establishment of the technology for accelerating gradient 35MV/m. Technologies for cost reduction. Technologies for mass production ● Pursuit of possible higher accelerating gradient. Larger operational margin of gradient. Wider possibility of site selection ● Beam technology development using KEK-ATF. Unique storage ring to reach ILC emittance. Make full use of ATF capabilities

Guiding Principle Global Point of View ● Time line ● Low cost design ● Effective use of R&D budget by global coordination Regional Point of View ● Establish the leadership in leading areas ● Promote industrial level Time Scale ● Snowmass issues (Aug.2005) ● CDR issues (End of 2005) ● TDR issues (End of 2007)

Development of 45MV/m High Gradient Cavity ● Single-cell test in Dec Mar 2005 ● Individual vertical test of four 9-cell cavities by Sep Just in time for CDR completion. In existing facilities (AR east). If expected performance not obtained, ⇒ change to slower plan for ILC 2nd stage ● Cryomodule test by end of 2006 ⇒ STF Phase 1 ● Industrial design by TDR

Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D 1. Superconducting Cavity; fabrication, surface treatment, installation, vertical test / horizontal test, system test with beam 2. Cryomodule; cavity installation, alignment, cryostat operation, heat cycle test, input coupler R&D, tuner mechanism R&D 3. Power source; modulator development, klystron development, WG components 4. He plant; High efficiency cryogenic system 5. Beam Instrumentation; ILC beam generation, BPM, HOM, Low-Level RF control 6. Cavity Surface Treatment Facility; BCP, CP, EP, HPR, clean room

Location of Test Facilities ATF L-band R&D Stand STF #4 building KEK-B He Plant Control Center 1) 60m x 30m building: Klystron Gallery (with extendable space) Cavity installation room magnet power supply room (with extendable space) Control room (with extendable space) Cooling water facility AC power yard external Tent House 2) 5m x 3.85m x 93.5m tunnel: Access hatch only 2m x 4.5m with elevator (with extendable space) JPARC Proton Linac Building Will be empty in August 2005 Then, STF construction.

Purpose of STF ● Establish industrial design of Linac unit (35MV/m and 45MV/m) ● Promote Asian/Japanese industrial level for ILC component production ● Form Asian base for international collaboration ● Enlist/educate new comers

Klystron Gallery

Tunnel underground

STF Phase 1 ( ) ● Cryomodule for 4 45MV/m cavities ● Cryomodule for 4 35MV/m cavities ● RF source and cryogenic system (mostly recycled) ● Electron beam and its diagnostics system ● Synthetic test of 35MV/m & 45MV/m cryomodules with beam Other items in parallel ● Electro-polishing Facility. Can electro-polish cavities to be used overseas ● Cost reduction of cavity fabrication (Nb/Cu-clad, seamless)

STF Test Accelerator phase (RF gun): (1.3GHz 1.5cell copper cavity 42MV/m, 3.2nC/bunch 3.2MW, 1ms klystron, 5Hz) DC gun : DC 200kV CsTe photocathode for quick start + UV(262nm) Laser (337ns spacing, 2820bunches) Test Cryomodule : 4x 9cell TESLA SC cavity (5m cryomodule), 35MV/m 4x 9cell LL SC cavity (5m cryomodule), 45MV/m 4x 350kW + 4x 450kW = 3.2MW, 1.5ms klystron, 5Hz Beam analyzer: energy analyzer, emittance, BPM phase Accelerating Unit : 3 set of 17m full-size (12 cavities) cryomodule 2x 10MW, 1.5ms klystron, 5Hz

STF Infra-structure EP: build new EP(Electro chemical Polishing) facility HPR : move High Pressure Rinse from L-band test stand Clean room : build new clean room for cavity assemble Vertical Test Stand : build new stand, deep enough for superstructure cavity Coupler Test Stand : 5MW, 1.5ms klystron, 5Hz (switch use between Test Cryomodule ) He Plant : 600W at 4K plant moving from AR-East building (adding new 2K system )

Conceptual design of cryomodule 35MV/m TESLA design cavities 45MV/m Low-loss cavities Weld connection Valve Box STF Phase 1 Why two module and connection? ->5m carry hatch, ->Establish weld connection in tunnel. Become to 8 cavities in one cryostat Like TTF cryomodule

DESY

Preliminary design of cryomodule whole assembly 35MV/m TESLA design cavities45MV/m Low-loss cavities Single cryostat operation (option)

Cryomodule Cryostat Design KEK cryomodule cross-section Design is underway

STF Modulator, klystron plan 1. Buy 5MW Thales Klystron, Build Pulse trans, Modify PNC Modulator putting bouncer circuit in it. 2. Build one more modulator (ILC spec.) for cavity driving (in 2006). start investigation of technology for bouncer modulator/IGBT modulator. For driving cavities & Input coupler Test stand, later for RF-gun. Additional PT+Bouncer circuit allows to use TH2104C. PNC modulatorTH2104C

STF Phase 1 Beam Line Plan

STF Phase 2 ( ) ● 3 Cryomodules each containing 12 caviries (35 or 45MV/m) ● Reinforcement of RF and cryogenic systems ● Synthetic test with a beam Many uncertainties for Phase 2 ● GDI will be functional by the time of detail design of Phase 2 ● Collaboration/competition with TTF2/SMTF ● A few full-spec RF unit needed for TDR somewhere in the world ● STF Phase 2 is desired for Asian industrial level

ILC Cryomodule 1m dia. Cryostat(17m length), 12 of 9-cell SC Cavities

ILC Multi-Beam Klystron

ATF ● Beam dynamics study (Fast ion instability, wiggler, etc) ● Development of diagnostics devices (Laser wire, cavity BPM etc.) ● Improvements of extracted beam (coupling, stabilization) ● Development and test of fast extraction kicker Extension of ATF Extraction Line : ATF2 (A) Small beam size (A1) Obtain σ y ∼ 35nm (A2) Maintain for long time (B) Stabilization of beam center (B1) Down to < 2nm by nanoBPM (cavity BPM) (B2) Bunch-to-bunch feedback of ILC-type beam ( ∼ 300ns interval)

ATF ATF emittance goal was set to X emit=2.5E-6( at 0 intensity) Y emit=2.5E-8( at 0 intensity) 1% from X Mission: generation&confirmation of LC low emittance e - beam

ATF2 : final focus beam line Line 1 or Line 2 (depend on movement plan of existing facility) ATF DR

International Collaboration on ATF2 ● Design study going on by international collaboration. Mini-workshops: Dec.11 at KEK, Jan. 5 at SLAC. Completion of optics design in ∼ March ● Budget. Total 2.8 Oku Yen (floor, beamline, diagnostics). Desirable to share the expenses among Asia, North America, Europe ● Present plan. Floor construction in summer Start operation in Jan. 2007

END