1 Operational Integration Team Complex Procedure Presentation Alaska October 2-4, 2002 Dave Peterson.

Slides:



Advertisements
Similar presentations
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Advertisements

A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Performance-based Navigation Honeywell SmartPathTM
Continuous Climb Operations (CCO) Saulo Da Silva
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
PBN Plan Development Aviation Industry Forum 18 November 2009.
Report on New Technologies ACI TSSC May New Technologies  The emerging technologies for aircraft management and surveillance offer significant.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
FAA Strategic Planning Flight Plan Update James Ballough Director, Flight Standards Service November 2004 Flight Standards Service.
Presented to: By: Date: Federal Aviation Administration Performance Based Navigation in USA Program Status and Processes ICAO Asia and Pacific Region Performance.
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
1 Introduction of new electronic systems for aviation Thor Breien, Dr. Ing Park Air Systems AS Presented by Linda Lavik.
Larry Oliver FAA Flight Standards (AFS-430) Advanced Management Technology, Inc. Federal Aviation Administration GPS/WAAS.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT.
Federal Aviation Administration 0 0 Required Navigation Performance (RNP) in the United States Presentation to: US/Europe International Aviation Safety.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
. Traffic Flow Management System Benefits Flexibility for Future Growth: TFMS provides a modern software architecture to meet future growth and support.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
NTAS NextGen Videos  Satellite Based navigation  ADS-B ◦ In / Out  Performance Based Navigation ◦ RNP/RNAV  TBO  Data Link Communications.
Satellite Navigation Program Federal Aviation Administration.
GNSS Aviation Applications
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Larry Oliver FAA Flight Standards (AFS-430) GPS Technical Assistance Contract Federal Aviation Administration Everything You Wanted to Know About GPS and.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Federal Aviation Administration Newark Project Overview January 2009.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
NextGen Next Generation Air Transportation System
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Complex Procedure Development Plan
Overview of FAA Satellite Navigation Transition and Backup Strategies Int’l Loran Association October 28, 2002.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Space-Based Navigation Systems
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
2003 FRP User Conferences 1 FAA’s Transition Strategy for Navigation and Landing Services Dave Olsen Navigation System Engineer Architecture and Systems.
ADS-B An Industry Perspective New Technologies Workshop Washington, DC January 10, 2007.
Satellite Navigation Program
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March Dave Nakamura ICCAIA/Boeing Member to ICAO OCP and RNP SORSG.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Continuous Climb Operations (CCO) Saulo Da Silva
Association of California Airports Instrument Flight Procedures
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV and RNP Strategy in Japan
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

1 Operational Integration Team Complex Procedure Presentation Alaska October 2-4, 2002 Dave Peterson

2 Satellite Navigation’s Mission WAAS/LAAS Implementation

3 Objective FAA Satellite Navigation Mission Overview of Operational Integration Program Status of Operational Integration Projects

4 Current WAAS Performance Available Via FAA GPS Website

5 Potential LAAS Benefits Achieve Consistent, Accurate, Repeatable Performance Expand Closely Spaced Parallel Runway Ops Support Advanced/Complex Procedures Which Provide Improvements in Safety and Capacity to Lower Minima Support Surface Movement Applications Eliminate Need for In-Aircraft Procedure Database Support Extended Arrival Procedures Support RNP Based Operations

6 Potential LAAS Benefits Reduce Aircraft Separation Requirements Reduce ATC Workload Reduce Obstacle Clearance Requirements Ability to Change or Create Approach Procedures without Infrastructure Changes Ability to Implement Multiple, Segmented, or Variable Glide Slopes Support Runway Incursion Avoidance Systems Compress the Density of Terminal Operations

7 Potential LAAS Benefits Support Adjacent Airport Operations De-conflict Airspace Enable Environmental and Security Improvements (e.g., Noise Abatement) Support Highly Reliable 4-D Guidance in Terminal Area Ability to Use Single LAAS System to Support Approaches at Multiple Runway Ends Improved ATC Terminal Area Surveillance Through Improved Navigation Accuracies

8 Operational Integration

9

10 Operational Evolution of SatNav Procedures CAPABILITY TIME LAAS CAT I Advanced Procedures LAAS CAT II/III WAAS GLS WAAS LPV Approaches WAAS LNAV/VNAV Approaches Stand-Alone GPS Approaches GPS Overlays

11 WAAS Policy and Guidance LNAVLNAV/VNAVLPV Flt Stds Guidance TERPS Air Traffic Control NOTAMS Certification Flight Inspection Procedure Production Complete NowIn Progress, Complete by 7/03 In Progress, NOT Complete by 7/03 Not Started

12 LAAS Policy and Guidance Certification Procedure Production Flight Inspection NOTAMS Air Traffic Control TERPS Flt Stds Guidance CAT II/IIICAT I Not StartedIn Progress, NOT Complete by 7/03 In Progress, Complete by 7/03 Complete Now

