API SC6 Work Group Plan for Development of HPHT Flange Design Requirements Date: June 25 th, 2015.

Slides:



Advertisements
Similar presentations
Review of Task Force Progress to Date: Where We Were Policy Research Small Group Work Presentations Transcriptions Policy vs. Procedure Final Report.
Advertisements

1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
SC6 Ballot 1974: Adopt-back of ISO 10423:2009 as API 6A 20 th ed. Task Group Report on Resolution of Ballot Comments Eric Wehner 30 June 2010.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
API 20K Flange Design Task Group API SC6 Task Group
1st Hungarian-Ukrainian Joint Conference on SAFETY-RELIABILITY AND RISK OF ENGINEERING PLANTS AND COMPONENTS” BAY-LOGI 1 Fatigue calculations on benchmark.
Abstract/Objectives Better understand the effects of typical GD&T variations on Bolt Stresses in Torque Carrying Bolted Flanges Create Trend Curves for.
Float Equipment Specification June API Standardization Conference.
PROJECTS WITH POTENTIAL FUNDING
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Product Design and Qualification (Validation) Testing for HPHT Systems
Segmenting the Market to Reach the Targeted Population.
API 17TR11: Pressure Effects on Subsea Hardware During Pressure Testing in Deep Water (In Ballot) -Frans Kopp: Senior Principal Advisor Pipelines – Shell.
CSOEM MARG SUMMARY 24 June Meeting Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 24 June 2015.
한국매스타이트㈜ 한국매스타이트㈜ WHAT IS MASTITE NON-ASBESTOS ?
Progress Since January Meeting
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
1 API SC6 Winter Meeting Other Materials Issues Tim Haeberle Chief Consulting Engineer – Materials and Processes GE Oil & Gas 4 February 2015.
API 6HP Process1 API 6HP Example Analysis Project API E&P Standards Conference Applications of Standards Research, 24 June 2008.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
TG3 17TR8 Liaison Report HPHT Design Flow Chart
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
Safety and quality issues – studs and nuts Presentation API 6A Winter meeting Feb
Annual report TC67/SC4/WG3 Wellhead and Xmass tree ISO10423vs API 6A WG Scope:standardisation of wellhead and xmass trees plus valves WG convenor :Ries.
API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 14 June 2012 SC6 Summer Meeting - Westminster, CO1.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
NHS Reorganisation & the Implications for the interfaces.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
SC17 Materials Initiatives 2015 Summer Meeting Update.
Annual report TC67/SC4/WG3 Wellhead and Xmass tree ISO10423 and API 6A WG Scope:standardisation of wellhead and xmass trees plus valves WG convenor :Ries.
API 17TR8: High-pressure High-temperature (HPHT) Design Guidelines
Ethical issues with the regulatory use of gene expression data Benjamin S Wilfond MD Medical Genetics Branch National Human Genome Research Institute Department.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
Current Industry Assessment
Design Process 1.Selection of the type of structural form to be used and the material out of which the structure is to be made. 2.Determination of the.
Date of download: 5/31/2016 Copyright © ASME. All rights reserved. From: Considerations in the Design and Analysis of an ASME Section VIII, Div. 2 Reactor.
MAP Assembly Investigation A project summary for discussion during 4/11/2014 meeting.
Date of download: 6/21/2016 Copyright © ASME. All rights reserved. From: Design for Leakage in Flange Joints Under External Loads J. Pressure Vessel Technol.
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
BUS 475 Week 4 DQ 2 What things should be taken into consideration in the creation of a roadmap for a strategic plan? What are some examples of external.
Materials Qualification for Bolting Applications
API SC19 HPHT Template (Proposed as SC19TR1)
API 17TR8: High-pressure High-temperature (HPHT) Design Guidelines
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
Date of download: 1/1/2018 Copyright © ASME. All rights reserved.
Impact on SC 6 Documents by Kenneth Young
بسم الله الرحمن الرحیم.
2017 Exploration & Production Winter Standards Meeting
API RP 17A - Discussion Points
API SC6 Valves and Wellhead Equipment
API 16A June 2017 Specification for Drill-through Equipment
2016 Exploration & Production Standards Conference Subcommittee 10
MAWG’s deliverables status and proposed milestone
ISO TC64/SC4/WG2 May 2011 status
API SC 10, Work Group 3 Update:
Impact on SC 6 Documents by Kenneth Young
2016 Exploration & Production Summer Standards Conference
ISO viz. API 6A issues San Francisco 30th june 11
API 17 TR8 HPHT Design Guideline Methodology
Structural safety – Studs and nuts
2016 Exploration & Production Summer Standards Conference
Education and Training Statistics Working Group, May 2011
ICAO ACP Working Group M Iridium Sub Group Overview
TG3 17TR8 Liaison Report ASME Task Group on Subsea Applications
API SC6 Valves and Wellhead Equipment
Presentation transcript:

API SC6 Work Group Plan for Development of HPHT Flange Design Requirements Date: June 25 th, 2015

To provide recommendations to create a roadmap for the development of flange requirements for those sizes not currently addressed by API 6A, inclusive of those that may require application of HPHT protocols and high external load capacities. Work Group Charge

MEETINGS WG met on 6/17/2015 to discuss NWI from API SC6 winter meeting 2/4/2015. At meeting it was decided that the WG’s focus will be on developing the “road map” for the flange design vs. working on a particular size flange i.e. 18-3/4” 20K. Next meeting will be 7/9/2015.

POSSIBLE DESIGN CONSIDERATIONS New flange cross-section Make up Torque issues ( i.e. cf) Bolt material Gasket material concerns Gasket leakage and deformation Fatigue Temperature design and materials concerns Hub Separation NACE Design Criteria selection Load capacities with and w/o Temperature

DESIGN METHODOLOGY EXAMPLE Design Verification Design meets Load requirements Design Validation Testing Fatigue Analysis Design meets Fatigue life requirements Sealability Analysis Design Flange Structural and Functional Design Development Hub Separation Bolting 6A, 6X Taylor Forge, Eichenberg 17TR8, PER 15K Materials FEA ASTM, ASME

DELIVERABLES To provided Recommendations for the following Flange design philosophy Design acceptance criteria Flange external load capacities Standardized flange geometry