SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting October 1, 2007.

Slides:



Advertisements
Similar presentations
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
Advertisements

OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.1 October 14,
Multi-DNC Data Collection/Monitoring
ODOT Employee Training UPDATED 8/8/2013
DNR-322L & DNR-326.
Guide to using the myNATE website
Systems Training for HQMC Installations and Logistics Department, Contracts Division (LB) October 24, 2013 Warrant Application System.
USC’s Internet-based Time and Attendance Management System.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
© 2008 QUALCOMM Incorporated. External presentation to (audience), prepared by QUALCOMM’s (presenters name) – Month Day, 2008 Hours of Service Driver Training.
Statewide Transportation Management Center Software Library System Status Meeting February 17, 2004.
PELICAN Keys to Quality – GSD Session 11 August 26th, 2008.
Connected Vehicle Design Review Southwest Research Institute
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
What is Sure BDCs? BDC stands for Batch Data Communication and is also known as Batch Input. It is a technique for mass input of data into SAP by simulating.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
SunGuide SM Software Development Project Status Meeting March 9, 2004.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting for SunGuide Release 4.0 August 18, 2008 August 18,
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting January 11, 2005.
Section 1: Introducing Group Policy What Is Group Policy? Group Policy Scenarios New Group Policy Features Introduced with Windows Server 2008 and Windows.
May 16, 2007Change Management Board Meeting1 Local: Toll-Free: Ext
TxEIS Security A role-based solution October 2010.
Access Online Cardholder Transaction Approval Training 1 Client Logo.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting August 27, 2007.
How to use TREx 1 Disclaimer: TREx under development, minor modifications may occur pending final release. Prepared for Education Service Center TREx Training.
SunGuide SM Software: Development Status Robert W. Heller, Ph.D. July 14, 2004.
SunGuide SM Software Development Project Release 3.0 Design Review May 8-9, 2007.
SunGuide TM Software Development Project Release 4.2 FHP/CAD + AVL/RR Design Review January 8, 2009 Jan 8, 20091R4.2 Design Review.
SunGuide SM Software Development Project Status Meeting December 7, 2004.
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
IPortal Bringing your company and your business partners together through customized WEB-based portal software. SanSueB Software Presents iPortal.
SunGuide SM Software Development Project Status Meeting July 13, 2004.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
SunGuide SM Software Development Project Administrator Training CDRL
SunGuide TM 4.0 Functionality Data Fusion: How Data is Managed June 24, 2008.
SunGuide TM Software Development Project Release 4.0 Kick-off Meeting October 15, 2007.
SunGuide SM Software Development Project Status Meeting April 29, 2004.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
SunGuide SM Software Development Project Status Meeting October 13, 2004.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
People First System Enhancements Release 1 B Manager and Employee Workshop February 2006.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
SunGuide SM Software Development Project Test Readiness Review (TRR) Meeting November 1, 2005.
SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting November 27, 2007.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
Copyright © 2012 Pearson Education, Inc. or its affiliate(s). All rights reserved
SunGuide SM Software Development Project Software Design Review May 12, 2004.
Wildfire Costing (WFCST) for Recorders A component of Wildfire One Fire Season 2016.
Comprehensive Continuous Improvement Plan(CCIP) Training Module 4 Funding Application Pages.
SOFTWARE TESTING TRAINING TOOLS SUPPORT FOR SOFTWARE TESTING Chapter 6 immaculateres 1.
Architecture Review 10/11/2004
Lesson 19: Configuring and Managing Updates
Archiving and Document Transfer Utilities
Conducting the performance appraisal
MCU cluster Cristian Alexe 18 October 2010.
Conducting the performance appraisal
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:50
SunGuideSM Software: Development Status Steven W. Dellenback, Ph. D
Agenda Time Item Lead 10:00 – 10:05 Introductions Liang Hsia
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
SunGuideTM Software Development Project Release 3
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
Agenda Time Item Lead 8:30 – 8:35 Introductions Liang Hsia 8:35 – 8:45
SunGuideSM Software Development Project Status Meeting and Demonstration April 5-6, 2005 CDRL
Presentation transcript:

