ELENA Source Vacuum System, LNS R. Kersevan Integration and Installation Committe – 18 Sept 2014.

Slides:



Advertisements
Similar presentations
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
Advertisements

February 17-18, 2010 R&D ERL David Pate R&D ERL Photocathode Deposition and Transport System David Pate February 17-18, 2010 Photocathode Deposition and.
Vacuum Fundamentals High-Vacuum Technology Course Week 8 Paul Nash HE Subject Leader (Engineering)
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
Stewart Shen October 27, LCLS-XTOD Gas Attenuator LCLS FAC Meeting October 27, 2005 Stewart Shen, Keith Kishiyama and Marty Roeben.
Platzhalter Bild Vacuum Transfer System for loading the Sartorius Prototype Mass Comparator CCL1007 Thomas Fehling, NCSLI-Conference, Washington D.C.,
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Shielding the Turbomolecular Pump: an update 14 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Techniques of Vacuum and Basics of High Voltage (2/3) Pauli Heikkinen Jyväskylä University.
Vacuum studies at LAL Bruno Mercier, Christophe Prevost Alexandre Gonnin, Christian Bourgeois, Dirk Zerwas R.P. ILD MDI Meeting 24/3/15.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
M. WONGPIXEL MECHANICAL GROUP MEETING 14 JAN % Model Outgassing Rate Measurement Model building status Setup Method explanation –Throughput method.
Polarized GaAs photo cathode development and the preparation of Gatling Gun cathodes at BNL The Single Cathode Activation Chamber.
DDEP 2012 | C. Bisch – Study of beta shape spectra 1 Study of the shape of  spectra Development of a Si spectrometer for measurement of  spectra 
Summary of Rb loss simulations The goal: assess different techniques for optimization density gradient at the ends of plasma cell.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
1 NEG COATING RESULTS AND TRENDS R. Kersevan, Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab Workshop on Vacuum Systems for Synchrotron Radiation.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
1 MONTECARLO CALCULATIONS OF PRESSURE PROFILES FOR THE ESRF DIPOLE/CROTCH AREA R. Kersevan – Vacuum Group, Tech.Serv.Division, ESRF, Grenoble ALBA-MaxLab.
Status of the activities on the vacuum system C. Garion TBMWG, 27/03/2013 Outline: ON/OFF mechanism: tribology study Pumping technology: MB quad VC Accelerating.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
Cryo Pump Limitations Recent operating issues with helium Mick Mann ANSTO – Lucas Heights - Australia.
Lukasz Krzempek TE-VSC-DLM 29th WP8 Bi-weekly meeting Tuesday, 15th November 2015 Vacuum layout (Experimental side)
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
ELENA installation progress F. Butin / ELENA collaboration.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Vacuum System P. Chiggiato TE-VSC
First ideas on particle free installation of BESSY VSR
Vacuum Simulations for ELENA’s LNR-01 R. Kersevan IIC Meeting 9/6/2015
Sub-system integration for the VBOX
ELENA – Vacuum chambers and vacuum activities
ELENA installation and commissioning status
SAES Project: Combination of NEG module and sputter ion pump
R. Kersevan, TE-VSC-VSM 30/06/2016
CAS 2017 Vacuum simulations
CAS 2017 Vacuum simulations
XFEL Collimation and Beam Switchyard Vacuum Issues
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Undulator Vacuum System
PANDA The conceptual design of the control Dewar
Undulator Vacuum System
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum System Design for the Target Monolith System
Presentation transcript:

ELENA Source Vacuum System, LNS R. Kersevan Integration and Installation Committe – 18 Sept 2014

ELENA LNS Vacuum System - R. Kersevan – IIC Meeting – 18Sept2014 Agenda: 1.Integration Layout (LNS + first part of LNE00) 2.Vacuum Hardware: Pumps, Gauges, Valves, etc… 3.Pressure Profile Calculations 4.Conclusions

ELENA LNS Vacuum System - R. Kersevan – IIC Meeting – 18Sept Design and Integration Status Report Design of the LNS line has evolved to a mature stage; All necessary vacuum devices have been integrated; Optimized design of a Differential Pumping System (DPS) has been done, and integrated;

ELENA LNS Vacuum System - R. Kersevan – IIC Meeting – 18Sept Design and Integration Status Report List of vacuum hardware: Pumps: 4x 1200 l/s turbos 1x 1400 l/s “ZAO” NEG 1x 1000 l/s NEXTorr Bellows: 3x Gauges: 4x ionization + 4x Pirani Gate Valves: 1x DN x DN63 (Series 48, all-metal) Manual Valves: 3x DN35 (all- metal)

ELENA LNS Vacuum System - R. Kersevan – IIC Meeting – 18Sept Pressure profile calculations LNS, the Ion-Switch (IS), and the part of LNE00 connecting the IS with LNR have been modelled in detail As usual, the montecarlo code Molflow+ has been used. The CAD models exported in STL format have been used The gas load of the H +- source, as per R. Gebel, has been simulated: E-2 mbar*l/s (6 sccm) The transmission probability from the source to the “Y” chamber pumping the electrostatic (ES) kicker on LNR has been calculated

ELENA LNS Vacuum System - R. Kersevan – IIC Meeting – 18Sept Transmission Probabilities (pumping surfaces in RED) Source to IS: ~ 2.4E-4; IS to LNR: ~ 1.2E-2; Combined: ~3.0E-6 Gas Load to LNR: ~ 2.8E-7 mbar*l/s

ELENA LNS Vacuum System - R. Kersevan – IIC Meeting – 18Sept Conclusions The challenging design of the DPS for LNS has been done: integration considerations have left only 60 cm for the DPS! In spite of that, only ~ 1 H 2 molecule out of 4,500 reaches the Ion-Switch; Of the initial gas load of 9.44E-2 mbar*l/s only 2.8E-7 reach the “Y” chamber on LNR. A similar amount will reach LNR moving down LNI, to the injection septum/kicker assembly; The pressure rise at LNR will be only marginal, and should not saturate neither the NEG pumps nor the NEG-coating of the LNR; Fabrication of the components of LNS can and should start soon, in order to meet the pre-commissioning schedule; OPEN ISSUE: a 30 mm ID orifice restriction between the two domes of the DPS is suggested, as it decreases the transmission probability

ELENA LNS Vacuum System - R. Kersevan – IIC Meeting – 18Sept2014 Many thanks to C. Eymin, L. Dassa, S. Maridor for providing informations, documents, data and help