JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
André Augustinus 16 June 2003 DCS Workshop Safety.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
ACES 2011 The third common ATLAS CMS Electronics Workshop for LHC upgrades March 9-11, 2011, CERN, Geneva, Switzerland Hardware:  ATMEL ATmega128 microcontroller.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
Robert Gomez-Reino on behalf of PH-CMD CERN group.
CERN - IT Department CH-1211 Genève 23 Switzerland t The High Performance Archiver for the LHC Experiments Manuel Gonzalez Berges CERN, Geneva.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
19/05/10FV 1 HyTec crate – DCS integration issues.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Systec CAN-USB Box ― Overview and Status JCOP Team Meeting 2 November 2006 Beat Jost/Cern-PH.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
Industrial Power Supplies Observations from the survey responses. Observations per commercial vendor. Engagement outline with commercial vendors.
Distributed middleware for front-ends and systems connectivity Piotr Nikiel on behalf of JCOP 1.
PVSS an industrial tool for slow control
Solution proposals for replacement of KVASER PCI-CAN interface
Institute of Nuclear Physics Polish Academy of Sciences
JCOP Workshop November 2015
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
ATLAS Detector Controls
Presentation transcript:

JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C. Gaspar (LHCb), F. Glege (CMS), S. Schlenker (ATLAS), M. Gonzalez (EN-ICE), Ph. Gayet (EN-ICE), F. Varela (EN-ICE) ACES 2014 CERN, 20th March 2014

Joint COntrols Project The DCS of the four LHC Experiments is done in common in the frame of the Joint COntrols Project (JCOP) Started in 1998 Collaboration between the Experiments and EN-ICE (formerly IT-CO) Major subprojects: PVSS Framework Experiments’ Gas Control Systems Detector Safety Systems Only common DCS components will be covered in this talk F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 2

JCOP timeline Some events with impact on the DCS hardware: 2000 2001 2002 2003 2004 2005 2010 Selection of PVSS Selection of OPC Data Access OPC Maintenance Contracts (Wiener, ISEG, CAEN) ELMB as JCOP Deliverable Activities PVSS Framework development Kvaser CAN-PCI Interface SYSTEC CAN-USB Interface F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 3

Typical DCS Up to 3M HW I/Os Up to 160 PVSS interconnected systems i.e. up to several million dpes Up to 160 PVSS interconnected systems Geographically distributed Oracle archiving to a central DB server Up to 6000 PVSS processes And many non-PVSS processes Apps developed around the world Linux and Windows Integrated and managed at CERN (1-2 men) Lifetime ~20 years Operation as FSM

JCOP PVSS Framework JCOP PVSS Framework Access Control Trending FSM-ConfDB ConfigurationDB DIP Installation Oracle Archiving 3DViewer DIM System Overview FSM … fwELMB fwCAEN fwWiener fwISEG OPC Client OPC Client OPC Client OPC Client ELMB OPC Server CAEN OPC Server Wiener OPC Server ISEG OPC Server Commercial OPC Servers F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 5

JCOP Hardware Commercial Powering Systems CAEN, Wiener, ISEG Support Hardware and firmware: PH-ESE Interface Software (OPC): EN-ICE PLC-based safety systems (ALICE and CMS) Wiener VME crates ATLAS Embedded Local Monitor Board (ELMB) CANbus interfaces: Kvaser PCI Systec USB Lots of custom hardware where JCOP supports interfaces DIM, Modbus, etc. F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 6

Motivations for Upgrade New Requirements Virtualization (LHCb) Redundancy (CMS) Full DCS under Linux (ATLAS) For new electronics, part of the DCS data will share data path with DAQ (e.g. GBT) Needs DCS BE interface on off-detector electronics (e.g. Embedded OPC UA servers on FPGA/ARM processors) Technology obsolescence OPC DA based on MS DCOM Equipment ageing due to radiation (foreseen) e.g. ELMB New standards/new functionality xTCA as replacement for VME e.g. EtherCat No direct connections between hosts and front-end equipment => Go Ethernet!! F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 7

CAN Upgrade Plans CAN in the Experiments’ DCS Hundreds of ELMB applications (detector, environment, racks, etc.) Control of Wiener VME Crates ISEG HV PS on PEAK CAN-USB or CAN-PCI interface Issue: Current CAN USB or PCI interfaces put limits to redundancy and virtualization Short/mid term plan: Look for an Ethernet-based replacement Multi-port (at least 12 CAN ports) Drivers for Windows and Linux AnaGate CAN Quattro as a very promising candidate Decision expected by Spring 2014 Longer run: Look into EtherCat or other Ethernet based protocols, as possible replacement of CANbus for new applications F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 8

Commercial Power Systems Currently OPC Data Access is the software interface to CAEN, Wiener and ISEG power supplies Issue: OPC DA is based on DCOM -> Technology phased out by Microsoft Mid/Long term upgrade plan: OPC Unified Architecture as natural evolution Platform Independence Embedded Platforms Modern Security OO-like Information Modelling F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 9

OPC: Lessons learnt CAEN, ISEG, Wiener are hardware vendors Significant effort for them to develop OPC servers “Black-box” model followed in the past does not work, i.e. CERN does not care how the server is implemented as long at it works Far too long to deliver working OPC servers Extremely inefficient debugging Problems are only manifested in production setups Not possible to reproduce in smaller lab setups CERN had no access to the source code for debugging Luckily enough this has changed recently

Still under discussion. Personal view OPC Upgrade Plans CERN to collaborate with the companies on the development of the OPC UA servers Develop in-house knowledge of the code to improve troubleshooting and issue reporting to the company Restrict the work done by the companies to communication with hardware Provide coherency and promote utilization of common software components across OPC servers Expected in production by end of LS2 Still under discussion. Personal view

JCOP is very interested in initiatives like the ELMB++ ELMB Ageing ELMB designed to operate 10 years outside the ATLAS calorimeters 4.7 Gy (Expected dose rate)* 3.5(sim. rad level) * 1 (low dose rate effect) * 2 (COTS components homogeneous preselected) = 33 Gy = 3.3 kRad in 10 years JCOP is very interested in initiatives like the ELMB++ F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 12

Conclusions As many other systems, DCS builds on top of technologies chosen and decisions taken years ago Although if we were to do it all over again, things wouldn’t look very different New requirements have also appeared In same cases, there is a clear plan to upgrade Workshop to define the long term objectives for JCOP to be scheduled early this Summer F. Varela – CERN EN/ICE – ACES 2014 – 20th March 2014 DCS Plans for Upgrade - 13