1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.

Slides:



Advertisements
Similar presentations
Report ~first collision Kotaro Kijima 2010/01/25 Local lab meeting.
Advertisements

1 Summary on the Wednesday access of BBC FEM 07/28/05 Kazuhisa Yamaura Koutaro Kijima Daisuke Watanabe Misaki Ouchida.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
FPIX0 Electronic Test Marina Artuso Paul Gelling Jianchun Wang  The system works fine with charge injection calibration  Gain curve, threshold, and noise.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
1 ATF Linac status and future plan E=1.28GeV Ne=2x10 10 e-/bunch Bunch#/shot 1 ~ 20 bunches(2.8ns spacing) Bunch#/shot 1 ~ 10 bunches(5.6ns spacing) Rep.
ITOP carrier amplifier test at Indiana University G. Visser 4/27/2015 (latest update) I use the recently (here) characterized JT0947 ch3 as input source.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
What have we done? for Run9 around first collision ~2009/03/01 Kotaro Kijima Masaya Nihashi.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Current Status of Hadron Analysis Introduction Hadron PID by PHENIX-TOF  Current status of charged hadron PID  CGL and track projection point on TOF.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Analysis of Endstation A setup Josef Uher. Quartz bar Start counter.
Simple Solutions to Simple Problems Global Trigger of a Post Mortem Event Don McGilvery Australian Synchrotron.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
Introduction to PHENIX Beam Beam Counter (BBC)
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester Status of the TOF February 22, 2001 Straight-line tracking What have we learned?
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
Nov 2002T. Ljubicic DAQ100 Calibration Needs 10 to 8 bit (and back!) conversion table Gain correction per pad T0 correction per pad.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
Development of a pad interpolation algorithm using charge-sharing.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
1 Report on PHENIX work in Apr/May/Jun Kotaro Kijima 大西洋~
CDH time resolution M.Tokuda. 目的: CDH の基本性能である時間分解能を調べる ・まず TDC-calibration を行った。 次の回路によりチャンネルあたりの時間 ([s]/[ch]) を 測定した。 Pulse generatordelayTDC(100ns.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Yonsei – Tsukuba Workshop / Hiroshi Tsuruoka / Aug 1 Current Status of TOF Analysis 1. PHENIX 実験とは 2.なぜ新たな検出器が必要か? 3. Time Zero Counter の設計 4.テスト実験(
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
Rainer Stamen, Norman Gee
Fabio, Francesco, Francesco and Nicola INFN and University Bari
Weekly PDL report (Jul 7-14)
Week coordinator report - C. Marchand
BNL electronics: first tests
Maki KUROSAWA VTX Group 2014 Feb 20
BESIII EMC electronics
Presentation transcript:

1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya

2 BBC hardware work Interlock test - one ADAM module was not worked -> replace it to a new module - one thermocouple broke (S2-4) -> will fix after run7 External charge scan - Adc conversion factor (BbcCalib.adc) - find one Adc to lost linearity (Adc[72]) -> replace QVC + ADC Internal charge & timing scan - Tdc conversion factor (BbcCalib.tdc0 & tdc1) - one of test pulse injector was not worked (Adc[85]) -> replace discriminator for Tdc0&Tdc1 - Adc[126] was not worked properly -> replace QVC + ADC for Adc[126] Measurement of noise rate - a few thousand Hz at most (th = 30 mV)

3 Interlock test [結果] ZOOM 交換した ADAM ⇒ Fixed ! 壊れている熱電対 ⇒ run7 の後に修理

4 External charge scan ~ Before replacement ~ ~ After replacement ~ We got proper gain curve for Adc[72] after replacement of two daughter cards (QVC+ADC).

5 Internal charge & timing scan ~ Before replacement ~ ~ After replacement ~  Adc[85] was fixed after replacement of discriminators Tdc0&Tdc1).  Adc[126] was fixed after replacement of two daughter cards (QVC+ADC).