SunGuide TM Software Development Project Test Readiness Review (TRR) Meeting October 1, 2007

October 1, 2007SunGuide TRR Meeting 2 Agenda TimeItem Lead 8:30 – 8:35Introductions 8:35 – 8:40Logistics Steve Dellenback 8:40 – 9:00Discuss Project Status Steve Dellenback / Robert Heller / John Boguslawski 9:00 – 9:15Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Build Tool Steve Dellenback / Robert Heller 9:15 – 9:30Open Discussion All

October 1, 2007SunGuide TRR Meeting 3 Introductions

October 1, 2007SunGuide TRR Meeting 4 Agenda TimeItem Lead 8:30 – 8:35Introductions 8:35 – 8:40Logistics Steve Dellenback 8:40 – 9:00Discuss Project Status Steve Dellenback / Robert Heller / John Boguslawski 9:00 – 9:15Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Build Tool Steve Dellenback / Robert Heller 9:15 – 9:30Open Discussion All

October 1, 2007SunGuide TRR Meeting 5 Logistics Test location: –ITS Demo Lab Breaks: –Rolling Lunch –SwRI Cafeteria Internet: –Available in the lobby (100baseT connection) Restrooms Lobby Demo Lab

October 1, 2007SunGuide TRR Meeting 6 Agenda TimeItem Lead 8:30 – 8:35Introductions 8:35 – 8:40Logistics Steve Dellenback 8:40 – 9:00Discuss Project Status Steve Dellenback / Robert Heller / John Boguslawski 9:00 – 9:15Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Build Tool Steve Dellenback / Robert Heller 9:15 – 9:30Open Discussion All

October 1, 2007SunGuide TRR Meeting 7 Development Cycle Design => Unit Test => Integration Test => FAT Some subsystems create a “chicken and egg” problem: –EM is one of “those” –Other subsystems rely on EM and cannot be completed until EM is “solid” EM Development schedule: –Initially due to SwRI 4 weeks prior to FAT-1 (4 weeks would allow SwRI to integrate all SwRI developed subsystems) –Revised schedule (established during FAT-1): Code drop due Sep 17 to SwRI Final code drop due Sep 24 to SwRI Running EM (database and subsystem) did not occur until Sep 27 As of Sep 30 th (noon) we have yet to get a script to upgrade the EM database (script for other subsystems exists)

October 1, 2007SunGuide TRR Meeting 8 Current Project Status: From a Development Perspective Solid: –511 –VSL –CE –AD CCTV Driver –EV –Web Server –General Testing completed, needs final integration testing: –AVL/RR –IDS –RPG –ODS (Reports testing, generating via RS is new) –RS Basic integration testing completed but additional development and testing needed: –EM

October 1, 2007SunGuide TRR Meeting 9 Current Project Status: From a Development Perspective - continued Why was the install not working in TERL and D4: –Installer was current and worked fine –Database upgrade script (EM components) did NOT work and significant manual work was/is required What is not ready: –Responder Audit Requirements (see next slide) –Database upgrade scripts for EM –SUM (EM and RS sections) –Final integration of EM related components

October 1, 2007SunGuide TRR Meeting 10 Responder Audit Requirements Will not be tested this week SunGuide Req. IDRequirement EM011 The responder audit function shall provide the capability to add, delete, or edit responder agency timeline, vehicle response timeline, and responder activity data in the SunGuide database. EM001U All operator changes shall be logged in the database for traceability, including the new value, previous value, the user who made the change, and the time the change was made. EM002U All operator changes shall be displayed in the chronology report with an indication that specific information has been changed. EM003U The operator shall be able to run a report using the SunGuide report function to review changes made and logged by the audit function. EM004U The operator shall have at least three ways to select an event: (1) by typing in the event number directly; or (2) selecting from the list of active events, or (3) selecting from a filtered list of all events. EM004U1 The operator shall be able to filter events by month, location, type, blockage, or responding agency involved. EM020G A Responder Audit screen shall be incorporated into the existing audit feature of the SunGuide GUI, using the existing permissions scheme and user authentication methods of the SunGuide GUI. EM020G1 The operator shall be able to add, delete, or edit agency notification, on-scene, and departure times. EM020G2 The operator shall be able to leave any of the fields blank in case that information is not available, except that a record must have at least one timestamp entered. EM020G3 The operator shall be able to add, delete, or edit vehicle response records for agencies with responding vehicles (Road Ranger, SIRV, etc.).

