March 8, 2005 Commonly Used Bike Routes  Roughly half are located on arterials.  Topography makes east-west movement more difficult.  No marked bike.

Slides:



Advertisements
Similar presentations
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Advertisements

How did the Bicyclist Cross the Road? By: Mike Hendrix, PE, PTOEDate: June 26, 2012 A Case Study of Two Intersections in Seattle.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Transit Improvements on East-West Routes in Downtown Minneapolis Michael Mechtenberg Planner Metro Transit Minneapolis-St. Paul, MN.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Lane Width Reallocations Based on 5-Year Crash Data Richard C. Moeur, PE ADOT Traffic Design March 2007 edition.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Contact: Beth Morris
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Slide 1. Slide 2 Introduction How did you get to school as a child?
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Lec 34, Ch.5, pp : Pedestrian facilities (Objectives) Understand the number of accidents involving pedestrians is significantly high Learn the types.
VISION FOR A KEARNY TOD February 27, 2008 Rob Lane Regional Plan Association.
Town Core Streetscape and Accessibility Design Study  Elabd Architectural Illustration  Kathleen Ryan, Landscape Architect, ASLA Questions for Milton.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Designing For Complete Streets In Nashville Metropolitan Government of Nashville and Davidson County, Karl F. Dean, Mayor John W. Lynch, Director, Department.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Errol Heights Proposed Shared Street Pilot Project
From Island Estates Parkway to St. Johns County Line.
 Jebessa Dara  Josh Finley  Jon Gibson  Rodney Pfiefle.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
City of FARGO NP and 1 st Avenue North Corridor Development Plan NP AND 1ST AVENUE NORTH CORRIDOR DEVELOPMENT PLAN.
Roads. way the Milky Way galaxy a thoroughfare for travel or transportation from place to place.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
2701 Barnard Way Santa Monica Pier OCEAN LODGE HOTEL 1665 Ocean Avenue 20’ R.O.W 2701 Barnard Way APN: Barnard Way APN:
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Joint Urban Roadway Standards Workshop April 27, 2006.
Chapter 1: Highway Functions
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
APWA Management & Public Administration Committee Creating Complete Streets to Accommodate All Users May 23, 2012.
JAMESBURG, NEW JERSEY Edward J. Bloustein School of Planning and Public Policy.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Highway Functional Classification Chapter 16 Dr. TALEB M. AL-ROUSAN.
LE DROIT PARK TRANSPORTATION PACKAGE. BACKGROUND Neighbors across LeDroit have been dealing with many transportation related issues over the years with.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Sustainable Traffic Management: Freiburg, Germany
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
Xiaoyue (Cathy) Liu Wenjuan Zhao Barrett Taylor Department of Civil & Environmental Engineering University of Washington.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting May 13-14, 2014.
Complete Streets Training
On-Street Bike Facilities – Parking Protected Bike Curb.
SEPARATED BIKE LANE PLANNING AND DESIGN GUIDE. Separated Bike Lane Planning and Design Guide Context Conforms to federal and state standards and guidelines:
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Complete Streets Training Module 4a – Understanding Context.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
City of Gresham – Hauton B
District 3 Complete Streets Projects
Bike Boulevard 4.6 miles of bike lanes, bike dots, shared lane markings and guide signs on collector and local streets. March-April 2012.
SE 12th Street Roadway Improvements February 8, 2005.
HSM Applications to Multilane Urban Suburban Multilane Intersections
State Aid Standards Development
DDOT Western Avenue, NW Project
Design Standards.
Presentation transcript:

March 8, 2005 Commonly Used Bike Routes  Roughly half are located on arterials.  Topography makes east-west movement more difficult.  No marked bike lanes.

March 8, 2005 Bike Facilities  Satisfactory Elements  Lower traffic volumes (residential areas)  Wider shoulder lanes (College Way, N 92 nd Street, and some local streets)  Flat topography towards the east N 92 nd Street near Meridian Avenue N

March 8, 2005 Bike Facilities  Unsatisfactory Elements  On-street parking  Many mid-block driveways  High traffic volumes (arterials)  Soft shoulder where curb & gutter does not exist Meridian Avenue NE near NE 107 th Street

March 8, 2005 Transit Coverage  Urban Centers (60%/15/15)  Midday service & coverage for U District needs improvement.  Service & coverage adequate for downtown.  Neighboring Areas (60%/15/30)  Adequate service and coverage for Lake City.  Remaining neighboring destinations needs an increase in coverage and/or service.  Local (70%/30/30)  Adequate service & coverage.

March 8, 2005 Examples of Non-Arterial Street Performance NE 98 th St12 th Ave NENE 115 th StNE 90 th St E/O 12 th Ave NEN/O NE 102 nd StE/O 9 th Ave NEW/O 12 th Ave NE 85% Speed Vehicles/day Pedestrian facility 20 0 Collision 0000 School walkway 10 0 Pedestrian route 0000 Bicycle route 5055 Street feature 3221 TOTAL