Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)

Slides:



Advertisements
Similar presentations
Action Programmes KAG / HoPS / PAD Workshop 3 rd March 2014.
Advertisements

APT progress and resource discussion HS; 9 th March 2012.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
1 Tunnel implementations (laser straight) Central Injector complex.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
1 ARENA Workshop Renewables for Industrial Processes.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Considerations for the CDR and Strategy Update The current CDR planning focuses on 3 TeV and a downscaled not optimised 500 GeV machine, aiming for completion.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Lucie Linssen, CLICdp, bi-monthly meeting, 3 Aug General news CLICdp monthly meeting August 3 rd 2015.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Introdcution to Workpackage/Activity Reflection D. Schulte.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
CLIC 2014 goals Complete re-baselining of a staged implementation taking into account the Higgs energy scale and improved power/cost models OK … work being.
CLIC Organogram CLIC Collab. Board L.Rivkin MoU with annexes describing coll. efforts (note: in reality more complicated) CLIC SC (Stapnes) Repr. from.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
News and updates CLIC review and follow up: view?fr=no&detailLevel=contribution&view=standard&showS ession=all&showDate=all.
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
CLIC work program and milestones
LCC L. Evans, Santander, 2nd June 2016
CDR The CLIC CDR is now completed. The three volumes can be found as follows:      Volume 1:       Volume 2: 
LCWS11 AWG9 PARALLEL SESSION SUMMARY
The European Strategy for Particle Physics
Input to Strategy currently planned
Introduction to the Workshop
Collaboration New collaborators in 2016:
Report by Steinar Stapnes
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Yasuhiro Okada, Executive Director, KEK
Barry Barish Paris ICHEP 24-July-10
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan) planning started Annual report First budget estimate to Council and SPC in June Budget proposal to Council/SPC next week, approval in September: General picture … in words List of existing agreement between CERN and collaborators (50-60 of them, around 80 ph.d students, covers from “now” - > 2018) For CLIC/LC: As last MTP for , reduction in 2018 and specially 2019 consistent with the goal of delivering a CLIC project plan by end 2018 Next: Match programme with this goals 1

Development Phase Develop a Project Plan for a staged implementation in agreement with LHC findings; further technical developments with industry, performance studies for accelerator parts and systems, as well as for detectors Decisions On the basis of LHC data and Project Plans (for CLIC and other potential projects as FCC), take decisions about next project(s) at the Energy Frontier. 4-5 year Preparation Phase Finalise implementation parameters, Drive Beam Facility and other system verifications, site authorisation and preparation for industrial procurement. Prepare detailed Technical Proposals for the detector-systems Construction Start Ready for full construction and main tunnel excavation. Construction Phase Stage 1 construction of CLIC, in parallel with detector construction. Preparation for implementation of further stages. Commissioning Becoming ready for data- taking as the LHC programme reaches completion.

Deliverables by 2018 : 1.Summary project plan document (parameters, cost, power, site, staging, construction schedule, brief summary tech. issues (will be short), prep. phase ( ) summary (see point below) (document 50-80p) – plus short version 2.Preparation phase plan document (critical parameters, status and next steps what is needed before project construction start up, strategy, risks and how to address them, inside and outside CERN, in industry) (document, but need short version soon (outline) to justify some of the activities the next years already) 3.Detailed documentation across project EDMS/WBS based (exists to some level, “WBS” needed for cost, power) review and improve. Use for consistent technical documentation, results, notes/publication for each WP and/or activity 4. Techno transfer/spin-off paper including training (ph.d and fellows) ….. can be done earlier (to consider)

Activities and news Other: LCB Programme Advisory Committee meeting in Orsay – focused on ILC but with a CLIC presentation The Asian LC workshop took place at KEK ( Slides: Linear Collider School 26 October – 6 November, 2015 Delta Whistler Village Suites, Whistler, BC 2015 International Linear Collider Workshop, , also Whistler, BC: CLIC workshop 2016, January 2016 High Gradient Workshop June Tsinghua University ( The 5 th MEVArc (2-4 September 2015) Lapland Hotels Riekonlinna ( ) 4

Goals Follow up new baseline parameters: Document them, make initial new power estimate (top down), preparation for re-costing and detailed power longer term (presented last time, document underway) Summarize beamtest plans at CERN beyond CTF3 (last meeting, document overview) EDMS updated for the project in view of collaboration information and future project plan documentation (work on collaboration information, not for project plan) Prepare PAC and CMAC reviews (DONE) Aim for “solid” results for the dogleg experiment, phase forward and module studies in CTF3 (hard to define a clear goal but should avoid have most of the programme squeezed into last months of 2016) Get all test-stands into full operation, and define new structures (3000 prime, 380) prepare for industrial production (disks and full structures) First results from the drive beam gun and sub-harmonic buncher Follow up XFEL collaboration plans and alternative funding schemes (attempt to follow XBFEL project plan) Define with ATF teams better the CLIC specific goals 2 nd generation module plans to be firmed up and defined as a work-package (with budget and work- plan/sharing) Pursue the experimental program for CLIC damping ring technologies at ANKA (wiggler) and ALBA (stripline kicker) and pave the path towards future world collaborations in Low Emittance Rings (beyond EUCARDII) Summarize BBA progress and tools ….. Review CLIC activities (after CERN budget outcome) including the major R&D contracts with collaboration partners (soon after signature for some, after ~1-1.5 year for others)