October 1, 2007SunGuide TRR Meeting 11 Responder Audit Requirements Will not be tested this week - continued SunGuide Req. IDRequirement EM020G4 The operator shall be required to provide the notification time and either the arrival and departure times or the cancellation time. EM020G5 The operator shall be able to add, edit, and delete activity records associated with vehicle response records. EM020G6 The software shall require the operator to enter the time that an activity was performed, however the software shall also require the timestamp to fall within the arrival and departure timestamps for the vehicle record. EM020G7 The GUI shall warn the user when a timestamp is entered which is earlier than the event start time or later than the event closed time. EM020G8 The operator shall have the option to enter a quantity associated with an activity, such as gas, when the activity is configured as "quantifiable". EM020G9 The GUI shall display a summary of all the agency response times, the detailed vehicle response time records, and all the activities performed. EM020G10The GUI shall display the event location, event number, and blockage history for an event. EM020G11 The GUI shall provide an event chronology summary window with the ability to generate a report. EM021GA comments field shall be provided for the operator to enter free-text data. EM012Activities shall be classified in the software as quantifiable or not.

October 1, 2007SunGuide TRR Meeting 12 Forward Looking Schedule (dates from currently published schedule) IV&V – TERL (FDOT/PBS&J led activity): –Dry Run: Oct –Actual Test: Oct Operating Training Material: Oct 3, 2007 Installs: –Sep 25-28: D4 TERL –Oct 15-16: D2 –Oct 22-25: D5 –Oct 22-25: D6 –Oct 29-30: D7

October 1, 2007SunGuide TRR Meeting 13 Project Status Still waiting from IBI: –Dates for: When SUM input will be provided When Responder Audit will be completed When EM database scripts will be completed SwRI activities: –Final integration testing once final products are received Timeframe objective: to have completed by IV&V Discussion / comments ???

October 1, 2007SunGuide TRR Meeting 14 Agenda TimeItem Lead 8:30 – 8:35Introductions 8:35 – 8:40Logistics Steve Dellenback 8:40 – 9:00Discuss Project Status Steve Dellenback / Robert Heller / John Boguslawski 9:00 – 9:15Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Build Tool Steve Dellenback / Robert Heller 9:15 – 9:30Open Discussion All

October 1, 2007SunGuide TRR Meeting 15 Purpose of TRR / FAT Purpose: –Review preparations for testing –Walk through the test procedures at a very high level and determine if anyone has any comments Ground Rules: –Testing will not depart from the written procedures –Any requested “ad hoc” testing will occur after the formal testing process –Re-writing of requirements / scope additions will be captured for future consideration Approvals: –FDOT/SwRI will witness each test case (on “Master SICP”) –At the conclusion, FDOT will sign SICP cover page to acknowledge all tests were executed as written/noted in the “Master SICP”

October 1, 2007SunGuide TRR Meeting 16

October 1, 2007SunGuide TRR Meeting 17 SwRI Server Farm SAN: –Two drive bays –6 fiber connected hosts FAT: –Four DL380s Development: –Six DL380s –Eight DL370s

October 1, 2007SunGuide TRR Meeting 18 Hardware Configuration Kepler / Lieibnitz (District 5 database): NO EM ON THIS SETUP  DMS devices: o Four IDI 2x20 devices:  01-Demo  03-Demo  04-Demo  06-Demo o One IDI 3x18 device:  99-BigSign  VSL devices: o Two IDI 2x20 (1x2) devices:  02-DemoVSL  05-DemoVSL  CCTV devices: o One AD Ultra 7: 100-SwRI_AD_Ultra7 o One AD Ultra 8: 101-SwRI_AD_Ultra8 o One Vicon (NTCIP): SwRI Cohu SR436) o One Cohu (NTCIP) : SwRI Cohu West of 436)  Video Capture (standalone workstation with capture card): o Vbrick decoder: using 1 video feed for multiple “simulated” cameras  TSS devices: o Driven by simulators  RWIS devices: o Driven by simulators Peano (District 4 database):  DMS devices: o Five IDI 2x20 devices:  01-Demo  02-Demo  03-Demo  04-Demo  CCTV devices: o None  TSS devices: o None Taylor (District 6 database):  DMS devices: o None  CCTV devices: o None  TSS devices: o None Pythagoras (hosts C2C / web sites):  Web site (fl511dev.datasys.swri.edu)  Event Viewer (EventViewer.datasys.swri.edu)