6 Calibrations and Time-in Calibrations and Time-in Time-in - Adjust global timing offset ⇒ position delay : 170 fine delay (ch 7) : 60 Pedestal scan - Adc pedestal (BbcCalib.pedstal) HV optimization - magnetic field off ⇒ Run7/070323/opHV_run7_bon_ pdf - magnetic field on ⇒ Run7/070402/opHV_run7_boff_ pdf Gain calibration - PMT gain (BbcCalib.pmtgain) Slewing calibration - slewing parameter (BbcCalib.slewpar0&slewpar1) Update LUT & Data Base

7 Global timing offset was adjusted on v124. Collision events are in the middle of Tdc window. V124 Blue Beam Sync -position delay : 170 -fine delay (ch 7) : 60 Time in

8 pedestal was extrapolated by using gain curve as a function of threshold. run list ========================== Threshold of Tdc0 run # ========================== 5mV run mv run mv run mv run mv run ========================== Pedestal scan

9 BBC play a role of not only trigger but centrality determination. We have to optimize HV to satisfy both requirements. 1) Trigger : MIP peaks must not be cut off by threshold since BBC play a role as trigger. 2) Centrality : We must assure linearity of Centrality. We need to pay attention to overflow of Adc under high multiplicity environment like Au+Au collision. I consider these criteria, especially about PMTs which belongs to the inner ring. HV optimization

10 We optimized HV for B ON. Tdc<2600 Isolation cut HV was optimized ~30 V decrease overflow Tdc<2600 Isolation cut Run Run Tdc<2600 HV optimization : B ON

11 HV optimization : B OFF We optimized HV for B OFF. Tdc<2600 Isolation cut Tdc<2600 Run

12 - tdc0 < isolation cut gain calibration was done. Gain calibation Run (B ON) - tdc0 < isolation cut Run (B OFF)

13 slewing calibration was done. Slewing correction Slewing calibarion Run (B ON) Slewing correction Run (B OFF)

14  LUT : We made LUT ⇒ need z offset from DC guys to finalize it.  DB : version 4001 & 4002 were updated ⇒ need z offset from DC guys to finalize it. LUT and DataBase We are waiting for getting z offset calculated by DC&PC.

15 other problems, solutions, remaining tasks other problems, solutions, remaining tasks Laser offset calculation HV mainframe 16 - problem 1 : HV module was tripped - problem 2 : HV mainframe was tripped ⇒ 1) fix 5 fans since 5 fans were not worked 2) replace the HV mainframe 16 Remaining tasks - LUT will be updated (the final version) - Data Base will be updated (ver 4001, ver4002) ⇒ We are waiting for getting z offset calculated by DC&PC in order to finalize calibrations

16 Laser offset calculation Laser offset calculation The special connector were attached in laser fiber of North-bottom. -Laser signal could get delayed. -Laser intensity could decrease.

17 Before correction Affter correction Laser offset calculation Laser offset calculation - Delay depended on laser intensity were automatically fixed by slewing correction - Delay by connection of the connector were fixed by manually as shown above.

18 Laser offset calculation Laser offset calculation Black : before correction Red : after correction We calculated Zvertex offset by laser after corrected systematical delay of North-Bottom.

19 1) HV became Disable. for HV_BB_N-1 & HV_BB_N-1 2) Status indicator shows.. HV_BB_N-1 : 10 HV_BB_N-2 : 40 **status 10 means “Trip -- Violation of supply limits” I'm not sure for status 40 HV mainframe 16 : problem 1 HV mainframe 16 : problem 1

20 1) HV mainframe looks like OFF but actually ON. 2) Measured voltage went to 0V. But HV is “Enable” for HV_BB_N-1 & HV_BB_N-1 HV mainframe 16 : problem 2 HV mainframe 16 : problem 2

21 HV mainframe 16 : Solutions? HV mainframe 16 : Solutions? N4 N3 Slot 0 Slot Slot 11.. N2 N1 0 1  Cable N1 and N2 are separated. ⇒ problem 1 was disappeared  Fix fans on the HV crate since 5 fans (total 12 fans) broke  HV mainframe 16 was replaced ⇒ problem 2 is not seen so far

22 Remaining tasks Remaining tasks  LUT will be updated as the final version  Data Base will be updated (ver 4001, ver4002) We are waiting that DC guy’s work has finished for the final update.