13 LAAS Avionics LAAS Minimum Operational Performance Standards (MOPS) DO-253A and Interface Control Document (ICD) DO- 246B, Updated 11/28/01 Technical Standard Orders (TSOs) for Navigation Sensor and VHF Data Broadcast Being Prepared for Public Comment Software Mod to Add WAAS GEO Ranging to LAAS MMR Navigation Solution Delivered, 3/29/02 Modifications to Add Curved Approach Processing Being Initiated at FAATC

14 Flight Standards

15 Approach Strategy Evolve from Angular Criteria (Today) to Optimized Criteria (Angular/Linear) Industry Desires Linear Criteria Phase 1 –Benefit Establishes a Foundation for All –Commonality of RNP Across NAS Phase 2 –Benefit Comes With RNP <0.3 –RNP Based Missed Approach Guidance Leverage CAST, But Do Not Disrupt Both Currently Funded Under CAST –Still Need SAAR Procedures Up to 2000 Additional Procedures - Subject to Benefits Analysis Specials Continue

16 Strategy - RNP 1 - Optimize structure - Procedural separation - Mandates? Initial ImplementationNext Steps Public RNP 0.3 Qualifying aircraft: GPS or RNP-certified using DME/DME/Inertial TERPS: 2xRNP primary, 1xRNP transitional Implement on RNAV approaches, replace LNAV/VNAV Specials Public SAAR Lower RNP Public SOIA Approach Terminal Arrivals & Departures En Route RNP 2 Qualifying aircraft: Tailor RNAV criteria (GPS, DME) TERPS: 8 mi. aircraft separation (centerline) Implement wherever advantageous and equipage exists Supports existing route structures. RNP 2 Qualifying aircraft: Tailor RNAV criteria (GPS, DME) TERPS: Using Level 2 RNAV DPs, RNAV STARS Implement as part of national airspace redesign RNP 1

En Route RNAV Projects 56 - ASA Routes $2 Million 37 - Multi-Center Routes $2.6 Million ACA Routes $4.1 Million 6 - West Coast Routes $455 Thousand Total Annual Airline Reported Savings = $30.8 Million “Q” Routes Provide RNAV Routing for Gulf of Mexico Savings $21.6 Million

18 Procedures and Surveys

19 Procedure Production Schedule Available Via FAA GPS Website Available at Also, available at

20 Interference Detection and Risk Mitigation

21 GPS Interference Detection and Location

22 Air Traffic

23 Overview LAAS Program Commissioning 6 LRIP Systems –Memphis, Phoenix, Houston, Seattle, Chicago, Juneau One of the Fundamental Benefits Users Expect from LAAS is Ability to Fly Complex Procedures Purpose of this Meeting is to Establish a Plan for Implementing Complex Procedures at the 6 LRIP Airports

24 Background AND-720 has been Meeting with LAAS Users, Air Traffic Representatives, and Procedure Developers to ­Better Define Anticipated LAAS Benefits ­Understand Desired LAAS Operations ­Establish What the OIT Can and Can Not Do to Implement Those Operations Goal is to Develop Consensus on Projects to Implement Desired LAAS Operations

25 Background Kick-off Meeting Held in Arlington, VA (April) Second Meeting Memphis, TN (April) Third Meeting Chicago, IL (July) Fourth Meeting Chicago, IL (August) ­Develop Requirements for Specific LAAS Procedures at Chicago Additional Meetings being Considered for each LAAS LRIP Airport

26 Site Coordinators Each Site has a Primary and Backup Coordinator –Facilitate the Development of the Advanced Procedures Assist AND-720 Establish a Development Team for Each LRIP Airport Coordinate with the Airports and Regions (Following Site Visits by AND-710 and AND-720) Coordinate Development Team Meetings and Activities Refine Detailed Schedules for Each Site, Track Progress and Ensure Schedules are Being Met Identify Issues

27 LRIP Coordinators Memphis Bob Beal Campbell Motley Juneau Bob Beal Campbell Motley Houston Tracey Golden Tim Roe Phoenix Tim Roe Paul Ewing Chicago Jeff Cochrane Larry Oliver Seattle Rich Cole Paul Wagoner

28 Top Level Complex Procedure Development Schedule

29 Follow-On Activities Develop a Chicago Specific Project Plan –Initial Focus on Guided Descending Approach to 09L –Incrementally Addressing Entire Procedure – Reduced Separation, Missed Approach, Guidance Task Leads –Review Task Details Ensure All Sub-Tasks Addressed Ensure Schedule is Realistic –Submit Project Plans and Resource Requirements to Cover FY03 Tasks Schedule Site Visits (AND-710, 720) and Coordinator Coordination

30 Triple Convergence Approach – Chicago O’Hare Double click executable to play file

31 Guided Complex Approach to 09L

32 Schedule Level 1_1

33 Schedule Level 1_2

34 Schedule Level 1_3

35 Schedule Level 1_4