Paul drumm, mutac jan 2003 1 1 Precursor: - Resources since cm16. Beamline Review Response. Optics related work: the major threads: -Current (ε,p) status.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
1 Acceptance & Scraping Chris Rogers Analysis PC
1 Simulation Status/Plans Malcolm Ellis Sci Fi Tracker Meeting Imperial College, 10 th September 2004.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
Paul drumm, mutac jan MICE Beamline Optics Design Kevin Tilley, RAL, 12th June MICE Needs Generic Solution Pion Injection & Decay Section (a) Inputs.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
March 30, 2004 TJR1 MICE Upstream Particle Identification Tom Roberts Illinois Institute of Technology March 30, 2004.
Slide 1 MICE Beamline Design and Commissioning Review 16 th Nov 2007 Simulation comparison / tools / issues Henry Nebrensky Brunel University There are.
TJR Sept 22, 2004MICE Beamline Analysis -- SEPT041 MICE Beamline Analysis – SEPT04 Tom Roberts Muons, Inc. September 22, 2004.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
TJR 10/30/031 MICE Beam rates Tom Roberts Illinois Institute of Technology 10/30/03.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
Beam line summary paul drumm for beam line group.
124/3/2010CM26 - Riverside1 m. apollonio ( ,P) matrix.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
TJR August 2, 2004MICE Beamline Analysis1 MICE Beamline Analysis JUNE04 Including a proposal for a JUNE04A Configuration Tom Roberts Illinois Institute.
Beamline-to-MICE Matching Ulisse Bravar University of Oxford 2 August 2004 MICE performance with ideal Gaussian beam JUNE04 beam from ISIS beamline (Kevin.
MICE Beam Line Design Oct 24 th 2005 Dean Adams, Kevin Tilley Based on TURTLE element definitions by K Walaron, T Roberts and K Tilley.
MOM Report. Shield Wall – Gone Before During After 2.
Paul drumm, mutac jan K. Tilley, MICE-VC, 10/05/07 Status of Beamline Design / Commissioning MICE-VC.
March 30, 2004 TJR1 MICE Beamline Performance with New Magnet Descriptions Tom Roberts Illinois Institute of Technology March 30, 2004.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
1 MICE Beamline Design: General principles & expected capabilities Kevin Tilley, 16 th November Charge to beamline & desirable beam General principles.
Diffuser Studies Chris Rogers, IC/RAL MICE VC 09 March 2005.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
(+) session, PAC09 Vancouver – TH6PFP056 Introduction The Muon Ionisation Cooling Experiment (MICE, fig. 1c) at RAL[1]
1 Beamline DayTimePresenterTopic Thurs9:00C.BoothMICE Target Wed16:00K.TilleyRecent Beamline Design Work Wed16:30T.RobertsMICE Beamline Performance + Emittance.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
MICE PID & trigger Detectors MICE CM11, LBL Feb 12, 2005 for the PID team Bonesini, Cremaldi, Gregoire, Kahn, Roberts, Sandstrom, Summers, Tilley, Tonazzo,
1 Beamline 1. Beamline Target/Misalignment problem 2. Magnet measurements 3. Everything that’ critical and outstanding – eg d/str beamline monitors final.
Beam line commissioning Preparations for Phase1 Kevin Tilley For Paul Drumm & the beam line group.
1 May run: Beamline Configuration. Some preliminary thoughts. K.Tilley, 24/04/08.
Plans (& ideas) for beamline commissioning The beamline Magnet field tests Source characterisation Optics (& model) commissioning K. Tilley CM18, 14/06/07.
MICE PID size &scraping MICE CM16, RAL, Oct V. Palladino, Univ & INFN Napoli for R. Sandrstrom and others contributing to this effort Yagmur, Holger,
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
PID PC 7th Sept MICE MAGNETIC FIELDS & SHIELDS J. H. Cobb & H. Witte Oxford University Magnet fields for MICE (VI) calculated including magnetic.
1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
1 Beamline Work. Optics:- Simulation debugging (then redesign..) Commissioning Hardware:- Dipole B1 beampipe installation issue Further magnet measurements.
14/01/2008MICE CM23 - Beam Line Parallel Session1 Simulations: tools and status Marco Apollonio, Imperial College - London.
1June 2 nd 2009MICE CM24 - RAL1 m. apollonio Beamline+( ,P) matrix.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
17 Sept 2007 Analysis PC 18 Sept Analysis PC Schedule 2007 Tuesdays alternate weeks, 15:30 – 17:00 GMT, with ad hoc exceptions Tue 3 April Tue 17.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
Paul drumm, mutac jan Status of Muon Beamline design work Kevin Tilley, RAL, 9th Feb Including Beamline Materials in new revision Reference ('True')
1June 1 st 2009MICE CM24 - RAL1 Beamline Optics m. apollonio.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
1 1 Optics related work: the major threads: -Current (ε,p) status - G4BL/TTL Simulation comparisons - Beam steering/correction -Collimation d/stream &
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
Marco apollonioAnalysis Meeting (9/12/2006)1 transmission vs amplitude with a finite size diffuser M. Apollonio – University of Oxford.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Beam-Line Analysis m. apollonio 7/7/2010 CM27 - RAL 1.
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
Effect of Reduced Focus Coil Current on Step IV and Step VI
Impact of Magnet Performance on the Physics Program of MICE
How to turn on MICE Step IV
IR Beam Transport Status
Presentation transcript:

paul drumm, mutac jan Precursor: - Resources since cm16. Beamline Review Response. Optics related work: the major threads: -Current (ε,p) status - Current (ε,p )optics design work (i) & (ii) - Beam steering/correction -Collimation d/stream & upstream. - Diffuser status (briefly) Beamline commissioning/diagnostics Prioritised Work plan towards August/September Status of Beamline Design K. Tilley, RAL, 01/02/07

paul drumm, mutac jan Since CM16 : Nov / Dec:- Marginal time to progress. 2x meetings, 'some' work recommenced - due ISIS pressures & no change in resource (KT) Jan:- ~ normal strength + new Brunel postdoc (50%) + (small%) IIT postdoc butminus much of TJR, CR, KW Its clear that there is also a lot of outstanding work desired by August/September & "not much of us". We are drawing up a workplan of what we could realistically achieve to be discussed with MICE. Precursor:

paul drumm, mutac jan Beamline Review - Response completed 6 points made by reviewers. We've responded to these, and forwarded the response on for consideration.

paul drumm, mutac jan Current (ε,p) Beamline Cases Current lattices are as per CM16:- MeV/c (Two rows really here: For Fixed & Scaled Tracker fields ) TT: Transport & Turtle G4: G4Beamline (incl new Ckv1) pp 11 66 10  TT G4BL TT G4BL TT G4BL 140 … with the same "+'s" and -'s as that time. ie '6pi' assess' to ~ 10pi in G4BL etc. NB: some potential for assessing how coolable/useful these beams actually are.

paul drumm, mutac jan Current (ε,p) Optics design work We are focussing on the 'baseline' case, to try and optimise this. -> a 'real' matched 6pi beam. Two (present) approaches: (i) G4BL internal optimiser (TJR/DH) (ii) Addressing Tpt/Ttl weakness' -> re-evaluate in G4BL (KT/HN/CR/KW) MeV/c pp 11 66 10  TT G4BL TT G4BL TT G4BL 140

paul drumm, mutac jan G4BL beam profile visualisation tool complete. - Interface for MINUIT which can vary Q4-9 fields & Diffuser thickness - Work to optimise for emittance & match - Some interesting results w/o TOF0 & without air (helium) - Limited TJR/DH time for MICE - Computing power needed is quite vast to acquire reliable data ! - Ongoing. - Maybe something which should also be picked up by others? - (limited by people time / computing power). - (A final 'exact' beamline (6pi,200 etc) will probably need to be done internally via G4BL anyway) (i) G4BL optimiser (TJR/KW)