October 1, 2007SunGuide TRR Meeting 19 Release 3.0 Integration Cases IC-1: Configuration Editor (CE) IC-2: Variable Speed Limit (VSL) IC-3: American Dynamics Closed Circuit Television (AD CCTV) Driver IC-4: 511 (511) IC-5: Web Server (WS) IC-6: Automatic Vehicle Location (AVL)/Road Ranger (RR) IC-7: Incident Detection Subsystem (IDS) IC-8: Event Management (EM) (includes Responder Audit) IC-9: Response Plan Generation (RPG) IC-10: Reporting Subsystem (RS) IC-11: Event Viewer (EV) IC-12: Operational Data Store (ODS) IC-13: General Subsystem Updates (GEN)

October 1, 2007SunGuide TRR Meeting 20 FAT 2 Limitations Testing activities that require Event Management (EM) are not 100% integration tested (e.g. AVL/RR, IDS, RPG “may” have issues) Comment: D5 has an install (and using operationally) the following R3.0 components: –511 –AD CCTV Driver –VSL –Web Server –Release 3.0 core components (C2C, GUI, MAS, Data Bus, TSS)

October 1, 2007SunGuide TRR Meeting 21 Schedule for Testing Date / TimeItemLead MondayIC-8: Event ManagementIBI Tuesday IC-8: Event Management IC-11: Event Viewer (EV) IC-9: Response Plan Generation IC-6: AVL/RR (partial) IC-10: Reporting Subsystem IBI / SwRI Wednesday IC-10: Reporting Subsystem (continued) IC-7: Incident Detection IC-12: Operational Data Store (ODS) Start partial testing: IC-2: Variable Speed Limit (VSL) IC-4: 511 (511) IC-5: Web Server (WS) IC-13: General Subsystem Updates (GEN) IBI / SwRI Thursday Complete partial testing SICP Testing SwRI

October 1, 2007SunGuide TRR Meeting 22 Test Case Example

October 1, 2007SunGuide TRR Meeting 23 Questions About Test Cases?

October 1, 2007SunGuide TRR Meeting 24 Environment Note Note that SwRI has both “real” equipment and simulators in the lab There are times that the simulators “mis-behave” and we find ourselves “re-testing” to achieve the results The “re-tests” do NOT require software modifications For example, a drunk driver took out the power (actually causing a short on the power lines and toasted a number of devices such as voice mail) to SwRI and the Cortec Codecs have never been the same. SwRI has other project’s that will occasionally (accidentally) “hit” our development devices

October 1, 2007SunGuide TRR Meeting 25 Tests for FootPrints Issues On the last days test for the following FootPrints issues will be performed (not in the SICP): –#134: Ability to convert non-TSS link to TSS link –#225: SAS subsystem requires restart –#254: Refresh geometry button on Video Wall Control Dialog not working –#258: preferences lost –#295: TvT needs to be restarted for new template

October 1, 2007SunGuide TRR Meeting 26 Automated Build Tool: Recommendation from last PCA – “push a button”

October 1, 2007SunGuide TRR Meeting 27 Agenda TimeItem Lead 8:30 – 8:35Introductions 8:35 – 8:40Logistics Steve Dellenback 8:40 – 9:00Discuss Project Status Steve Dellenback / Robert Heller / John Boguslawski 9:00 – 9:15Hardware / Lab Configuration Testing Process Test Procedures Deferred Test Cases Build Tool Steve Dellenback / Robert Heller 9:15 – 9:30Open Discussion All

October 1, 2007SunGuide TRR Meeting 28 Open Discussion