paul drumm, mutac jan A number of weakness of Tpt/Ttl model for this beamline are well known: (1) lack of spectrometer solenoid fringe field (2) No Air. Many materials have √θ 2 ttl ~ 0.7 √θ 2 g4bl - hopefully these were important: we can "fix" these - Also, can study g4bl versus Turtle beam & try to glean other significant differences:- (ii) Addressing Tpt/Ttl weakness' -> re-evaluate in G4BL It's now clear why ε g4bl >> ε ttl: ε ~ Δx.Δx': - Δx. g4bl >> Δx. g4bl Δx': g4bl ≈ Δx'. ttl The cause for Δx g4bl maybe due to above (1,2) but should be found from studying the output differences?

paul drumm, mutac jan This work has just seriously begun within last ~ 2weeks. - We will design Turtle beam for new match point (outside of ss fringe field) - We will (probably) refine our model of beamline materials (Air etc.) - Incorporate other significant effects that we have time to find. - We can also consider other things which may be useful to beamline design - moving Q7,8,9 downstream a little - moving Ckov1 near to upstream of Q7?? * - May not be easy. The "notional" timescale is to aim towards completing by CM17 - but it depends on how accurate this process is wanted to be….?? (ii) Addressing Tpt/Ttl weakness' -> re-evaluate in G4BL ctd

paul drumm, mutac jan Beam Steering/Correction Scheme Current baseline is still as per CM14/Osaka:- Lattice dipoles and quads impede optimal placement. Best fit solution is: B2 VSM1 CKV1 VSM2 HSM1 Q4-6 Q7-9 TOF0 TOF1 (some) Issues:- - have realistic magnet misalignments been studied? - use of 3 SMgts + B2 to perform correction (B2 used for p0 selection) so quantitatively, what is the effect on end? - Space provision: VSM1 position may sit on Cllmtr ! - will biased quadrupoles suffice? - we're currently not planning for SMgts on day 1 ISIS TS2 steering magnet

paul drumm, mutac jan Collimation upstream & downstream TOF0 rate protecting collimator (for 1.5MHz):- Current baseline is still as per CM16/RAL:- D2 VSM1 CKV1 VSM2 HSM1 Q4-6 Q7-9 TOF0 TOF1 (some) Issues:- - Space provision. Collimator may sit on VSM1 ! - What design? - probably not one in place on day 1? Is it essential for TOF0/Ckv? * - how to use it : Insert & retune beamline? (best results-> 328 Good u -> 493) Downstream collimator (to reduce εn < ~ 3pi) :- Close to entrance to MICE (between Q9 & iron shield?) (some) Issues:- - This hasn’t been given serious consideration yet.

paul drumm, mutac jan Diffuser status (briefly) The MICE Analysis group are studying the radius of the diffuser. They conclude it should have radius > current 10cm, to study the larger emittance beams through MICE. A specification is being drawn up for input to WL. The actual thickness' of the diffusers' have not been specified - they come naturally from the optics work - but may need to be specified conservatively in advance?

paul drumm, mutac jan Beamline Commissioning / Diagnostics Commissioning ideas are being developed currently –Magnet testing –Basic startup: threading through the beamline –Setup as per A.Blondel / K.Long talk in Dec VC? –Further consideration being given to this by beamline group. Diagnostics:- –we are considering using our own beamline diagnostics to make the first setup of the beamline –ie. downstream of B1: scintillating glass? –fibre trackers (AB,PK,Fermilab) within the beamline –We will make good use of TOF0/1/Ckov1/Tracker when available. –We will need software to provide useful beam diagnostic output from the PIDs

paul drumm, mutac jan Work plans: It is clear that there are a long list of desirables:- all (ε,p) matrix cases (9? 12?..) steering scheme. tof0 collimation? d/stream collimation magnet testing/beamline commissioning plans etc and few people & little time, before Aug / Sept15. We (BL group) intend to draw up a work plan of what we can realistically achieve to be discussed with MICE. Prioritised work plan towards August/Sept